共 50 条
- [22] An Extended PROMETHEE-II-Based Risk Prioritization Method for Equipment Failures in the Geothermal Power Plant International Journal of Fuzzy Systems, 2019, 21 : 2490 - 2509
- [23] A Multi-agent-based Simulation Method for Health State Assessments of Naval Equipment Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2022, 33 (10): : 1169 - 1177
- [26] A Method based on Maintainability Analysis to Select and Optimize the Orbital Replacement Unit PROCEEDINGS OF THE 2015 FIRST INTERNATIONAL CONFERENCE ON RELIABILITY SYSTEMS ENGINEERING 2015 ICRSE, 2015,
- [27] Research of the equipment selected based on AHP and fuzzy comprehensive evaluation method PROCEEDINGS OF THE FIFTH INTERNATIONAL SYMPOSIUM ON TEST AUTOMATION & INSTRUMENTATION, VOLS 1 AND 2, 2014, : 565 - 569
- [28] Fuzzy Comprehensive Evaluation Method Based on Analytic Hierarchy Process for Falt Risk Analysis of Power Plant Equipment FIFTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 3, PROCEEDINGS, 2008, : 443 - 448
- [29] Substation Automation Equipment State Evaluation Method Based on Comprehensive Analysis of Interval Value Fuzzy Soft Sets 2018 INTERNATIONAL CONFERENCE ON POWER SYSTEM TECHNOLOGY (POWERCON), 2018, : 4015 - 4021
- [30] SHOCK STUDIES OF SHIPBOARD EQUIPMENT AND MACHINERY (VERIFICATION OF DYNAMIC DESIGN ANALYSIS METHOD AS APPLIED TO A SHIPS BOILER) REPORT OF NRL PROGRESS, 1968, (MAR): : 23 - &