Investigation Study of the Challenges in Green Procurement Implementation in Construction Projects in UAE

被引:6
|
作者
Hazza, Muataz Hazza Al [1 ]
Muqtadar, Maktoom [1 ]
El Salamony, Khaled [1 ]
Bourini, Islam F. [2 ]
Sakhrieh, Ahmad [1 ]
Alnahhal, Mohammed [1 ]
机构
[1] Amer Univ Ras Al Khaimah, Dept Mech & Ind Engn, Ras Al Khaymah, U Arab Emirates
[2] Univ Dubai, Dubai Business Sch, Dubai, U Arab Emirates
来源
CIVIL ENGINEERING JOURNAL-TEHRAN | 2023年 / 9卷 / 04期
关键词
Green Procurement; Construction Project; Challenges; AHP; SUPPLY CHAIN MANAGEMENT; PUBLIC PROCUREMENT; SUSTAINABLE PROCUREMENT; HIERARCHY PROCESS; BARRIERS; SECTOR; AHP;
D O I
10.28991/CEJ-2023-09-04-06
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The global construction industry is responsible for significant environmental , societal effects. Some researchers claim that it accounts for 35% of global gas emissions. One of the solutions is to practice green supply chain management. Part of this is Green Procurement (GP) to conserve energy and money. However, challenges in implementing green procurement in the construction industry are rising. This research aims to identify the most significant challenges when implementing green procurement (GP) in construction projects in the UAE. A comprehensive article review was conducted to determine the critical obstacles highlighted by different researchers. These challenges were prioritized using the analytical hierarchy process (AHP) method , then recommendations on best practices to overcome these challenges were proposed. The results show that the lack of top management commitment is the biggest challenge when implementing green procurement in the construction industry in the UAE, with a priority value of 0.331, followed by a lack of knowledge, with a value of 0.2748. In contrast, lack of awareness is the lowest-ranked factor, with a value of 0.103.
引用
收藏
页码:849 / 859
页数:11
相关论文
共 50 条
  • [21] Green public procurement implementation challenges in Australian public healthcare sector
    Ahsan, Kamrul
    Rahman, Shams
    JOURNAL OF CLEANER PRODUCTION, 2017, 152 : 181 - 197
  • [22] Modeling the Factors Enhancing the Implementation of Green Procurement in the Pakistani Construction Industry
    Khahro, Shabir Hussain
    Memon, Aftab Hameed
    Memon, Nafees Ahmed
    Arsal, Ali
    Ali, Tauha Hussain
    SUSTAINABILITY, 2021, 13 (13)
  • [23] Investigation to Factors Affecting IT Implementation in Chinese Construction Projects
    Wang Guangbin
    Cao Dongping
    Chong Dan
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 3, 2011, : 365 - 373
  • [24] Procurement of construction projects in local government
    Wamuziri, S
    Seywright, A
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MUNICIPAL ENGINEER, 2005, 158 (02) : 145 - 152
  • [25] Causes of claims in road construction projects in the UAE
    Mishmish, Malek
    El-Sayegh, Sameh M.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2018, 18 (01) : 26 - 33
  • [26] Social procurement in UK construction projects
    Loosemore, Martin
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2016, 34 (02) : 133 - 144
  • [27] Effects due to Change in UAE Construction Projects
    AlAmeri, Abdulla
    Nasaruddin, Nur Ain Ngah
    Memon, Aftab Hameed
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2020, 11 (02): : 118 - 125
  • [28] Delay Fees in the Procurement of Construction Projects
    Nystrom, Johan
    Nilsson, Jan-Eric
    Borjesson, Maria
    JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 2019, 53 : 348 - 363
  • [29] Readiness for lean procurement in construction projects
    Suresh, M.
    Arun Ram Nathan, R. B.
    CONSTRUCTION INNOVATION-ENGLAND, 2020, 20 (04): : 587 - 608
  • [30] Government Intervention Through Collaborative Approach in Promoting the Adoption of Green Procurement for Construction Projects
    Bidin, Zafikha Aida
    Bohari, Asmah Alia Mohamad
    Khalil, Natasha
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2022, 13 (02): : 68 - 81