Integrated scheduling of a multi-site mining supply chain with blending, alternative routings and co-production

被引:14
|
作者
Hilali, Hajar [1 ,2 ]
Hovelaque, Vincent [1 ,2 ]
Giard, Vincent [1 ,3 ]
机构
[1] Mohammed VI Polytech Univ, EMINES Sch Ind Management, Ben Guerir, Morocco
[2] Univ Rennes, CNRS, CREM UMR 6211, Rennes, France
[3] Univ Paris 09, PSL Res Univ, Paris, France
关键词
Integrated scheduling; multi-site; blending; alternative routings; co-production; mining supply chain; OPERATIONAL FLEXIBILITY; GLOBAL OPTIMIZATION; SELECTION; SYSTEMS; MODEL;
D O I
10.1080/00207543.2022.2049909
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper proposes a multi-site global optimisation model of blending operations, alternative routings and order scheduling with a co-production flow. It is performed in a phosphoric supply chain owning three open-pit mines of different geological structures and chemical compositions, each having a dry blending plant. One main challenge of the phosphate industries is to produce merchantable ores (MO) that verify a quality charter (chemical composition) with chemical heterogeneous source ores (SO). Thus, a process of SO blending followed by a treatment is mostly necessary to obtain the required MO. Six alternative routings exist to produce an MO; one of them involving a calcination plant generates a co-product. The model objective is to determine the least costly production programme of a set of MO orders to be delivered within precise time windows, in given quantities and compliance with a specific quality charter, by assigning for each MO its blending plant, routing, blend of SOs and production schedule; it also defines the feeding of the blending plants. A real case study illustrates the proposed model.