Patterns, drivers, and a predictive model of dam removal cost in the United States

被引:8
|
作者
Duda, Jeffrey J. [1 ]
Jumani, Suman [2 ,3 ]
Wieferich, Daniel J. [4 ]
Tullos, Desiree [5 ]
McKay, S. Kyle [2 ]
Randle, Timothy J. [6 ]
Jansen, Alvin [6 ]
Bailey, Susan [2 ]
Jensen, Benjamin L. [1 ]
Johnson, Rachelle C. [1 ]
Wagner, Ella [1 ]
Richards, Kyla [4 ]
Wenger, Seth J. [3 ]
Walther, Eric J. [3 ]
Bountry, Jennifer A. [6 ]
机构
[1] US Geol Survey, Western Fisheries Res Ctr, Seattle, WA 98104 USA
[2] US Army Corps Engn, Environm Lab, Engineer Res & Dev Ctr, Vicksburg, MS USA
[3] Univ Georgia, River Basin Ctr, Athens, GA USA
[4] US Geol Survey, Sci Analyt & Synth, Denver, CO USA
[5] Oregon State Univ, Biol & Ecol Engn Dept, Corvallis, OR USA
[6] Tech Serv Ctr, Bur Reclamat, Denver, CO USA
来源
FRONTIERS IN ECOLOGY AND EVOLUTION | 2023年 / 11卷
关键词
dam removal; cost drivers; economics; river restoration; cost engineering; ALTERED FLOW REGIMES; ECOLOGICAL RESPONSES; SCIENCE; RIVER; CONNECTIVITY; RESTORATION; MANAGEMENT; DECISIONS; POLITICS; TRENDS;
D O I
10.3389/fevo.2023.1215471
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
Given the burgeoning dam removal movement and the large number of dams approaching obsolescence in the United States, cost estimating data and tools are needed for dam removal prioritization, planning, and execution. We used the list of removed dams compiled by American Rivers to search for publicly available reported costs for dam removal projects. Total cost information could include component costs related to project planning, dam deconstruction, monitoring, and several categories of mitigation activities. We compiled reported costs from 455 unique sources for 668 dams removed in the United States from 1965 to 2020. The dam removals occurred within 571 unique projects involving 1-18 dams. When adjusted for inflation into 2020 USD, cost of these projects totaled $1.522 billion, with per-dam costs ranging from $1 thousand (k) to $268.8 million (M). The median cost for dam removals was $157k, $823k, and $6.2M for dams that were< 5 m, between 5-10 m, and > 10 m in height, respectively. Geographic differences in total costs showed that northern states in general, and the Pacific Northwest in particular, spent the most on dam removal. The Midwest and the Northeast spent proportionally more on removal of dams less than 5 m in height, whereas the Northwest and Southwest spent the most on larger dam removals > 10 m tall. We used stochastic gradient boosting with quantile regression to model dam removal cost against potential predictor variables including dam characteristics (dam height and material), hydrography (average annual discharge and drainage area), project complexity (inferred from construction and sediment management, mitigation, and post-removal cost drivers), and geographic region. Dam height, annual average discharge at the dam site, and project complexity were the predominant drivers of removal cost. The final model had an R-2 of 57% and when applied to a test dataset model predictions had a root mean squared error of $5.09M and a mean absolute error of $1.45M, indicating its potential utility to predict estimated costs of dam removal. We developed a R shiny application for estimating dam removal costs using customized model inputs for exploratory analyses and potential dam removal planning.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] The construction of the Ross dam in the united states of America
    Beinlich, H
    ZEITSCHRIFT DES VEREINES DEUTSCHER INGENIEURE, 1940, 84 : 1003 - 1004
  • [32] INTERNET SEARCH PATTERNS FOR IVF SERVICES IN THE UNITED STATES-THE COST FACTOR
    Smith, K. A.
    Trolice, M. P.
    FERTILITY AND STERILITY, 2017, 108 (03) : E108 - E108
  • [33] Use and Cost Patterns of Antihypertensive Medications in the United States From 1996 to 2021
    Jacobs, Joshua A.
    Rodgers, Anthony
    Bellows, Brandon K.
    Hernandez, Inmaculada
    Wang, Nelson
    Derington, Catherine G.
    King, Jordan B.
    Zheutlin, Alexander R.
    Whelton, Paul K.
    Egan, Brent M.
    Cushman, William C.
    Bress, Adam P.
    HYPERTENSION, 2024, 81 (11) : 2307 - 2317
  • [34] LONG-TERM IMPLICATIONS OF DAM REMOVAL FOR MACROINVERTEBRATE COMMUNITIES IN MICHIGAN AND WISCONSIN RIVERS, UNITED STATES
    Hansen, Jonathan F.
    Hayes, Daniel B.
    RIVER RESEARCH AND APPLICATIONS, 2012, 28 (09) : 1540 - 1550
  • [35] Cost of Predictive Testing in HD Varies Greatly Across Centers of Excellence in the United States
    Orem, Tyler
    Sung, Victor
    NEUROTHERAPEUTICS, 2019, 16 (04) : 1373 - 1373
  • [36] A predictive model of mercury fish tissue concentrations for the southeastern United States
    Qian, SS
    Warren-Hicks, W
    Keating, J
    Moore, DRJ
    Teed, RS
    ENVIRONMENTAL SCIENCE & TECHNOLOGY, 2001, 35 (05) : 941 - 947
  • [37] Predictive patterns of suicidal behavior: The United States armed services versus the civilian population
    Sentell, JW
    Lacroix, M
    Sentell, JV
    Finstuen, K
    MILITARY MEDICINE, 1997, 162 (03) : 168 - 171
  • [38] The Cost of Hyperkalemia in the United States
    Betts, Keith A.
    Woolley, J. Michael
    Mu, Fan
    Xiang, Cheryl
    Tang, Wenxi
    Wu, Eric Q.
    KIDNEY INTERNATIONAL REPORTS, 2018, 3 (02): : 385 - 393
  • [39] Cost of Living in the United States
    不详
    MONTHLY LABOR REVIEW, 1919, 9 (02) : 117 - 119
  • [40] The Cost of Contraception in the United States
    Salcedo, Jennifer
    Kaneshiro, Bliss
    CURRENT WOMENS HEALTH REVIEWS, 2014, 10 (02) : 66 - 71