Power generation expansion planning considering natural disaster scenarios under carbon emission trajectory constraints

被引:0
|
作者
Liao, Wang [1 ]
Liu, Dong [1 ]
Xue, Yusheng [2 ]
Wu, Yufeng [1 ]
Xue, Feng [2 ]
Chang, Kang [2 ]
机构
[1] Shanghai Jiao Tong Univ, Key Lab Control Power Transmiss & Convers, Minist Educ, Shanghai 200240, Peoples R China
[2] NARI Grp Corp, State Grid Elect Power Res Inst, Nanjing 211106, Jiangsu, Peoples R China
关键词
Generation expansion planning (GEP); Carbon emission trajectory; Natural disaster; Renewable energy; Carbon neutrality; ENERGY-STORAGE; SYSTEM; PENETRATION; MODEL; OPTIMIZATION; FLEXIBILITY; ELECTRICITY; ALGORITHM; IMPACT;
D O I
10.1016/j.apenergy.2024.122832
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The intensification of global climate change has led to a widespread consensus on carbon reduction, with the power industry being the principal contributor to carbon emissions necessitating an inevitable transition of its energy structure. Concomitantly, the escalating frequency of natural disasters caused by extreme weather presents formidable challenges to both secure power supply and the low-carbon transition of the power system. To fulfill the developmental requirements of a low-carbon power system and address the carbon emission risks imposed by natural disasters, this paper proposes a bi-level model for generation expansion planning (GEP) that incorporates constraints on the carbon emission trajectory and the influence of natural disasters. The planninglevel model optimizes investment costs of various generation technologies and energy storage (ES), as well as the overall operational expenses over the planning period, with an objective to minimize them. It incorporates carbon emission trajectory constraints and policy constraints, such as carbon peaking, carbon neutrality and renewable energy (RE) penetration rates, in order to optimize the planning installed capacity of power sources. The operational-level model aims to minimize typical daily operating costs while also simulating power unit outputs in routine and disaster scenarios. A case study is conducted in a disaster-prone province in southern China to analyze the power generation expansion planning and the trajectory of carbon emissions from 2020 to 2060 under different scenarios. The simulation results show that compared to thermal power, the planning scheme mainly focused on RE with ES is better suited to achieve the goal of a low-carbon transition of the power grid. Moreover, after considering natural disasters, the cost and carbon emissions of power system planning are higher, and the risk of carbon emissions increases with the severity of disasters.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Generation expansion planning considering unit commitment constraints and data-driven robust optimization under uncertainties
    Abdalla, Omar H.
    Abu Adma, Maged A.
    Ahmed, Abdelmonem S.
    INTERNATIONAL TRANSACTIONS ON ELECTRICAL ENERGY SYSTEMS, 2021, 31 (06):
  • [32] Coordination of Generation and Reactive Power Expansion Planning Considering APFC Units
    Hashemi, Y.
    Abdolrezaei, H.
    Hashemi, B.
    34TH INTERNATIONAL POWER SYSTEM CONFERENCE (PSC2019), 2019, : 490 - 496
  • [33] Microgrid's Generation Expansion Planning Considering Lower Carbon Economy
    Yang, Xuewei
    Tian, Wei
    2012 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2012,
  • [34] Assessing the impact of inertia and reactive power constraints in generation expansion planning
    Wogrin, S.
    Tejada-Arango, D.
    Delikaraoglou, S.
    Botterud, A.
    APPLIED ENERGY, 2020, 280
  • [35] Integrated Generation and Transmission Expansion Planning with Carbon Capture Operating Constraints
    Hu, Yuan
    Ding, Tao
    Bie, Zhaohong
    Lian, Haoran
    2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
  • [36] Rolling Decision Model of Thermal Power Retrofit and Generation Expansion Planning Considering Carbon Emissions and Power Balance Risk
    Pan D.
    Gui X.
    Xu J.
    Shen Y.
    Xu H.
    Ma Y.
    Energy Engineering: Journal of the Association of Energy Engineering, 2024, 121 (05): : 1309 - 1328
  • [37] Low carbon generation expansion planning based on carbon emission right allocation
    Song, Xudong
    Xiang, Tieyuan
    Xiong, Hu
    Xu, Zhi
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2012, 36 (19): : 47 - 52
  • [38] Low-carbon Planning of Power System Considering Carbon Emission Flow
    Zhao W.
    Xiong Z.
    Pan Y.
    Li F.
    Xu P.
    Lai X.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (09): : 23 - 33
  • [39] A Novel Generation Expansion Planning Model Considering Constraints on Regulation Capacity and Regulation Speed
    Zhang, Ning
    2ND INTERNATIONAL CONFERENCE ON ENERGY AND POWER ENGINEERING (EPE 2018), 2018, : 30 - 34
  • [40] Distribution network expansion planning considering distributed generation using probabilistic voltage constraints
    Huang, Yalin
    Alvehag, Karin
    Soder, Lennart
    2014 INTERNATIONAL CONFERENCE ON PROBABILISTIC METHODS APPLIED TO POWER SYSTEMS (PMAPS), 2014,