A Two-Layer Approach for the Decentralized Multi-Project Scheduling Problem Sharing Multi-Skilled Staff

被引:2
|
作者
You, Weibao [1 ]
Xu, Zhe [1 ]
Zhao, Song [1 ]
机构
[1] Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China
基金
中国国家自然科学基金;
关键词
Scheduling; Resource management; Decision making; Uncertainty; Optimization methods; Decentralized applications; Complex systems; Project management; Globalization; Enterprise resource planning; Market research; Market opportunities; Personnel; Decentralized multi-project scheduling; multi-skilled staff; two-layer approach; tabu search; bat algorithm; GENETIC ALGORITHM; TABU SEARCH; OPTIMIZATION; SYSTEM; CHAINS;
D O I
10.1109/ACCESS.2024.3369177
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the rapid development of economic globalization and information technology, the projects undertaken by enterprises are gradually becoming larger and more complex. The multi-project management model has become the norm in enterprise management, and it shows a trend of decentralization in terms of geographical distribution and management environment. This decentralization mainly manifests in the fact that each project has its own private information and benefit objectives and shares limited global resources with other projects during the execution process, forming a decentralized decision-making environment. As an extension of the resource-constrained project scheduling problem, the decentralized resource-constrained multi-project scheduling problem integrates single-project scheduling and global resource coordination allocation in a decentralized decision-making environment with multiple independent decision-makers. Furthermore, when considering global resources as multi-skilled staff, the decentralized multi-project scheduling problem sharing multi-skilled staff studied in this paper is proposed. A two-layer model containing local scheduling and global coordination decision-making is established to describe this problem. A two-layer approach (TLA) is proposed to solve this problem. In the local scheduling layer, a bat algorithm based on forward-backward scheduling (BAFBS) is developed to generate local baseline schedules to minimize the single-project completion time. In the global coordination decision-making layer, a variable neighborhood tabu search algorithm with greedy assignment strategy is designed to resolve global resource conflicts to minimize the multi-project total tardiness cost. Computational experiments are conducted based on the Multi-Project Scheduling Problem LIBrary dataset. The results show that the BAFBS can obtain high-quality local baseline schedules. Compared to the existing decentralized and centralized methods, our proposed TLA can get better solutions on most problem subsets, which proves that our approach can effectively coordinate the allocation of multi-skilled staff among multiple projects.
引用
收藏
页码:29204 / 29221
页数:18
相关论文
共 50 条
  • [1] A two-layer approach for solving robust decentralized multiproject scheduling problem with multi-skilled staff
    You, Weibao
    Xu, Zhe
    Yu, Yining
    Zhao, Song
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2024, 31 (03) : 1631 - 1670
  • [2] Multi-skilled resource-constrained multi-project scheduling problem with dexterity improvement of workforce
    Mozhdehi, Saleh
    Baradaran, Vahid
    Hosseinian, Amir Hossein
    AUTOMATION IN CONSTRUCTION, 2024, 162
  • [3] A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution
    Chen, Rong
    Liang, Changyong
    Gu, Dongxiao
    Leung, Joseph Y-T.
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (21) : 6207 - 6234
  • [4] A Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff
    Yu, Yining
    Xu, Zhe
    Zhao, Song
    IEEE ACCESS, 2023, 11 : 29554 - 29565
  • [5] A two-stage approach with softmax scoring mechanism for a multi-projectscheduling problem sharing multi-skilled staff
    Yu, Yining
    Xu, Zhe
    Liu, Dongning
    Zhao, Song
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 203
  • [6] Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
    Han, Jinchi
    Chen, Chen
    Tiong, Robert Lee Kong
    Wu, Kan
    AUTOMATION IN CONSTRUCTION, 2024, 166
  • [7] Energy-efficient resource-constrained multi-project scheduling problem with generalized precedence relations and multi-skilled resources
    Goudarzi, Ehsan
    Esmaeeli, Hamid
    Parsa, Kia
    Asadzadeh, Shervin
    JOURNAL OF SUPERCOMPUTING, 2024, 80 (10): : 13837 - 13872
  • [8] Multi-project decentralized scheduling problem solving by market mechanism
    Wang, Lei
    Zhan, De-Chen
    Nie, Lan-Shun
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2014, 20 (08): : 1969 - 1979
  • [9] Scheduling of Multi-skilled Staff Across Multiple Locations
    Kuo, Yong-Hong
    Leung, Janny M. Y.
    Yano, Candace A.
    PRODUCTION AND OPERATIONS MANAGEMENT, 2014, 23 (04) : 626 - 644
  • [10] A two-phase method for a multi-skilled project scheduling problem with discounted cash flows
    Tabrizi, B. H.
    Tavakkoli-Moghaddam, R.
    Ghaderi, S. F.
    SCIENTIA IRANICA, 2014, 21 (03) : 1083 - 1095