A Two-Layer Approach for the Decentralized Multi-Project Scheduling Problem Sharing Multi-Skilled Staff

被引:2
|
作者
You, Weibao [1 ]
Xu, Zhe [1 ]
Zhao, Song [1 ]
机构
[1] Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Resource management; Decision making; Uncertainty; Optimization methods; Decentralized applications; Complex systems; Project management; Globalization; Enterprise resource planning; Market research; Market opportunities; Personnel; Decentralized multi-project scheduling; multi-skilled staff; two-layer approach; tabu search; bat algorithm; GENETIC ALGORITHM; TABU SEARCH; OPTIMIZATION; SYSTEM; CHAINS;
D O I
10.1109/ACCESS.2024.3369177
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the rapid development of economic globalization and information technology, the projects undertaken by enterprises are gradually becoming larger and more complex. The multi-project management model has become the norm in enterprise management, and it shows a trend of decentralization in terms of geographical distribution and management environment. This decentralization mainly manifests in the fact that each project has its own private information and benefit objectives and shares limited global resources with other projects during the execution process, forming a decentralized decision-making environment. As an extension of the resource-constrained project scheduling problem, the decentralized resource-constrained multi-project scheduling problem integrates single-project scheduling and global resource coordination allocation in a decentralized decision-making environment with multiple independent decision-makers. Furthermore, when considering global resources as multi-skilled staff, the decentralized multi-project scheduling problem sharing multi-skilled staff studied in this paper is proposed. A two-layer model containing local scheduling and global coordination decision-making is established to describe this problem. A two-layer approach (TLA) is proposed to solve this problem. In the local scheduling layer, a bat algorithm based on forward-backward scheduling (BAFBS) is developed to generate local baseline schedules to minimize the single-project completion time. In the global coordination decision-making layer, a variable neighborhood tabu search algorithm with greedy assignment strategy is designed to resolve global resource conflicts to minimize the multi-project total tardiness cost. Computational experiments are conducted based on the Multi-Project Scheduling Problem LIBrary dataset. The results show that the BAFBS can obtain high-quality local baseline schedules. Compared to the existing decentralized and centralized methods, our proposed TLA can get better solutions on most problem subsets, which proves that our approach can effectively coordinate the allocation of multi-skilled staff among multiple projects.
引用
收藏
页码:29204 / 29221
页数:18
相关论文
共 50 条
  • [21] Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer
    Chen, James C.
    Chen, Yin-Yann
    Chen, Tzu-Li
    Lin, Yi-Hsuan
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 169
  • [22] A priority rule heuristic for the multi-skilled resource-constrained project scheduling problem
    Vermeire, Guillaume
    Vanhoucke, Mario
    APPLIED SOFT COMPUTING, 2025, 171
  • [23] A DECOMPOSITION APPROACH TO MULTI-PROJECT SCHEDULING
    DECKRO, RF
    WINKOFSKY, EP
    HEBERT, JE
    GAGNON, R
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) : 110 - 118
  • [24] On a multi-project staffing problem with heterogeneously skilled workers
    Walter, Matthias
    Zimmermann, Juergen
    OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 489 - 494
  • [25] A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation
    Li, Feifei
    Xu, Zhe
    Li, Haitao
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 151
  • [26] A two-stage algorithm for project scheduling problems with multi-skilled workforce constraints
    Wang, Yi-Fan
    Liu, Shi-Xin
    Chen, Di
    Dongbei Daxue Xuebao/Journal of Northeastern University, 2014, 35 (02): : 184 - 189
  • [27] A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
    Snauwaert, Jakob
    Vanhoucke, Mario
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2023, 307 (01) : 1 - 19
  • [28] Preemptive multi-skilled resource investment project scheduling problem: Mathematical modelling and solution approaches
    Javanmard, Shima
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 96 : 55 - 68
  • [29] A framework for preemptive multi-skilled project scheduling problem with time-of-use energy tariffs
    Maghsoudlou, Hamidreza
    Afshar-Nadjafi, Behrouz
    Niaki, Seyed Taghi Akhavan
    ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2021, 12 (02): : 431 - 458
  • [30] Meta-heuristic Solution with Considering Setup Time for Multi-Skilled Project Scheduling Problem
    Barghi B.
    Sikari S.S.
    Operations Research Forum, 3 (1)