A multi-agent system for integrated scheduling and maintenance planning of the flexible job shop

被引:4
|
作者
Pal, Manojkumar [1 ]
Mittal, Murari Lal [1 ]
Soni, Gunjan [1 ]
Chouhan, Satyendra S. [2 ]
机构
[1] MNIT Jaipur, Dept Mech Engn, Jaipur 302017, India
[2] MNIT, Dept CSE, Jaipur 302017, Rajasthan, India
关键词
Flexible job shop scheduling; Multi-agent system; Decentralized approach; Bidding; Maintenance planning; Availability constraints; Hybrid genetic algorithm; PARTICLE SWARM OPTIMIZATION; EVOLUTIONARY ALGORITHMS; GENETIC ALGORITHM; SEARCH ALGORITHM; TABU SEARCH; HYBRID; MAKESPAN; COLONY;
D O I
10.1016/j.cor.2023.106365
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper focuses on the problem of scheduling and maintenance planning of the Flexible Job Shop (FJS). Preventive maintenance is often being followed in the industry, which, if not considered while scheduling, may lead to unrealistic/sub-optimal schedules. Despite the importance of maintenance planning while scheduling, the problem has attracted very little attention in the literature. Further, the existing approaches assume centralized decision-making which not only suffers from low scalability but is not amenable to futuristic manufacturing systems such as industry 4.0. However, to the best of the authors' knowledge, no decentralized system has been reported for integrated scheduling and maintenance planning of the FJS. This paper proposes a multi-agent system, a popular approach for decentralized decision-making, for integrated scheduling and maintenance planning of FJSP. The efficacy of our approach is compared with the existing approaches by solving 11 problem instances with fixed (to be performed at the predefined time) and flexible (to be performed any time within a time window) maintenance.
引用
收藏
页数:14
相关论文
共 50 条
  • [1] A new immune multi-agent system for the flexible job shop scheduling problem
    Xiong, Wei
    Fu, Dongmei
    JOURNAL OF INTELLIGENT MANUFACTURING, 2018, 29 (04) : 857 - 873
  • [2] A new immune multi-agent system for the flexible job shop scheduling problem
    Wei Xiong
    Dongmei Fu
    Journal of Intelligent Manufacturing, 2018, 29 : 857 - 873
  • [3] Flexible job-shop scheduling with learning and forgetting effect by Multi-Agent System
    Renna, Paolo
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (04) : 521 - 534
  • [4] Multi-Agent Reinforcement Learning for Extended Flexible Job Shop Scheduling
    Peng, Shaoming
    Xiong, Gang
    Yang, Jing
    Shen, Zhen
    Tamir, Tariku Sinshaw
    Tao, Zhikun
    Han, Yunjun
    Wang, Fei-Yue
    MACHINES, 2024, 12 (01)
  • [5] Multi-Agent System for Flexible Job-shop Scheduling Problem Based on Human Immune System
    Xiong Wei
    Fu Dongmei
    PROCEEDINGS OF THE 31ST CHINESE CONTROL CONFERENCE, 2012, : 2476 - 2480
  • [6] Multi-Agent Reinforcement Learning for Job Shop Scheduling in Flexible Manufacturing Systems
    Baer, Schirin
    Bakakeu, Jupiter
    Meyes, Richard
    Meisen, Tobias
    2019 SECOND INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE FOR INDUSTRIES (AI4I 2019), 2019, : 22 - 25
  • [7] MODEL DESIGN OF JOB SHOP SCHEDULING BASED ON MULTI-AGENT SYSTEM
    Li Qing-song
    Du Li-ming
    2009 IITA INTERNATIONAL CONFERENCE ON SERVICES SCIENCE, MANAGEMENT AND ENGINEERING, PROCEEDINGS, 2009, : 233 - 236
  • [8] A multi-agent agile scheduling system for Job-Shop problem
    Wang, Zhanjie
    Liu, Yanbo
    ISDA 2006: SIXTH INTERNATIONAL CONFERENCE ON INTELLIGENT SYSTEMS DESIGN AND APPLICATIONS, VOL 2, 2006, : 679 - +
  • [9] Multi-objective Integrated Optimization Problem of Preventive Maintenance Planning and Flexible Job-Shop Scheduling
    Jing, Zha
    Hua, Jin
    Yi, Zhu
    PROCEEDINGS OF THE 23RD INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT 2016: THEORY AND APPLICATION OF INDUSTRIAL ENGINEERING, 2017, : 137 - 141
  • [10] A multi-agent model for reactive job shop scheduling
    Liu, N
    Abdelrahman, MA
    Ramaswamy, S
    PROCEEDINGS OF THE THIRTY-SIXTH SOUTHEASTERN SYMPOSIUM ON SYSTEM THEORY, 2004, : 241 - 245