共 50 条
- [41] Long-term monitoring of Sesia high speed railway bridge BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2077 - 2083
- [43] Influence of friction effect of sliding bearing on track-bridge interaction between continuous welded rail and long-span bridge in high-speed railway Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2019, 50 (03): : 627 - 633
- [46] Performance Evaluation of a Combined Transition System in Slab-Ballasted Railway Track Using a Vehicle-Track-Substructure Interaction Model KSCE Journal of Civil Engineering, 2023, 27 : 3848 - 3860
- [47] Influence of Bearing Friction on Track-Bridge Interaction of Long-Span Suspension Bridge of High-Speed Railway Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (01): : 114 - 124
- [48] Effects of CRTS II Slab Ballastless Track on the Seismic Responses of a High-Speed Railway Continuous Girder Bridge RAILWAY DEVELOPMENT, OPERATIONS, AND MAINTENANCE: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION 2017 (ICRT 2017), 2018, : 848 - 860
- [49] A Concept of Long-Term Monitoring of a Railway Truss Bridge Excited by Trains PROCEEDINGS OF THE FOURTH EUROPEAN WORKSHOP ON STRUCTURAL HEALTH MONITORING 2008, 2008, : 175 - 182