共 50 条
- [44] Risk-based analysis justifies expanding maintenance interval 2000, Gulf Publ Co, Houston, TX, USA (83):
- [46] Risk-based Contingency Analysis for Transmission and Substation Planning T& D ASIA: 2009 TRANSMISSION & DISTRIBUTION CONFERENCE & EXPOSITION: ASIA AND PACIFIC, 2009, : 573 - +
- [48] RHEOLOGICAL DESIGN OF CEMENTING OPERATIONS TRANSACTIONS OF THE SOCIETY OF PETROLEUM ENGINEERS OF AIME, 1962, 225 (03): : 323 - 328
- [50] Using quantitative analysis to make risk-based decisions ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 2003 PROCEEDINGS, 2003, : 170 - 176