Modeling the Optimal Maintenance Strategy for Bridge Elements Based on Agent Sequential Decision Making

被引:1
|
作者
Xin, Gongfeng [1 ]
Liang, Zhiqiang [2 ]
Hu, Yerong [2 ]
Long, Guanxu [1 ]
Zhang, Yang [2 ]
Liang, Peng [2 ]
机构
[1] Shandong High Speed Grp Co, Jinan 250098, Peoples R China
[2] Changan Univ, Sch Highway, Xian 710018, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 01期
关键词
bridge engineering; maintenance decision analysis; sequential decision process; semi-Markov; dynamic programming algorithm; LIFE-CYCLE OPTIMIZATION; HIGHWAY BRIDGES; RISK-ASSESSMENT; RELIABILITY; MANAGEMENT; DESIGN;
D O I
10.3390/app14010014
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In addressing the issues of low efficiency in bridge maintenance decision making, the inaccurate estimation of maintenance costs, and the lack of specificity in decision making regarding maintenance measures for specific defects, this study utilizes data from regular bridge inspections. It employs a two-parameter Weibull distribution to model the duration variables of the states of bridge elements, thereby enabling the prediction of the duration time of bridge elements in various states. Referring to existing bridge maintenance and repair regulations, the estimation process of maintenance costs is streamlined. Taking into account the specific types and development state of bridge defects, as well as considering the adequacy of maintenance and the restorative effects of maintenance measures, an intelligent agent sequential decision-making model for bridge maintenance decisions is established. The model utilizes dynamic programming algorithms to determine the optimal maintenance and repair measures for elements in various states. The decision results are precise, all the way down to the specific bridge elements and maintenance measures for individual defects. In using the case of the regular inspection data of 222 bridges along a highway loop, this study further validates the effectiveness of the proposed research methods. By constructing an intelligent agent sequential decision-making model for bridge element maintenance, the optimal maintenance measures for 21 bridge elements in different states are obtained, thereby significantly enhancing the efficiency of actual bridge maintenance and the practicality of decision results.
引用
收藏
页数:20
相关论文
共 50 条
  • [21] Declarative Logic-Based Pareto-Optimal Agent Decision Making
    Deb, Tonmoay
    Jeong, Mingi
    Molinaro, Cristian
    Pugliese, Andrea
    Li, Alberto Quattrini
    Santos, Eugene, Jr.
    Subrahmanian, V. S.
    Zhang, Youzhi
    IEEE TRANSACTIONS ON CYBERNETICS, 2024, 54 (12) : 7147 - 7162
  • [22] Fairness in Multi-Agent Sequential Decision-Making
    Zhang, Chongjie
    Shah, Julie A.
    ADVANCES IN NEURAL INFORMATION PROCESSING SYSTEMS 27 (NIPS 2014), 2014, 27
  • [23] Decision making with a sequential modeling of pairwise comparison process
    Liu, Fang
    Zhang, Jia-Wei
    Zhang, Wei-Guo
    Pedrycz, Witold
    KNOWLEDGE-BASED SYSTEMS, 2020, 195 (195)
  • [24] Determination of Optimal MR&R Strategy and Inspection Intervals to Support Infrastructure Maintenance Decision Making
    Yang, Yingnan
    Xie, Hongming
    SUSTAINABILITY, 2021, 13 (05) : 1 - 10
  • [25] Mapping the knowledge frontiers and evolution of decision making based on agent-based modeling
    Liang, Xin
    Luo, Lizi
    Hu, Shiying
    Li, Yuke
    KNOWLEDGE-BASED SYSTEMS, 2022, 250
  • [26] LC maintenance strategy development and decision-making model for street maintenance
    Fastrich, A.
    Girmscheid, G.
    CHALLENGES, OPPORTUNITIES AND SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2010, : 907 - 913
  • [27] A Decision-Making Model for Environmental Behavior in Agent-Based Modeling
    Sanchez-Marono, Noelia
    Alonso-Betanzos, Amparo
    Fontenla-Romero, Oscar
    Rodriguez-Garcia, Miguel
    Polhill, Gary
    Craig, Tony
    ADVANCES IN COMPUTATIONAL INTELLIGENCE, PT I, 2013, 7902 : 152 - +
  • [28] STUDY OF STONE ARCH BRIDGE STRENGTHENING AND MAINTENANCE STRATEGY BASED ON FUZZY DECISION AND MARKOV PROCESS
    Guo, Feng-Qi
    Yu, Zhi-Wu
    Shi, Wei-Hua
    4TH INTERNATIONAL SYMPOSIUM ON LIFETIME ENGINEERING OF CIVIL INFRASTRUCTURE, 2009, : 434 - 438
  • [29] Optimal Sequential Investment Decision-Making with Jump Risk
    Jiang, I-Ming
    Liu, Yu-Hong
    Pakavaleetorn, Sutee
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2022, 39 (04)
  • [30] Optimal sequential decision making with probabilistic digital twinsTheoretical foundations
    Christian Agrell
    Kristina Rognlien Dahl
    Andreas Hafver
    SN Applied Sciences, 2023, 5