Fuzzy synthetic evaluation of moral hazard and adverse selection of public private partnership projects

被引:19
|
作者
Owusu-Manu, De-Graft [1 ]
Kukah, Augustine Senanu Komla [2 ]
Edwards, David John [3 ,4 ]
Ameyaw, Ernest Effah [5 ]
机构
[1] Kwame Nkrumah Univ Sci & Technol, Dept Construct Technol & Management, Kumasi, Ghana
[2] Kwame Nkrumah Univ Sci & Technol, Inst Distance Learning, Kumasi, Ghana
[3] Fac Comp Engn & Built Environm, Birmingham, W Midlands, England
[4] Univ Johannesburg, Johannesburg, South Africa
[5] Northumbria Univ, Dept Architecture & Built Environm, Newcastle Upon Tyne, Tyne & Wear, England
关键词
Moral hazard; adverse selection; public-private-partnership; construction projects; fuzzy synthetic evaluation model; CRITICAL SUCCESS FACTORS; ASYMMETRIC INFORMATION; PPP PROJECTS; WATER; MODEL; REPUTATION;
D O I
10.1080/15623599.2021.2010356
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Moral hazards and adverse selection (MHAS) lead to failure in public-private partnership (PPP) projects and delay in delivery outputs' requirements. This research developed a fuzzy synthetic evaluation model (FSEM) to measure cause and effect level of MHAS of PPP construction projects. Mean score ranking and principal component factor analysis (PCFA) evaluated the causal factors. FSEM calculated overall cause and effect (OCE) level. PCFA analysis yielded three components: party and risk factors, incentives and contractual obligations and contract and project conditions while FSEM determined the OCE level to be 3.92. Party and risk factors; incentives and contractual obligations; contract and project conditions had cause and effect levels of 3.99, 3.99 and 3.79. Findings will enhance knowledge on MHAS risk levels of PPP construction projects thereby prompting project stakeholders to reduce the risks. Further research recommends using computer-based systems to minimize complexities and human errors during manual computation of fuzzy analysis.
引用
收藏
页码:1805 / 1814
页数:10
相关论文
共 50 条
  • [1] Causal relationships of moral hazard and adverse selection of Ghanaian Public-Private-Partnership (PPP) construction projects
    Owusu-Manu, De-Graft
    Kukah, A. S.
    Edwards, David John
    Parn, Erika Anneli
    El-Gohary, Hatem
    Aigbavboa, Clinton
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2018, 16 (03) : 439 - 460
  • [2] Exploring strategies to reduce moral hazard and adverse selection of Ghanaian public-private partnership (PPP) construction projects
    Owusu-Manu, De-Graft
    Kukah, Augustine Senanu
    Boateng, Frank
    Asumadu, George
    Edwards, David John
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2021, 19 (02) : 358 - 372
  • [3] Fuzzy Synthetic Evaluation of the Critical Success Factors for the Sustainability of Public Private Partnership Projects in China
    Deng, Binchao
    Zhou, Dongjie
    Zhao, Jiachen
    Yin, Yilin
    Li, Xiaoyu
    SUSTAINABILITY, 2021, 13 (05) : 1 - 21
  • [4] A barrier real option approach to evaluate public–private partnership projects and prevent moral hazard
    Antonio Di Bari
    SN Business & Economics, 1 (3):
  • [5] Evaluation of Public Private Partnership in Infrastructure Projects
    Loganathan, Karthikeyan
    Najafi, Mohammad
    Kaushal, Vinayak
    Agyemang, Pius
    PIPELINES 2021: PLANNING, 2021, : 151 - 159
  • [6] Disentangling moral hazard and adverse selection in private health insurance
    Powell, David
    Goldman, Dana
    JOURNAL OF ECONOMETRICS, 2021, 222 (01) : 141 - 160
  • [7] A public-private-partnership model with moral hazard of SPC and bank
    Shi, Lei
    Onishi, Masamitsu
    Kobayashi, Kiyoshi
    2007 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN AND CYBERNETICS, VOLS 1-8, 2007, : 900 - +
  • [8] Hazard analysis on public-private partnership projects in developing Asia
    Lee, Minsoo
    Han, Xuehui
    Quising, Pilipinas F.
    Villaruel, Mai Lin
    JOURNAL OF INFRASTRUCTURE POLICY AND DEVELOPMENT, 2020, 4 (01) : 50 - 72
  • [9] Epsilon-Efficiency in a Dynamic Partnership with Adverse Selection and Moral Hazard
    Cao, Vi
    B E JOURNAL OF THEORETICAL ECONOMICS, 2023, 23 (01): : 73 - 119
  • [10] Evaluation of risk factors in Ghanaian public-private-partnership (PPP) power projects using fuzzy synthetic evaluation methodology (FSEM)
    Kukah, Augustine Senanu Komla
    Owusu-Manu, De-Graft
    Badu, Edward
    Edwards, David John
    BENCHMARKING-AN INTERNATIONAL JOURNAL, 2023, 30 (08) : 2554 - 2582