Stochastic Flexible Power System Expansion Planning, Based on the Demand Response Considering Consumption and Generation Uncertainties

被引:6
|
作者
Moghadam, Ali Toolabi [1 ]
Bahramian, Bahram [2 ]
Shahbaazy, Farid [3 ]
Paeizi, Ali [4 ]
Senjyu, Tomonobu [5 ]
机构
[1] Polytech Univ Milan, Sch Ind & Informat Engn, I-20133 Milan, Italy
[2] Amirkabir Univ Technol, Dept Elect Engn, Tehran 1591634311, Iran
[3] Islamic Azad Univ, Dept Elect Engn, Borujerd Branch, Borujerd 6915136111, Iran
[4] Shahid Beheshti Univ, Dept Elect Engn, Tehran 1985717443, Iran
[5] Univ Ryukyus, Fac Engn, Nishihara, Okinawa 9030213, Japan
关键词
consumption and generation energy uncertainties; demand response; dynamic planning of the power system; flexibility; hybrid evolutionary algorithm; ADAPTIVE ROBUST OPTIMIZATION; DIFFERENTIAL EVOLUTION; TRANSMISSION; STRATEGY; MICROGRIDS; COVERAGE;
D O I
10.3390/su15021099
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper presents the generation and transmission expansion planning (GTEP) considering the switched capacitive banks (SCBs) allocation in the power system, including the demand response program (DRP). This scheme is based on the system flexibility. The objective function of the scheme minimizes the expected planning cost that is equaled to the summation of the total construction costs of the SCBs, the generation units (GUs) and the transmission lines (TLs), and the operating cost of the GUs. It is concerned with the AC power flow constraints, the planning-operation model of the mentioned elements, the DRP operation formulation, and the operating and flexibility limits of the network. In the following, the scenario-based stochastic programming is used to model the uncertainty parameters, such as the load and renewable power of wind farms. Then, the hybrid evolutionary algorithm, based on the combination of the crow search algorithm and the grey wolf optimizer, is used to determine the optimal point with the approximate unique solution. Finally, the scheme is applied on the transmission networks, the numerical results confirm the capabilities of the proposed scheme in simultaneously improving the flexibility, operation, and economic situation of the transmission network, so that the hybrid algorithm achieves the optimal solution in a shorter computation time, compared with the non-hybrid algorithms. This algorithm has a low standard deviation of about 92% in the final response. The proposed scheme with the optimal planning of the lines, sources, and capacitor banks, together with the optimal operation of the DRP succeeded in improving the energy loss and the voltage deviation by about 30-36% and 25-30%, compared with those of the power flow studies.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Modeling the effects of demand response on generation expansion planning in restructured power systems
    Samadi, Mahdi
    Javidi, Mohammad Hossein
    Ghazizadeh, Mohammad Sadegh
    Journal of Zhejiang University: Science C, 2013, 14 (12): : 966 - 976
  • [22] Modeling the effects of demand response on generation expansion planning in restructured power systems
    Mahdi Samadi
    Mohammad Hossein Javidi
    Mohammad Sadegh Ghazizadeh
    Journal of Zhejiang University SCIENCE C, 2013, 14 : 966 - 976
  • [24] Modeling the effects of demand response on generation expansion planning in restructured power systems
    Samadi, Mahdi
    Javidi, Mohammad Hossein
    Ghazizadeh, Mohammad Sadegh
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE C-COMPUTERS & ELECTRONICS, 2013, 14 (12): : 966 - 976
  • [25] Modeling the effects of demand response on generation expansion planning in restructured power systems
    Mahdi SAMADI
    Mohammad Hossein JAVIDI
    Mohammad Sadegh GHAZIZADEH
    Frontiers of Information Technology & Electronic Engineering, 2013, (12) : 966 - 976
  • [26] Transmission Network Expansion Planning Based on Chronological Evaluation Considering Wind Power Uncertainties
    Wu, Weiping
    Hu, Zechun
    Song, Yonghua
    Sansavini, Giovanni
    Chen, Huimiao
    Chen, Xiaoshuang
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2018, 33 (05) : 4787 - 4796
  • [27] Transmission Network Expansion Planning Considering Uncertainty in Generation and Demand
    Escobar, A. H.
    Romero, R. A.
    Gallego, R. A.
    2008 IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXPOSITION: LATIN AMERICA, VOLS 1 AND 2, 2008, : 705 - 710
  • [28] Reliable generation expansion planning in pool market considering power system security
    Tafreshi, S. M. Moghaddas
    Lahiji, A. Saliminia
    Aghaei, J.
    Rabiee, A.
    ENERGY CONVERSION AND MANAGEMENT, 2012, 54 (01) : 162 - 168
  • [29] Multiobjective Robust Power System Expansion Planning Considering Generation Units Retirement
    Mavalizadeh, Hani
    Ahmadi, Abdollah
    Gandoman, Foad Haidari
    Siano, Pierluigi
    Shayanfar, Heidar Ali
    IEEE SYSTEMS JOURNAL, 2018, 12 (03): : 2664 - 2675
  • [30] Flexibility resource planning of a power system considering a flexible supply-demand ratio
    Zhang, Xiaotian
    Lu, Mingxuan
    Li, Hua
    Gao, Fengxi
    Zhong, Chongfei
    Qian, Xiaoyi
    FRONTIERS IN ENERGY RESEARCH, 2023, 11