A stochastic bi-objective project scheduling model under failure of activities

被引:2
|
作者
Rezaei, Fatemeh [1 ,2 ]
Najafi, Amir Abbas [2 ]
Demeulemeester, Erik [1 ]
Ramezanian, Reza [2 ]
机构
[1] Katholieke Univ Leuven, Fac Econ & Business, Res Ctr Operat Management, Dept Decis Sci & Informat Management, B-3000 Leuven, Belgium
[2] KN Toosi Univ Technol, Fac Ind Engn, Tehran, Iran
关键词
R&D project scheduling; Activity failure; Conditional value-at-risk; NET PRESENT VALUE; VALUE-AT-RISK; ACTIVITY DURATION; ALGORITHM; MAXIMIZE;
D O I
10.1007/s10479-023-05600-2
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper, the research and development project scheduling problem (RDPSP) under uncertain failure of activities is formulated where an activity's failure results in the project's overall failure. A scenario-based bi-objective model to maximize the expected net present value (eNPV) and to minimize the NPV's risk by conditional value-at-risk (CVaR) measurement is presented. For this purpose, different modes of failure or success of activities have been considered as a stochastic parameter by a set of scenarios. To formulate the problem, a nonlinear model is first presented, then a mixed-integer programming (MIP) model of the problem is developed by piecewise approximation. Some valid inequalities are presented to improve the performance of the MIP model. A sequential sampling procedure is also used to approximate the solution of the MIP model with a large number of scenarios. The experimental results have shown that the sequential sampling procedure attains high-quality solutions in a reasonable CPU time.
引用
收藏
页码:453 / 476
页数:24
相关论文
共 50 条
  • [21] The integration of resource allocation and time buffering for bi-objective robust project scheduling
    Liang, Yangyang
    Cui, Nanfang
    Hu, Xuejun
    Demeulemeester, Erik
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (13) : 3839 - 3854
  • [22] A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    KSCE JOURNAL OF CIVIL ENGINEERING, 2022, 26 (06) : 2539 - 2554
  • [23] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Liu, Wanlin
    Ge, Li
    Qu, Chunli
    Yang, Shun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (01) : 15 - 28
  • [24] Bi-objective resource-constrained project scheduling with robustness and makespan criteria
    Abbasi, Babak
    Shadrokh, Shahram
    Arkat, Jamal
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 180 (01) : 146 - 152
  • [25] A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows
    Sayyid Ali Banihashemi
    Mohammad Khalilzadeh
    KSCE Journal of Civil Engineering, 2022, 26 : 2539 - 2554
  • [26] A bi-objective Model for Robust Resource-constrained Project Scheduling Problem with Random Activity Durations
    Zhang, Jingwen
    Qiao, Chuanzhuo
    2015 IEEE 12th International Conference on Networking, Sensing and Control (ICNSC), 2015, : 28 - 32
  • [27] Bi-objective dynamic tugboat scheduling with speed optimization under stochastic and time-varying service demands
    Wei, Xiaoyang
    Lau, Hoong Chuin
    Xiao, Zhe
    Fu, Xiuju
    Zhang, Xiaocai
    Qin, Zheng
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2025, 193
  • [28] A bi-objective hierarchical hub location model with facility failure
    Babashahi, M.
    Shahanaghi, K.
    Gholamian, M. R.
    Yavari, A.
    SCIENTIA IRANICA, 2020, 27 (04) : 2009 - 2020
  • [29] Bi-objective project portfolio selection and staff assignment under uncertainty
    Gutjahr, Walter J.
    Reiter, Peter
    OPTIMIZATION, 2010, 59 (03) : 417 - 445
  • [30] Bi-objective optimisation model for installation scheduling in offshore wind farms
    Irawan, Chandra Ade
    Jones, Dylan
    Ouelhadj, Djamila
    COMPUTERS & OPERATIONS RESEARCH, 2017, 78 : 393 - 407