A distributionally robust production planning model for maximizing customer satisfaction with budget and carbon emissions constraints

被引:3
|
作者
Han, Lisha [1 ]
Wu, Peng [1 ]
Chu, Chengbin [1 ,2 ]
机构
[1] Fuzhou Univ, Sch Econ & Management, Fuzhou 350108, Peoples R China
[2] Univ Gustave Eiffel, ESIEE Paris, COSYS GRETTIA, F-77454 Marne La Vallee, France
基金
中国国家自然科学基金;
关键词
Green production planning; Environmental awareness; Distributionally robust optimization; Customer satisfaction; LOT-SIZING PROBLEM; AVERAGE APPROXIMATION METHOD; OPTIMIZATION; UNCERTAINTY; DECOMPOSITION; FORMULATIONS; ALGORITHM; SYSTEMS; PRICE;
D O I
10.1016/j.cie.2023.109412
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper investigates a new stochastic green production planning problem without full knowledge about the probability distribution on customer demands. The only information regarding the demand is the means and covariance matrix. The goal of the study is to provide an eco-conscious manufacturer with solution methods capable of yielding, within a reasonable amount of computation time, a robust solution that maximizes customer satisfaction while taking into account the constraints of budgets and periodic carbon caps spontaneously set out of environmental awareness. We formulate the problem into a novel distributionally robust chance-constrained optimization model under demand uncertainty set. To effectively solve the model, two heuristics are proposed. The widely used sample average approximation (SAA) scheme is first deployed as a benchmark method. However, the computation time increases rapidly with the problem size. In some instances, even feasible solutions cannot be found within a reasonable amount of computation time. We then develop an approximated mixed-integer reformulation on the basis of second order cone program (SOCP). A real-world case is solved and extensive numerical experiments show that the SOCP heuristic is superior over the SAA heuristic in terms of computation time while the solution quality is only slightly lower in most of instances. Finally, sensitivity analysis on budgets, periodic carbon caps, the maximum budget overrun risk level, initial inventory levels, and the magnitude of demand uncertainty are conducted and useful managerial insights are derived.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] A robust optimization model for production planning of perishable products
    Leung, S. C. H.
    Lai, K. K.
    Ng, W-L
    Wu, Y.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2007, 58 (04) : 413 - 422
  • [32] Integrating the Kano model into a robust design approach to enhance customer satisfaction with product design
    Chen, Chun-Chih
    Chuang, Ming-Chuen
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 114 (02) : 667 - 681
  • [33] Distributionally Robust Low-carbon Dispatch of Park-level Integrated Energy System Considering Uncertainty of Customer Response
    Jin X.
    Sun L.
    Ding M.
    Wen F.
    Sun W.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (16): : 10 - 21
  • [34] A new distributionally robust p-hub median problem with uncertain carbon emissions and its tractable approximation method
    Yin, Fanghao
    Chen, Yanju
    Song, Fengxuan
    Liu, Yankui
    APPLIED MATHEMATICAL MODELLING, 2019, 74 : 668 - 693
  • [35] Module-based model change planning for improving reusability in consideration of customer satisfaction
    Tsubouchi, Kensuke
    Takata, Shozo
    ADVANCES IN LIFE CYCLE ENGINEERING FOR SUSTAINABLE MANUFACTURING BUSINESSES, 2007, : 11 - +
  • [36] Module-based model change planning in consideration of environmental impact and customer satisfaction
    Watanabe, Megumi
    Takata, Shozo
    FOURTH INTERNATIONAL SYMPOSIUM ON ENVIRONMENTALLY CONSCIOUS DESIGN AND INVERSE MANUFACTURING, PROCEEDINGS, 2005, : 170 - 176
  • [38] INTEGRATED OPTIMIZATION MODEL FOR PRODUCTION PLANNING AND SCHEDULING WITH LOGISTICS CONSTRAINTS
    Chen, Y. X.
    INTERNATIONAL JOURNAL OF SIMULATION MODELLING, 2016, 15 (04) : 711 - 720
  • [39] Research of Traffic Network Equilibrium Model with Low Carbon Emissions Constraints
    Meng, Meng
    Shao, Chunfu
    Zhang, Xin
    DISASTER ADVANCES, 2012, 5 (04): : 1022 - 1025
  • [40] A Ga-based model for maximizing precast plant production under resource constraints
    Leu, SS
    Hwang, ST
    ENGINEERING OPTIMIZATION, 2001, 33 (05) : 619 - 642