Bi-objective optimization using an improved NSGA-II for energy-efficient scheduling of a distributed assembly blocking flowshop

被引:10
|
作者
Niu, Wei [1 ]
Li, Jun-qing [1 ,2 ]
Jin, Hui [1 ]
Qi, Rui [1 ]
Sang, Hong-yan [2 ]
机构
[1] Shandong Normal Univ, Sch Informat Sci & Engn, Jinan, Peoples R China
[2] Liaocheng Univ, Sch Comp, Liaocheng, Shandong, Peoples R China
基金
美国国家科学基金会;
关键词
Distributed permutation blocking flowshop; energy-efficient; Non-dominated Sorting Genetic Algorithm-II; multi-objective; ALGORITHM; MAKESPAN; EVOLUTION; MODEL;
D O I
10.1080/0305215X.2022.2032017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this study, an Energy-Efficient Distributed Assembly Blocking FlowShoP (EEDABFSP) is considered. An improved Non-dominated Sorting Genetic Algorithm-II (NSGA-II) is developed to solve it. Two objectives have been considered, i.e. minimizing the maximum completion time and total energy consumption. To begin, each feasible solution is encoded as a one-dimensional vector with the factory assignment, operation scheduling and speed setting assigned. Next, two initialization schemes are presented to improve both quality and diversity, which are based on distributed assembly attributes and the slowest allowable speed criterion, respectively. Then, to accelerate the convergence process, a novel Pareto-based crossover operator is designed. Because the populations have different initialization strategies, four different mutation operators are designed. In addition, a distributed local search is integrated to improve exploitation abilities. Finally, the experimental results demonstrate that the proposed algorithm is more efficient and effective for solving the EEDABFSP.
引用
收藏
页码:719 / 740
页数:22
相关论文
共 50 条
  • [1] Bi-objective scheduling for energy-efficient distributed assembly blocking flow shop
    Du, Song-Lin
    Zhou, Wen-Ju
    Fei, Min-Rui
    Nee, A. Y. C.
    Ong, S. K.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2024, 73 (01) : 357 - 360
  • [2] NSGA-II with Iterated Greedy for a Bi-objective Three-stage Assembly Flowshop Scheduling Problem
    Campos, Saulo Cunha
    Claudio Arroyo, Jose Elias
    GECCO'14: PROCEEDINGS OF THE 2014 GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2014, : 429 - 436
  • [3] A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem
    H. Asefi
    F. Jolai
    M. Rabiee
    M. E. Tayebi Araghi
    The International Journal of Advanced Manufacturing Technology, 2014, 75 : 1017 - 1033
  • [4] A hybrid NSGA-II and VNS for solving a bi-objective no-wait flexible flowshop scheduling problem
    Asefi, H.
    Jolai, F.
    Rabiee, M.
    Araghi, M. E. Tayebi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2014, 75 (5-8): : 1017 - 1033
  • [5] Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-II
    Dou, Jianping
    Li, Jun
    Su, Chun
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2016, 86 (5-8): : 1945 - 1962
  • [6] Bi-objective optimization of integrating configuration generation and scheduling for reconfigurable flow lines using NSGA-II
    Jianping Dou
    Jun Li
    Chun Su
    The International Journal of Advanced Manufacturing Technology, 2016, 86 : 1945 - 1962
  • [7] Bi-objective Portfolio Optimization Using a Customized Hybrid NSGA-II Procedure
    Deb, Kalyanmoy
    Steuer, Ralph E.
    Tewari, Rajat
    Tewari, Rahul
    EVOLUTIONARY MULTI-CRITERION OPTIMIZATION, 2011, 6576 : 358 - +
  • [8] A fuzzy bi-objective flexible cell scheduling optimization model under green and energy-efficient strategy using Pareto-based algorithms: SATPSPGA, SANRGA, and NSGA-II
    Far, Mohammad Hemmati
    Haleh, Hassan
    Saghaei, Abbas
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2019, 105 (09): : 3853 - 3879
  • [9] A fuzzy bi-objective flexible cell scheduling optimization model under green and energy-efficient strategy using Pareto-based algorithms: SATPSPGA, SANRGA, and NSGA-II
    Mohammad Hemmati Far
    Hassan Haleh
    Abbas Saghaei
    The International Journal of Advanced Manufacturing Technology, 2019, 105 : 3853 - 3879
  • [10] An energy-efficient reliable grid scheduling model using NSGA-II
    Achal Kaushik
    Deo Prakash Vidyarthi
    Engineering with Computers, 2016, 32 : 355 - 376