Cumulative Parisian ruin in finite and infinite time horizons for a renewal risk process with exponential claims

被引:0
|
作者
Cheung, Eric C. K. [1 ]
Zhu, Wei [2 ]
机构
[1] Univ New South Wales, UNSW Business Sch, Sch Risk & Actuarial Studies, Sydney, NSW 2052, Australia
[2] Ping An Healthcare & Technol, Shanghai, Peoples R China
来源
基金
澳大利亚研究理事会;
关键词
Cumulative Parisian ruin; Occupation time; Renewal risk model; Finite -time ruin probability; Erlangization; DISCOUNTED PENALTY-FUNCTION; SPARRE-ANDERSEN; MODEL; INSURANCE; PROBABILITY; NUMBER;
D O I
10.1016/j.insmatheco.2023.03.003
中图分类号
F [经济];
学科分类号
02 ;
摘要
The Parisian ruin time, which is the first time the insurer's surplus process has an excursion below level zero that exceeds a prescribed time length, has been extensively analyzed in recent years mainly in the Levy model and its special cases. However, the cumulative Parisian ruin time, which is the first time the total time spent by the surplus process below level zero exceeds a certain time length, has been rarely considered in the literature. In this paper, we study the cumulative Parisian ruin problem in a renewal risk model with general interclaim times and exponential claims. Explicit formulas for the infinite-time cumulative Parisian ruin probability is first derived under a deterministic Parisian clock and then under an Erlang clock, where the latter case can also serve as an approximation of the former. The finite-time cumulative Parisian ruin probability is subsequently analyzed as well when the time horizon is another Erlang random variable. Our formulas are applied in various numerical examples where the interclaim times follow gamma, Weibull, or Pareto distribution. Consequently, we demonstrate that the choice of the interclaim distribution does have a significant impact on the cumulative Parisian ruin probabilities when one deviates from the exponential assumption.
引用
收藏
页码:84 / 101
页数:18
相关论文
共 50 条
  • [1] On the time value of Parisian ruin in (dual) renewal risk processes with exponential jumps
    Wong, Jeff T. Y.
    Cheung, Eric C. K.
    INSURANCE MATHEMATICS & ECONOMICS, 2015, 65 : 280 - 290
  • [2] The joint distribution of the Parisian ruin time and the number of claims until Parisian ruin in the classical risk model
    Czarn, Irmina
    Li, Yanhong
    Palmowski, Zbigniew
    Zhao, Chunming
    JOURNAL OF COMPUTATIONAL AND APPLIED MATHEMATICS, 2017, 313 : 499 - 514
  • [3] Finite-time and infinite-time ruin probabilities in a two-dimensional delayed renewal risk model with Sarmanov dependent claims
    Yang, Yang
    Yuen, Kam C.
    JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 2016, 442 (02) : 600 - 626
  • [4] On asymptotic finite-time ruin probability of a renewal risk model with subexponential main claims and delayed claims
    Yang, Haizhong
    Li, Jinzhu
    STATISTICS & PROBABILITY LETTERS, 2019, 149 : 153 - 159
  • [5] Finite time Parisian ruin of an integrated Gaussian risk model
    Peng, Xiaofan
    Luo, Li
    STATISTICS & PROBABILITY LETTERS, 2017, 124 : 22 - 29
  • [6] The infinite-time ruin probability for a bidimensional renewal risk model with constant force of interest and dependent claims
    Li, Jinzhu
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2017, 46 (04) : 1959 - 1971
  • [7] Parisian ruin for the dual risk process in discrete-time
    Palmowski Z.
    Ramsden L.
    Papaioannou A.D.
    European Actuarial Journal, 2018, 8 (1) : 197 - 214
  • [8] Asymptotic finite-time ruin probabilities in a dependent bidimensional renewal risk model with subexponential claims
    Cheng, Dongya
    Yang, Yang
    Wang, Xinzhi
    JAPAN JOURNAL OF INDUSTRIAL AND APPLIED MATHEMATICS, 2020, 37 (03) : 657 - 675
  • [9] Asymptotic finite-time ruin probabilities in a dependent bidimensional renewal risk model with subexponential claims
    Dongya Cheng
    Yang Yang
    Xinzhi Wang
    Japan Journal of Industrial and Applied Mathematics, 2020, 37 : 657 - 675
  • [10] Lower Asymptotics for the Finite Time Ruin Probability in the Renewal Model with Subexponential Claims
    Jiang, Tao
    Lai, Bin
    Tong, Chongyan
    WORLD CONGRESS ON ENGINEERING, WCE 2010, VOL I, 2010, : 374 - 377