A Fault Location Algorithm for Multi-Section Combined Transmission Lines Considering Unsynchronized Sampling

被引:0
|
作者
Lak, Peng Y. [1 ]
Ha, Kwang-Min [1 ]
Nam, Soon-Ryul [1 ]
机构
[1] Myongji Univ, Dept Elect Engn, Yongin 17058, South Korea
关键词
fault location; multi-section combined transmission line; positive-sequence component; PSCAD/EMTDC; unsynchronized sampling; SCHEME;
D O I
10.3390/en17030703
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper introduces a fault location technique for multi-section combined transmission lines, utilizing unsynchronized fault record data. The approach determines the intersection points of the voltage magnitudes computed using the fault current and voltage records of each terminal and the constant line parameters of each section. Finally, the real fault location is identified based on the calculated inverse angle of equivalent impedance. To evaluate the performance of the proposed algorithm, a three-section combined transmission line is constructed using the PSCAD/EMTDC software version 5.0.0, and various fault scenarios are simulated and tested employing the proposed algorithm. The results indicate that the proposed algorithm is applicable to various types of faults in a multi-section combined transmission line; the estimations are accurate.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] Analysis of ground fault current distribution along nonuniform multi-section lines
    Buccheri, P. L.
    Mangione, S.
    ELECTRIC POWER SYSTEMS RESEARCH, 2008, 78 (09) : 1610 - 1618
  • [32] Accurate fault location algorithm for power transmission lines
    Sadeh, J
    Ranjbar, AM
    Hadjsaid, N
    Feuillet, R
    EUROPEAN TRANSACTIONS ON ELECTRICAL POWER, 2000, 10 (05): : 313 - 318
  • [33] Wide-Area Fault Location of Transmission Lines by Hybrid Synchronized/Unsynchronized Voltage Measurements
    Dobakhshari, Ahmad Salehi
    IEEE TRANSACTIONS ON SMART GRID, 2018, 9 (03) : 1869 - 1877
  • [34] Two-terminal AF location scheme for multi-segment combined transmission lines using unsynchronized measurements
    Ghazizadeh-Ahsaee, Mandi
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2019, 104 : 101 - 109
  • [35] Unsynchronized fault-location technique for two- and three-terminal transmission lines
    Elsadd, Mahmoud A.
    Abdelaziz, Almoataz Y.
    ELECTRIC POWER SYSTEMS RESEARCH, 2018, 158 : 228 - 239
  • [36] Wideband circularly polarised patch antenna with multi-section λ/4 transmission lines
    Wu, Qiong-Sen
    Zhang, Xiao
    Zhu, Lei
    Zhang, Gary
    ELECTRONICS LETTERS, 2019, 55 (22) : 1172 - 1173
  • [37] Practical fault location algorithm for multi-terminal transmission lines with radial structure
    Shu, Hongchun
    Chen, Xueyun
    Xu, Chengbin
    Dianli Xitong Zidonghue/Automation of Electric Power Systems, 1998, 22 (02):
  • [38] Effective algorithm for fault discrimination and estimation of fault location in transmission lines
    Gangolu, Suryanarayana
    Raja, P.
    Selvan, M. P.
    Murali, Venkata Kirthiga
    IET GENERATION TRANSMISSION & DISTRIBUTION, 2019, 13 (13) : 2789 - 2798
  • [39] An Accurate Fault Location Algorithm for Two-Terminal Transmission Lines Combined with Parameter Estimation
    Che, Renfei
    Liang, Jun
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 1953 - 1956
  • [40] Unsynchronized Fault Location Independent on Line Parameters for Transmission Systems
    Khater, Wagdy M.
    Elkalashy, Nagy I.
    Kawady, Tamer A.
    Taalab, Abdel-Maksoud I.
    Lehtonen, Matti
    2014 IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES CONFERENCE EUROPE (ISGT EUROPE), 2014,