Bi-objective optimization using an improved NSGA-II for energy-efficient scheduling of a distributed assembly blocking flowshop

被引:10
|
作者
Niu, Wei [1 ]
Li, Jun-qing [1 ,2 ]
Jin, Hui [1 ]
Qi, Rui [1 ]
Sang, Hong-yan [2 ]
机构
[1] Shandong Normal Univ, Sch Informat Sci & Engn, Jinan, Peoples R China
[2] Liaocheng Univ, Sch Comp, Liaocheng, Shandong, Peoples R China
基金
美国国家科学基金会;
关键词
Distributed permutation blocking flowshop; energy-efficient; Non-dominated Sorting Genetic Algorithm-II; multi-objective; ALGORITHM; MAKESPAN; EVOLUTION; MODEL;
D O I
10.1080/0305215X.2022.2032017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, an Energy-Efficient Distributed Assembly Blocking FlowShoP (EEDABFSP) is considered. An improved Non-dominated Sorting Genetic Algorithm-II (NSGA-II) is developed to solve it. Two objectives have been considered, i.e. minimizing the maximum completion time and total energy consumption. To begin, each feasible solution is encoded as a one-dimensional vector with the factory assignment, operation scheduling and speed setting assigned. Next, two initialization schemes are presented to improve both quality and diversity, which are based on distributed assembly attributes and the slowest allowable speed criterion, respectively. Then, to accelerate the convergence process, a novel Pareto-based crossover operator is designed. Because the populations have different initialization strategies, four different mutation operators are designed. In addition, a distributed local search is integrated to improve exploitation abilities. Finally, the experimental results demonstrate that the proposed algorithm is more efficient and effective for solving the EEDABFSP.
引用
收藏
页码:719 / 740
页数:22
相关论文
共 50 条
  • [21] Applying modified NSGA-II for bi-objective supply chain problem
    Susmita Bandyopadhyay
    Ranjan Bhattacharya
    Journal of Intelligent Manufacturing, 2013, 24 : 707 - 716
  • [22] An energy-efficient bi-objective no-wait permutation flowshop scheduling problem to minimize total tardiness and total energy consumption
    Yuksel, Damla
    Tasgetiren, M. Fatih
    Kandiller, Levent
    Gao, Liang
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 145
  • [23] MOAMP-Tabu search and NSGA-II for a real Bi-objective scheduling-routing problem
    Martinez-Puras, Amaya
    Pacheco, Joaquin
    KNOWLEDGE-BASED SYSTEMS, 2016, 112 : 92 - 104
  • [24] A realistic variant of bi-objective unrelated parallel machine scheduling problem: NSGA-II and MOACO approaches
    Afzalirad, Mojtaba
    Rezaeian, Javad
    APPLIED SOFT COMPUTING, 2017, 50 : 109 - 123
  • [25] Multi-objective optimization of a hybrid distributed energy system using NSGA-II algorithm
    Hongbo Ren
    Yinlong Lu
    Qiong Wu
    Xiu Yang
    Aolin Zhou
    Frontiers in Energy, 2018, 12 : 518 - 528
  • [26] Multi-objective optimization of a hybrid distributed energy system using NSGA-II algorithm
    Ren, Hongbo
    Lu, Yinlong
    Wu, Qiong
    Yang, Xiu
    Zhou, Aolin
    FRONTIERS IN ENERGY, 2018, 12 (04) : 518 - 528
  • [27] Scheduling of energy-efficient distributed blocking flowshop using pareto-based estimation of distribution algorithm
    Zhang, Xiaohui
    Liu, Xinhua
    Cichon, Andrzej
    Krolczyk, Grzegorz
    Li, Zhixiong
    EXPERT SYSTEMS WITH APPLICATIONS, 2022, 200
  • [28] Bi-objective algorithm based on NSGA-II framework to optimize reservoirs operation
    Liu, Dong
    Huang, Qiang
    Yang, Yuanyuan
    Liu, Dengfeng
    Wei, Xiaoting
    JOURNAL OF HYDROLOGY, 2020, 585
  • [29] A bi-objective production planning for a flexible supply chain solved using NSGA-II and MOPSO
    Karimi, S. K.
    Sadjadi, S. J.
    Naini, S. G. J.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT, 2022, 13 (01): : 18 - 37
  • [30] A memetic NSGA-II for the bi-objective mixed capacitated general routing problem
    Mandal, Santosh Kumar
    Pacciarelli, Dario
    Lokketangen, Arne
    Hasle, Geir
    JOURNAL OF HEURISTICS, 2015, 21 (03) : 359 - 390