共 50 条
- [32] ASSEMBLY LINE BALANCING PROBLEM WITH STOCHASTIC SEQUENCE-DEPENDENT SETUP TIMES PAMUKKALE UNIVERSITY JOURNAL OF ENGINEERING SCIENCES-PAMUKKALE UNIVERSITESI MUHENDISLIK BILIMLERI DERGISI, 2015, 21 (04): : 152 - 157
- [33] Simultaneous Multi-skilled Worker Assignment and Mixed-model Two-sided Assembly Line Balancing INTERNATIONAL JOURNAL OF ENGINEERING, 2016, 29 (02): : 211 - 221
- [35] A tabu search algorithm for two-sided assembly line balancing INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 43 (7-8): : 822 - 829
- [36] A tabu search algorithm for two-sided assembly line balancing The International Journal of Advanced Manufacturing Technology, 2009, 43 : 822 - 829
- [38] Balancing Stochastic Mixed-Model Two-Sided Disassembly Line Using Multiobjective Genetic Flatworm Algorithm IEEE ACCESS, 2021, 9 : 138067 - 138081