The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance
被引:15
|
作者:
Zhang, Hong Min
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R ChinaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Zhang, Hong Min
[1
]
Chong, Heap-Yih
论文数: 0引用数: 0
h-index: 0
机构:
Curtin Univ, Sch Design & Built Environm, Perth, WA, AustraliaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Chong, Heap-Yih
[2
]
Zeng, Yu
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R ChinaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Zeng, Yu
[3
]
Zhang, Wei
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R ChinaChongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Zhang, Wei
[3
]
机构:
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
[2] Curtin Univ, Sch Design & Built Environm, Perth, WA, Australia
[3] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing, Peoples R China
Purpose Building information modeling (BIM) has brought great advantages to project delivery and performance. However, BIM has also increased the complexity of projects. Research shows that for BIM implementation to have a positive impact in this innovative environment, BIM should be synchronized with stakeholder management. Therefore, this research aims to incorporate the theory of stakeholder management in BIM-enabled projects and determine the theory's intermediary role between BIM implementation and project performance. Design/methodology/approach An extensive literature review was conducted and 13 critical success factors (CSFs) for BIM implementation, 29 CSFs for stakeholder management and 6 CSFs for BIM project performance were identified. These measurement items were tested using a questionnaire survey method and analyzed using structural equation modeling. This research was focused on Chinese megaprojects or complex projects that were under a high level of development of BIM, which could reflect the complex stakeholder relationships and BIM implementation for project performance. Findings The results indicate that effective use of BIM can directly improve project performance. Further, stakeholder management has an important and positive intermediary role within the path of BIM implementation and project performance, particularly through (1) stakeholder dynamics (SD) and (2) stakeholder engagement or empowerment (SE). Originality/value The logical relationship of mutual influence among CSFs has been revealed for BIM-enabled projects. This research contributes to the effective collaboration and practice of BIM in the construction industry.
机构:
Univ Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, MalaysiaUniv Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, Malaysia
Chin, Andy Zhi Rong
Yi, Tang Hui
论文数: 0引用数: 0
h-index: 0
机构:
Univ Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, MalaysiaUniv Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, Malaysia
Yi, Tang Hui
Zakuan, Norhayati
论文数: 0引用数: 0
h-index: 0
机构:
Univ Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, MalaysiaUniv Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, Malaysia
Zakuan, Norhayati
Sulaiman, Zuraidah
论文数: 0引用数: 0
h-index: 0
机构:
Univ Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, MalaysiaUniv Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, Malaysia
Sulaiman, Zuraidah
Saman, Muhamad Zameri Mat
论文数: 0引用数: 0
h-index: 0
机构:
Univ Teknol Malaysia, Sch Mech, Johor Baharu, MalaysiaUniv Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, Malaysia
Saman, Muhamad Zameri Mat
Chin, Thoo Ai
论文数: 0引用数: 0
h-index: 0
机构:
Univ Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, MalaysiaUniv Teknol Malaysia, Azman Hashim Int Business Sch, Johor Baharu, Malaysia
Chin, Thoo Ai
2020 THE 6TH IEEE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT (ICIM 2020),
2020,
: 325
-
328
机构:
Centre for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, University of Malaya, Jalan Universiti, Wilayah Persekutuan, Kuala LumpurCentre for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, University of Malaya, Jalan Universiti, Wilayah Persekutuan, Kuala Lumpur
Rahim F.A.M.
Zakaria N.
论文数: 0引用数: 0
h-index: 0
机构:
Centre for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, University of Malaya, Jalan Universiti, Wilayah Persekutuan, Kuala LumpurCentre for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, University of Malaya, Jalan Universiti, Wilayah Persekutuan, Kuala Lumpur
机构:
Doctor, School of Engineering and Built Environment, Griffith University, 1 Parklands Dr, Southport, 4215, QLDDoctor, School of Engineering and Built Environment, Griffith University, 1 Parklands Dr, Southport, 4215, QLD
Nguyen T.S.
Mohamed S.
论文数: 0引用数: 0
h-index: 0
机构:
Doctor, School of Engineering and Built Environment, Griffith University, 1 Parklands Dr, Southport, 4215, QLDDoctor, School of Engineering and Built Environment, Griffith University, 1 Parklands Dr, Southport, 4215, QLD
机构:
Chongqing Univ, Sch Construct Management & Real Estate, Chongqing 400045, Peoples R ChinaChongqing Univ, Sch Construct Management & Real Estate, Chongqing 400045, Peoples R China
Tang, Xi
Chong, Heap-Yih
论文数: 0引用数: 0
h-index: 0
机构:
Curtin Univ, Sch Design & Built Environm, Perth, WA 6102, AustraliaChongqing Univ, Sch Construct Management & Real Estate, Chongqing 400045, Peoples R China
Chong, Heap-Yih
Zhang, Wei
论文数: 0引用数: 0
h-index: 0
机构:
Chongqing Univ, Sch Construct Management & Real Estate, Chongqing 400045, Peoples R ChinaChongqing Univ, Sch Construct Management & Real Estate, Chongqing 400045, Peoples R China