Industry 4.0: smart preventive maintenance with optimal planning and scheduling process of the SMEs

被引:1
|
作者
Velmurugan, K. [1 ]
Saravanasankar, S. [1 ]
Venkumar, P. [1 ]
Paranitharan, K. P. [2 ]
Sudhakarapandian, R. [3 ]
机构
[1] Kalasalingam Acad Res & Educ, Dept Mech Engn, Krishnankoill 626126, Tamil Nadu, India
[2] TVS Sensing Solut Pvt Ltd, Madurai Melur Rd, Madurai 625122, Tamil Nadu, India
[3] Vellore Inst Technol, Sch Mech Engn, Vellore 632014, Tamil Nadu, India
关键词
small and medium sized enterprises; preventive maintenance; Markov birth-death process; remaining useful life; optimal planning and scheduling; OPTIMIZATION;
D O I
10.1504/IJVCM.2023.129267
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In the modern world, small and medium scale manufacturing industries face a lot of challenges to achieve the reliability, availability, and safety as important performance attributes of the shop floor. In which planning and scheduling of preventive maintenance activities are considered to be a major issue in SMEs. This study is to propose the optimal framework of the preventive maintenance (PM) planning and scheduling process in SMEs. The optimal maintenance parameters (failure rate and repair rate), availability variations of the systems have been predicted through the utilisation of the Markov birth-death approach. To overcome the drawbacks associated with the existing optimal PM plan, a new approach is proposed in this study to develop an optimal preventive maintenance plan for electronic actuating switch manufacturers through the digital ecosystem. This proposed method integrates manufacturing subsystem failure into smart digital ecosystems and also to estimate the actual remaining useful life of the machines.
引用
收藏
页码:12 / 33
页数:23
相关论文
共 50 条
  • [1] AN INTEGRATED OPTIMIZATION OF PRODUCTION AND PREVENTIVE MAINTENANCE SCHEDULING IN INDUSTRY 4.0
    Babaeimorad, Samane
    Fattahi, Parviz
    Fazlollahtabar, Hamed
    Shafiee, Mahmood
    FACTA UNIVERSITATIS-SERIES MECHANICAL ENGINEERING, 2024, 22 (04) : 711 - 720
  • [2] Industry 4.0: Smart Scheduling
    Alejandro Rossit, Daniel
    Tohme, Fernando
    Frutos, Mariano
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2019, 57 (12) : 3802 - 3813
  • [3] OPTIMAL PREVENTIVE MAINTENANCE SCHEDULING
    MALIK, MAK
    MECHANICAL ENGINEERING, 1972, 94 (02) : 44 - &
  • [4] SMEs on the Way to the Smart World of Industry 4.0
    Adamik, Anna
    EURASIAN BUSINESS PERSPECTIVES, 2020, 12 (02): : 139 - 156
  • [5] An Optimal Preventive Maintenance Scheduling Model
    Zou, XiaoLi
    PROCEEDINGS OF THE 2015 5TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCES AND AUTOMATION ENGINEERING, 2016, 42 : 50 - 53
  • [6] Smart Anomaly Detection and Prediction for Assembly Process Maintenance in Compliance with Industry 4.0
    Tanuska, Pavol
    Spendla, Lukas
    Kebisek, Michal
    Duris, Rastislav
    Stremy, Maximilian
    SENSORS, 2021, 21 (07)
  • [7] A mathematical model for optimal turnaround maintenance planning and scheduling for a network of plants in process industry supply chain
    Duffuaa, Salih
    Idris, Mohamed
    Kolus, Ahmet
    Al-Turki, Umar
    COMPUTERS & CHEMICAL ENGINEERING, 2024, 180
  • [8] Optimal planning of unpunctual preventive maintenance
    He, Kai
    Maillart, Lisa M.
    Prokopyev, Oleg A.
    IISE TRANSACTIONS, 2017, 49 (02) : 127 - 143
  • [9] SMEs can touch Industry 4.0 in the Smart Learning Factory
    Grube, David
    Malik, Ali A.
    Bilberg, Arne
    RESEARCH. EXPERIENCE. EDUCATION., 2019, 31 : 219 - 224
  • [10] Optimal preventive maintenance scheduling in semiconductor manufacturing
    Yao, XD
    Fernández-Gaucherand, E
    Fu, MC
    Marcus, SI
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2004, 17 (03) : 345 - 356