Risk-Aware Dimensioning and Procurement of Contingency Reserve

被引:5
|
作者
Mieth, Robert [1 ]
Dvorkin, Yury [1 ]
Ortega-Vazquez, Miguel A. [2 ]
机构
[1] NYU, Dept Elect & Comp Engn, New York, NY 10012 USA
[2] Elect Power Res Inst, Palo Alto, CA 20005 USA
关键词
Power system management; power system reliability; risk analysis; SPINNING RESERVE; UNIT COMMITMENT; SECURITY; REQUIREMENTS; ENERGY; RELIABILITY; GENERATION; SYSTEMS; MARKET;
D O I
10.1109/TPWRS.2022.3174343
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Current contingency reserve criteria ignore the likelihood of individual contingencies and, thus, their impact on system reliability and risk. This paper develops an iterative approach, inspired by the current security-constrained unit commitment (SCUC) practice, enabling system operators to determine risk-cognizant contingency reserve requirements and their allocation with minimal alterations to the current SCUC practice. The proposed approach uses generator and transmission system reliability models, including failure-to-synchronize and adverse conditions, to compute contingency probabilities. These probabilities are then used to inform a reliability assessment of the system using a suitable risk metric, i.e., expected energy not served. By iteratively learning the response of generators to post-contingency states within the SCUC we ensure reserve deliverability in this risk-assessment. The effectiveness of the proposed approach is demonstrated using the Grid Modernization Lab Consortium update of the Reliability Test System.
引用
收藏
页码:1081 / 1093
页数:13
相关论文
共 50 条
  • [41] Risk-Aware Design and Management of Resilient Networks
    Cholda, Piotr
    2014 NINTH INTERNATIONAL CONFERENCE ON AVAILABILITY, RELIABILITY AND SECURITY (ARES), 2015, : 468 - 475
  • [42] Risk-Aware Model-Based Control
    Yu, Chen
    Rosendo, Andre
    FRONTIERS IN ROBOTICS AND AI, 2021, 8
  • [43] Risk-Aware Management of Distributed Energy Resources
    Zhang, Yu
    Gatsis, Nikolaos
    Kekatos, Vassilis
    Giannakis, Georgios B.
    2013 18TH INTERNATIONAL CONFERENCE ON DIGITAL SIGNAL PROCESSING (DSP), 2013,
  • [44] Proactive and Reactive Risk-Aware Project Scheduling
    Waledzik, Karol
    Mandziuk, Jacek
    Zadrozny, Slawomir
    2014 IEEE SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE FOR HUMAN-LIKE INTELLIGENCE (CIHLI), 2014, : 94 - 101
  • [45] Dynamic Programming for Risk-aware Sequential Optimization
    Yu, Pengqian
    Haskell, William B.
    Xu, Huan
    2017 IEEE 56TH ANNUAL CONFERENCE ON DECISION AND CONTROL (CDC), 2017,
  • [46] Risk-Aware Leak Detection at Binary Level
    Koizumi, Yuta
    Arahori, Yoshitaka
    2020 IEEE 25TH PACIFIC RIM INTERNATIONAL SYMPOSIUM ON DEPENDABLE COMPUTING (PRDC 2020), 2020, : 171 - 180
  • [47] Risk-Aware Wireless Positioning in Maritime Environment
    Seok, Keun Young
    Ryu, Jong Yeol
    Lee, Jung Hoon
    APPLIED SCIENCES-BASEL, 2019, 9 (10):
  • [48] Risk-Aware Routing for Optical Transport Networks
    Xia, Ming
    Tornatore, Massimo
    Martel, Charles
    Mukherjee, Biswanath
    2010 PROCEEDINGS IEEE INFOCOM, 2010,
  • [49] Risk-aware classification via uncertainty quantification
    Sensoy, Murat
    Kaplan, Lance M.
    Julier, Simon
    Saleki, Maryam
    Cerutti, Federico
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 265
  • [50] Uncertainty Principles in Risk-Aware Statistical Estimation
    Koumpis, Nikolas P.
    Kalogerias, Dionysios S.
    2021 60TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2021, : 5896 - 5903