Long-term friction performance monitoring of sliding layer in China railway track system II slab track on bridge superstructure

被引:2
|
作者
Li, Shunlong [1 ]
Wang, Dedao [1 ]
Lin, Chao [2 ]
Wang, Senrong [2 ]
机构
[1] Harbin Inst Technol, Sch Transportat Sci & Engn, 73 Huanghe Rd, Harbin 150001, Heilongjiang, Peoples R China
[2] China Railway Siyuan Survey & Design Grp CO LTD, Wuhan, Peoples R China
关键词
Friction coefficient; sliding layer; china railway track system II slab track; long-term monitoring; track-bridge interaction; BALLASTLESS TRACK; INTERFACE DAMAGE; TEMPERATURE; MORTAR; CONCRETE; STRESS;
D O I
10.1177/14759217221081558
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The sliding layer is an important component of the China Railway Track System (CRTS) II slab track on bridges, and its friction performance has a significant influence on the intensity of track-bridge interaction (TBI). However, the friction performance deterioration of this sliding layer under actual repeated abrasion and harsh environmental conditions is difficult to grasp since structural health monitoring implementation into in-service high-speed railway tracks is extremely hard to be permitted and only limited valuable monitoring datasets are available at present. In this study, the friction performance degradation of the sliding layer was therefore investigated using long-term monitoring data from a multi-span simply supported box girder bridge. First, the friction-induced strain in the base plate was decoupled using the monitored strain at the fixing point and mid-span based on mechanical properties of TBI. Then, structural health monitoring and finite element analysis both indicated an approximately linear relationship between the decoupled friction-induced strain and the temperature of the investigated bridge under certain circumstances. Furthermore, the correspondence between the slope of this linear relationship and the friction coefficient was modelled. Finally, the friction coefficients of the sliding layers on target spans were identified using 4 years of monitoring data and the established correspondence model to analyse the statistical characteristics and degradation performance of the layers. This investigation of the friction performance degradation of the sliding layer in the CRTS II slab track system provides guidance for future maintenance and replacement decision making.
引用
收藏
页码:245 / 256
页数:12
相关论文
共 50 条
  • [41] Long-term monitoring of Sesia high speed railway bridge
    Chellini, G.
    Lippi, F. V.
    Nardini, L.
    Salvatore, W.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 2077 - 2083
  • [42] Long-term prediction for railway track geometry based on an optimised DNN method
    Han, Lei
    Liao, Yingying
    Wang, Haoyu
    Zhang, Hougui
    CONSTRUCTION AND BUILDING MATERIALS, 2023, 401
  • [43] Influence of friction effect of sliding bearing on track-bridge interaction between continuous welded rail and long-span bridge in high-speed railway
    Liu W.
    Dai G.
    Qin H.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2019, 50 (03): : 627 - 633
  • [44] Long-term performance of a fiber-reinforced polymer slab bridge superstructure-field load test and ratings
    Son, Byung-Jik
    Lee, Sang-Youl
    Ji, Hyo-Seon
    COMPOSITES PART B-ENGINEERING, 2013, 45 (01) : 644 - 656
  • [45] Performance Evaluation of a Combined Transition System in Slab-Ballasted Railway Track Using a Vehicle-Track-Substructure Interaction Model
    Heydari-Noghabi, Hamidreza
    Varandas, Jose Nuno
    Zakeri, Jabbar Ali
    Esmaeili, Morteza
    KSCE JOURNAL OF CIVIL ENGINEERING, 2023, 27 (09) : 3848 - 3860
  • [46] Performance Evaluation of a Combined Transition System in Slab-Ballasted Railway Track Using a Vehicle-Track-Substructure Interaction Model
    Hamidreza Heydari-Noghabi
    José Nuno Varandas
    Jabbar Ali Zakeri
    Morteza Esmaeili
    KSCE Journal of Civil Engineering, 2023, 27 : 3848 - 3860
  • [47] Influence of Bearing Friction on Track-Bridge Interaction of Long-Span Suspension Bridge of High-Speed Railway
    Yu X.
    Chen Z.
    Jing H.
    Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (01): : 114 - 124
  • [48] Effects of CRTS II Slab Ballastless Track on the Seismic Responses of a High-Speed Railway Continuous Girder Bridge
    Wei, Biao
    Wang, Peng
    Jiang, Lizhong
    He, Xuhui
    RAILWAY DEVELOPMENT, OPERATIONS, AND MAINTENANCE: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON RAIL TRANSPORTATION 2017 (ICRT 2017), 2018, : 848 - 860
  • [49] A Concept of Long-Term Monitoring of a Railway Truss Bridge Excited by Trains
    Kolakowski, P.
    Sekula, K.
    Swiercz, A.
    PROCEEDINGS OF THE FOURTH EUROPEAN WORKSHOP ON STRUCTURAL HEALTH MONITORING 2008, 2008, : 175 - 182
  • [50] Baseline testing and long-term monitoring of the Lambert Road Bridge for the long-term bridge performance program
    Barr P.J.
    Petroff S.M.
    Hodson D.J.
    Thurgood T.P.
    Halling M.W.
    Journal of Civil Structural Health Monitoring, 2012, 2 (2) : 123 - 135