Increasing transmission potential of 110 kV alternating current lines

被引:0
|
作者
Kozyra, Jacek [1 ]
Lukasik, Zbigniew [1 ]
Kusminska-Fijalkowska, Aldona [1 ]
机构
[1] Kazimierz Pulaski Univ Technol & Humanities Radom, Fac Transport Elect Engn & Comp Sci, Radom, Poland
来源
PRZEGLAD ELEKTROTECHNICZNY | 2023年 / 99卷 / 11期
关键词
High Temperature Wires; Wire capacity; Adaptive works; AFL; ACSR; ACSS/TW;
D O I
10.15199/48.2023.11.08
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Construction of new power lines is a complicated and long-lasting formal and legal process. The duration of the investments is extended by trade arrangements, public consultations in order to delimit line corridor, time required to obtain necessary decisions, permits, analyses and opinions necessary to implement an enterprise. The main goal of this publication is to conduct an analysis and present the variants of possibility of rebuilding of a power network in the aspect of increasing transmission potential of existing 110kV lines, taking technical and financial aspects into account.
引用
收藏
页码:43 / 49
页数:7
相关论文
共 50 条
  • [21] Cold shrinkable joint for 66-kV and 110-kV XLPE cables applied to practical transmission lines
    Kurihara, Hiroaki
    Kobayashi, Shozo
    Kitaya, Masami
    Arashitani, Yoshihiro
    Oda, Hiroshi
    Serizawa, Toru
    Tashiro, Toyoaki
    Furukawa Review, 2001, (20): : 47 - 52
  • [22] Study on lightning protection of 110kV transmission lines in Qinghai-Tibet railway
    Wu, G. N.
    Li, R. F.
    Cao, X. B.
    Ren, X. N.
    Li, S. L.
    2008 IEEE/PES TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION, VOLS 1-3, 2008, : 391 - +
  • [23] Lightning Protection of the Explosion Airflow Arc-Quenching Gap for 110 kV Transmission Lines
    Wu, Dong
    Wang, Ju-feng
    ENERGIES, 2021, 14 (16)
  • [24] Residual life assessment of overhead transmission lines 110 kV and above and determination of their reconstruction terms
    Uteuliyev, Bauyrzhan
    METHODOLOGICAL PROBLEMS IN RELIABILITY STUDY OF LARGE ENERGY SYSTEMS (RSES 2017), 2017, 25
  • [25] Unsymmetrical Fault Location on 110 kV Lines
    Bukvisova, Zuzana
    Orsagova, Jaroslava
    Topolanek, David
    PROCEEDINGS OF THE 2018 19TH INTERNATIONAL SCIENTIFIC CONFERENCE ON ELECTRIC POWER ENGINEERING (EPE), 2018, : 178 - 182
  • [26] Current and voltage monitor of power-transmission lines for 66kV
    Nisiyama, E
    Kuwanami, K
    Kawano, M
    Matsuda, T
    Oota, I
    7TH WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL XIV, PROCEEDINGS: COMPUTER SCIENCE, ENGINEERING AND APPLICATIONS, 2003, : 83 - 87
  • [27] The assessment of the appropriateness of 110 kV overhead lines
    Dvorsky, Emil
    Hejtmankova, Pavla
    PROCEEDINGS OF THE 14TH INTERNATIONAL SCIENTIFIC CONFERENCE ELECTRIC POWER ENGINEERING 2013, 2013, : 449 - 453
  • [28] Effect of Rain Drops on Corona Discharge in Alternating Current Transmission Lines with a Corona Cage
    Chen, Lan
    Bian, Xingming
    Wang, Lingming
    Guan, Zhicheng
    JAPANESE JOURNAL OF APPLIED PHYSICS, 2012, 51 (09)
  • [29] A second-order cone model of transmission planning with alternating and direct current lines
    Lesage-Landry, Antoine
    Taylor, Joshua A.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2020, 281 (01) : 174 - 185
  • [30] Current-Carrying Capacity of Stranded Conductors for Overhead Lines in the Range Between 1 kV and 110 kV.
    Kuehne, Guenter
    Energietechnik Leipzig, 1982, 32 (09): : 345 - 350