The multi-manned joint assembly line balancing and feeding problem

被引:7
|
作者
Zangaro, Francesco [1 ,2 ]
Minner, Stefan [1 ,3 ]
Battini, Daria [2 ]
机构
[1] Tech Univ Munich, Logist & Supply Chain Management, Arcisstr 21, D-80333 Munich, Germany
[2] Univ Padua, Dept Management & Engn, Stradella S Nicola 3, I-36100 Vicenza, VI, Italy
[3] Munich Data Sci Inst, Garching, Germany
关键词
Joint assembly line balancing and feeding problem; mixed integer linear programming; adaptive large neighbourhood search; part feeding problem; multi-manned assembly line; DECISION-MODEL; WORKERS; STOCKING; PRODUCT; SYSTEMS; DESIGN; CUTS;
D O I
10.1080/00207543.2022.2103749
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Joint Assembly Line Balancing and Feeding Problem (JALBFP) assigns a line feeding mode to each component (Assembly Line Feeding Problem) and each task to a workplace of a station (Assembly Line Balancing Problem). Current literature offers numerous optimisation models that solve these problems sequentially. However, only few optimisation models, provide a joint solution. To solve the JALBFP for a multi-manned assembly line, we propose a Mixed Integer Linear Programming (MILP) model and a heuristic that relies on the Adaptive Large Neighborhood Search (ALNS) framework by considering multiple workplaces per station and three different feeding policies: line stocking, travelling kitting and sequencing. The objective function minimises the cost of the whole assembly system which considers supermarket, transportation, assembly operations, and investment costs. Although the JALBFP requires higher computation times, it leads to a higher total cost reduction compared to the sequential approach. Through a numerical study, we validate the heuristic approach and find that the average deviation to the MILP model is around 1%. We also compare the solution of the JALBFP with that of the sequential approach and find an average total cost reduction of 10.1% and a maximum total cost reduction of 43.8%.
引用
收藏
页码:5543 / 5565
页数:23
相关论文
共 50 条
  • [31] An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations
    Kellegoz, Talip
    Toklu, Bilal
    COMPUTERS & OPERATIONS RESEARCH, 2012, 39 (12) : 3344 - 3360
  • [32] Solving Stochastic Multi-Manned U-shaped Assembly Line Balancing Problem Using Differential Evolution Algorithm
    Zakaraia, Mohammad
    Zaher, Hegazy
    Ragaa, Naglaa
    INTERNATIONAL JOURNAL OF PRODUCTION MANAGEMENT AND ENGINEERING, 2022, 10 (01) : 13 - 22
  • [33] Balancing two-sided multi-manned assembly line under time and space constraint
    Zamzam, Nessren
    El-Kharbotly, Amin K.
    AIN SHAMS ENGINEERING JOURNAL, 2024, 15 (03)
  • [34] Balancing Lexicographic Multi-Objective Assembly Lines with Multi-Manned Stations
    Kellegoz, Talip
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
  • [35] An exact method with decomposition techniques and combinatorial Benders' cuts for the type-2 multi-manned assembly line balancing problem
    Michels, Adalberto Sato
    Lopes, Thiago Cantos
    Magatao, Leandro
    OPERATIONS RESEARCH PERSPECTIVES, 2020, 7
  • [36] An efficient migrating birds optimization algorithm with idle time reduction for Type-Ⅰ multi-manned assembly line balancing problem
    ZHANG Zikai
    TANG Qiuhua
    LI Zixiang
    HAN Dayong
    JournalofSystemsEngineeringandElectronics, 2021, 32 (02) : 286 - 296
  • [37] A Mathematical Model and a Simulated Annealing Algorithm for Balancing Multi-manned Assembly Line Problem with Sequence-Dependent Setup Time
    Yang, Wucheng
    Cheng, Wenming
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2020, 2020
  • [38] Line balancing problem with multi-manned workstations and resource constraints: The case of electronics waste disassembly
    Chen, Yin-Yann
    Pourhejazy, Pourya
    Liu, Tzu-Ning
    CLEANER LOGISTICS AND SUPPLY CHAIN, 2024, 10
  • [39] A mathematical model and tabu search algorithm for multi-manned assembly line balancing problems with assignment restrictions
    Yilmaz, Hamid
    Yilmaz, Mustafa
    ENGINEERING OPTIMIZATION, 2020, 52 (05) : 856 - 874
  • [40] Multi-Manned Assembly Line Balancing: Workforce Synchronization for Big Data Sets through Simulated Annealing
    Pilati, Francesco
    Ferrari, Emilio
    Gamberi, Mauro
    Margelli, Silvia
    APPLIED SCIENCES-BASEL, 2021, 11 (06):