Theoretical determination method and field verification of the fracture position of the main roof of the gob-side coal-rock roadway in gently inclined coal seam

被引:5
|
作者
Zhan, Xinyu [1 ]
Gao, Lin [1 ,2 ,3 ,4 ]
Liu, Pengze [1 ]
Zhao, Zhiqiang [5 ]
Zhang, Pandong [1 ]
Liu, Ping [1 ,3 ]
Wang, Yongyin [1 ,3 ]
机构
[1] Guizhou Univ, Coll Min, Guiyang 550025, Peoples R China
[2] Coal Mine Roadway Support & Disaster Prevent Engn, Beijing 100083, Peoples R China
[3] Natl & Local Joint Lab Engn Effect Utilizat Reg Mi, Guiyang 550025, Peoples R China
[4] Key Lab Min Disaster Prevent & Control, Qingdao 266590, Peoples R China
[5] China Univ Min & Technol Beijing, Sch Energy & Min Engn, Beijing 100083, Peoples R China
基金
中国国家自然科学基金;
关键词
Fracture position of the main roof; Gently inclined coal seam; Gob-side coal-rock roadway; Borehole detection;
D O I
10.1007/s10064-023-03249-6
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In order to provide a theoretical determination method for the fracture position of the main roof of the gob-side coal-rock roadway in a gently inclined coal seam (GCRGICS), a mechanical model of the overlying strata structure and a mechanical model of the coal rock body in the limit equilibrium zone were established based on the elastic-plastic limit equilibrium theory. The theoretical calculation formula of the fracture position of the main roof of the GCRGICS was derived. The fracture position of the main roof theory calculation and field test verification were carried out on 1511, 1509, and 151608 return airflow roadways with similar geological conditions in the Panjiang mining area of Guizhou Province. Combined with the similar simulation experimental results of the 1511 return airflow roadway, the differences between the similar simulation, field test and theoretical calculation results were all less than 1, which verified the practicality and reliability of the method. This method can be used to guide the reasonable width of coal pillar retention and the control of the surrounding rock in this type of roadway.
引用
收藏
页数:11
相关论文
共 30 条
  • [21] Research on surrounding rock deformation characteristics of gob-side entry driving in deep inclined coal seam and its control technology
    Chen, Xinzhong
    Wang, Meng
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2015, 32 (03): : 485 - 490
  • [22] Research on Roof Fracture Characteristics of Gob-Side Entry Retaining with Roof Cutting and Non-pillar Mining in Thick Coal Seam, China
    Mengye Zhao
    Lei Zhu
    Qingxiang Huang
    Kai Xu
    Yuyi Wu
    Wenzhe Gu
    Geotechnical and Geological Engineering, 2022, 40 : 1429 - 1448
  • [23] Research on Roof Fracture Characteristics of Gob-Side Entry Retaining with Roof Cutting and Non-pillar Mining in Thick Coal Seam, China
    Zhao, Mengye
    Zhu, Lei
    Huang, Qingxiang
    Xu, Kai
    Wu, Yuyi
    Gu, Wenzhe
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2022, 40 (03) : 1429 - 1448
  • [24] Stability analysis and control countermeasures of surrounding rock of gob-side entry formed by roof-cutting in inclined coal seams
    Zhen, Enze
    Dong, Shizhuo
    Xu, Xiaowei
    Wang, Yajun
    Wang, Mengxiang
    ENERGY EXPLORATION & EXPLOITATION, 2024, 42 (03) : 929 - 958
  • [25] STABILITY ANALYSIS OF SURROUNDING ROCK IN THE OPERATION PROCESS OF GOB-SIDE ENTRY RETAINING IN MAIN ROADWAY UNDER COAL MINING ENVIRONMENT
    Wang, Qi
    Guo, Dongxu
    FRESENIUS ENVIRONMENTAL BULLETIN, 2022, 31 (05): : 4807 - 4815
  • [26] Stability analysis and control technology of gob-side entry retaining with double roadways by filling with high-water material in gently inclined coal seam
    Shengrong Xie
    En Wang
    Dongdong Chen
    Hui Li
    Zaisheng Jiang
    Hongzeng Yang
    International Journal of Coal Science & Technology, 2022, 9
  • [27] Stability analysis and control technology of gob-side entry retaining with double roadways by filling with high-water material in gently inclined coal seam
    Xie, Shengrong
    Wang, En
    Chen, Dongdong
    Li, Hui
    Jiang, Zaisheng
    Yang, Hongzeng
    INTERNATIONAL JOURNAL OF COAL SCIENCE & TECHNOLOGY, 2022, 9 (01)
  • [28] Roof control mechanism and partition compensation support technology of gob-side entry formed by N00 mining method in thin coal seam
    Yang, Jun
    Liu, Ben
    Wang, Ya-jun
    Zhang, Jun
    Hou, Shi-lin
    Wang, Yu-kun
    Wu, Xing
    Li, Hong-cai
    JOURNAL OF CENTRAL SOUTH UNIVERSITY, 2024, 31 (02) : 602 - 620
  • [29] Characteristics of overburden stress distribution and rational pillar width determination of gob-side roadway with thick and hard basic roof in fully mechanized top coal caving workface
    Jiang W.
    Ju W.
    Wang Z.
    Zhang Z.
    Shi M.
    Caikuang yu Anquan Gongcheng Xuebao/Journal of Mining and Safety Engineering, 2020, 37 (06): : 1142 - 1151
  • [30] Study on Three-Dimensional Stress Field of Gob-Side Entry Retaining by Roof Cutting without Pillar under Near-Group Coal Seam Mining
    Sun, Xiaoming
    Liu, Yangyang
    Wang, Junwei
    Li, Jiangbing
    Sun, Shijie
    Cui, Xuebin
    PROCESSES, 2019, 7 (09)