The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance
被引:15
|
作者:
Zhang, Hong Min
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R ChinaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Zhang, Hong Min
[1
]
Chong, Heap-Yih
论文数: 0引用数: 0
h-index: 0
机构:
Curtin Univ, Sch Design & Built Environm, Perth, WA, AustraliaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Chong, Heap-Yih
[2
]
Zeng, Yu
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R ChinaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Zeng, Yu
[3
]
Zhang, Wei
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R ChinaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Zhang, Wei
[3
]
机构:
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
[2] Curtin Univ, Sch Design & Built Environm, Perth, WA, Australia
[3] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Purpose Building information modeling (BIM) has brought great advantages to project delivery and performance. However, BIM has also increased the complexity of projects. Research shows that for BIM implementation to have a positive impact in this innovative environment, BIM should be synchronized with stakeholder management. Therefore, this research aims to incorporate the theory of stakeholder management in BIM-enabled projects and determine the theory's intermediary role between BIM implementation and project performance. Design/methodology/approach An extensive literature review was conducted and 13 critical success factors (CSFs) for BIM implementation, 29 CSFs for stakeholder management and 6 CSFs for BIM project performance were identified. These measurement items were tested using a questionnaire survey method and analyzed using structural equation modeling. This research was focused on Chinese megaprojects or complex projects that were under a high level of development of BIM, which could reflect the complex stakeholder relationships and BIM implementation for project performance. Findings The results indicate that effective use of BIM can directly improve project performance. Further, stakeholder management has an important and positive intermediary role within the path of BIM implementation and project performance, particularly through (1) stakeholder dynamics (SD) and (2) stakeholder engagement or empowerment (SE). Originality/value The logical relationship of mutual influence among CSFs has been revealed for BIM-enabled projects. This research contributes to the effective collaboration and practice of BIM in the construction industry.
机构:
Ho Chi Minh City Univ Technol HCMUT, Fac Civil Engn, Dept Construct Engn & Management, Ho Chi Minh City, Vietnam
Vietnam Natl Univ Ho Chi Minh City, Ho Chi Minh City, VietnamHo Chi Minh City Univ Technol HCMUT, Fac Civil Engn, Dept Construct Engn & Management, Ho Chi Minh City, Vietnam
Sy Tien Do
Viet Thanh Nguyen
论文数: 0引用数: 0
h-index: 0
机构:
Ind Univ Ho Chi Minh City, Fac Civil Engn, Ho Chi Minh City, VietnamHo Chi Minh City Univ Technol HCMUT, Fac Civil Engn, Dept Construct Engn & Management, Ho Chi Minh City, Vietnam
机构:
Purdue Univ, Sch Construct Management Technol, Construct Automat Robot & Ergon Lab, W Lafayette, IN 47907 USAPurdue Univ, Sch Construct Management Technol, Construct Automat Robot & Ergon Lab, W Lafayette, IN 47907 USA
Hu, Xinran
Guo, Xingzhou
论文数: 0引用数: 0
h-index: 0
机构:
Purdue Univ, Sch Construct Management Technol, Construct Automat Robot & Ergon Lab, W Lafayette, IN 47907 USAPurdue Univ, Sch Construct Management Technol, Construct Automat Robot & Ergon Lab, W Lafayette, IN 47907 USA
Guo, Xingzhou
Chen, Yunfeng
论文数: 0引用数: 0
h-index: 0
机构:
Purdue Univ, Sch Construct Management Technol, Construct Automat Robot & Ergon Lab, W Lafayette, IN 47907 USAPurdue Univ, Sch Construct Management Technol, Construct Automat Robot & Ergon Lab, W Lafayette, IN 47907 USA
Chen, Yunfeng
CONSTRUCTION RESEARCH CONGRESS 2024: CONTRACTING, DELIVERY, SCHEDULING, ESTIMATING, ECONOMICS, AND ORGANIZATIONAL MANAGEMENT AND PLANNING IN CONSTRUCTION,
2024,
: 711
-
721