Seasonal performance of an energy pile heat pump system and prediction of building thermal load

被引:20
|
作者
Kong, Gangqiang [1 ,2 ]
Chen, Yu [1 ,4 ]
Wang, Lehua [1 ]
Meng, Yongdong [1 ]
Yang, Qing [3 ]
机构
[1] China Three Gorges Univ, Key Lab Geol Hazards Three Gorges Reservoir Area M, Minist Educ, Yichang, Peoples R China
[2] Hohai Univ, Key Lab Minist Educ Geomech & Embankment Engn, Nanjing, Peoples R China
[3] Dalian Univ Technol, State Key Lab Coastal & Offshore Engn, Dalian, Peoples R China
[4] 8 Daxue Rd, Yichang 443002, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Energy pile; Heat pump system; Coefficient of performance (COP); Prediction of thermal load; Higher-order surface fitting; Artificial neural network; LONG-TERM PERFORMANCE; GSHP; FOUNDATION; EXCHANGER;
D O I
10.1016/j.applthermaleng.2024.122359
中图分类号
O414.1 [热力学];
学科分类号
摘要
Ground source heat pumps (GSHPs) are widely used for cooling and heating buildings, which can reduce the burning of fossil fuels and contribute to the reduction of carbon emissions. Energy piles, as underground heat exchangers, have advantages over conventional buried borehole pipes, saving drilling costs and accelerating the construction period. However, few studies have focused on the actual operation of an energy pile heat pump system, and the prediction of the building thermal load can reduce the instrument arrangement and test recording time. Hence, a heat pump system was built in this study to serve a single lab using energy piles with a cap structure as the energy supply, and summer cooling and winter heating tests were conducted. Under the test conditions in this study, the GSHP had a faster start-up speed and less power consumption than the air source heat pump (ASHP), and the average coefficient of performance (COP) of the energy pile heat pump system was 3.78, which is 40.0 similar to 51.2% higher than that of the corresponding ASHP (the normative reference COP is 2.50 similar to 2.70). The methods of higher -order surface fitting and an artificial neural network model were both suitable for predicting building thermal load.
引用
收藏
页数:13
相关论文
共 50 条
  • [41] Performance investigation and power prediction of a trifunctional heat pump system
    Han, Youhua
    Zhang, Jili
    Ma, Liangdong
    Lu, Shixiang
    Lv, Hui
    Gong, Jian
    APPLIED THERMAL ENGINEERING, 2025, 266
  • [42] Investigation of thermal performance of a ground coupled heat pump system with a cylindrical energy storage tank
    Yumrutas, R
    Kunduz, M
    Ayhan, T
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2003, 27 (11) : 1051 - 1066
  • [43] Experimental study on the performance of multi-split heat pump system with thermal energy storage
    Kim, Gwi Taek
    Choi, Young Uk
    Chung, Yoong
    Kim, Mo Se
    Park, Keon Woo
    Kim, Min Soo
    INTERNATIONAL JOURNAL OF REFRIGERATION, 2018, 88 : 523 - 537
  • [44] Performance analysis of integrated solar heat pump VRF system for the low energy building in Mediterranean island
    Gilani, Hooman Azad
    Hoseinzadeh, Siamak
    Karimi, Hirou
    Karimi, Ako
    Hassanzadeh, Amir
    Garcia, Davide Astiaso
    RENEWABLE ENERGY, 2021, 174 : 1006 - 1019
  • [45] The Study on the Performance of Solar Photovoltaic and Air Source Heat Pump Composite Building Energy Supply System
    Tong, Jiannan
    Quan, Zhenhua
    Zhao, Yaohua
    Wang, Gang
    Cai, Junjie
    Chi, Yuanying
    10TH INTERNATIONAL SYMPOSIUM ON HEATING, VENTILATION AND AIR CONDITIONING, ISHVAC2017, 2017, 205 : 4082 - 4089
  • [46] Performance Assessment of Heat Pump and Solar Thermal Heating with Seasonal Storage Systems for Smart Microgrid Research Center Building at IAUN
    Zanjani, S. M. Hasan
    Shahinzadeh, Hossein
    Oskui, Azita Balali
    Yaici, Wahiba
    Longo, Michela
    Zanjani, S. Mohammadali
    2022 10TH INTERNATIONAL CONFERENCE ON SMART GRID, ICSMARTGRID, 2022, : 345 - 350
  • [47] Performance and optimization of a novel solar-air source heat pump building energy supply system with energy storage
    Wang, Yubo
    Quan, Zhenhua
    Zhao, Yaohua
    Wang, Lincheng
    Liu, Zichu
    APPLIED ENERGY, 2022, 324
  • [48] The Influence of Dynamic Load on Ground Source Heat Pump System Performance
    Wang, Jingjing
    Zeng, Yunfan
    Tian, Huifang
    Wu, Zhou
    ENERGY DEVELOPMENT, PTS 1-4, 2014, 860-863 : 1470 - +
  • [49] Dynamic simulation system of air source heat pump system based on building hourly load
    Wang, He
    Liu, Yong-Shun
    Liu, Xiao-Li
    Duan, Jin-Hui
    Xue, Song
    Shi, Hui
    Journal of Applied Sciences, 2013, 13 (09) : 1406 - 1414
  • [50] Numerical Evaluation of the Transient Performance of Rock-Pile Seasonal Thermal Energy Storage Systems Coupled with Exhaust Heat Recovery
    Amiri, Leyla
    de Brito, Marco Antonio Rodrigues
    Ghoreishi-Madiseh, Seyed Ali
    Bahrani, Navid
    Hassani, Ferri P.
    Sasmito, Agus P.
    APPLIED SCIENCES-BASEL, 2020, 10 (21): : 1 - 19