共 50 条
- [31] Construction technology research of cast-in-place lightweight gypsum wall Progress in Industrial and Civil Engineering III, Pt 1, 2014, 638-640 : 1591 - 1595
- [32] Summary Of Research On Seismic Behavior Of Precast Column System With The Same Effect As The Cast-In-Place Column 2018 3RD INTERNATIONAL CONFERENCE ON SMART CITY AND SYSTEMS ENGINEERING (ICSCSE), 2018, : 150 - 154
- [33] Research on the Influence of Karst Leakage on the Integrity of Cast-in-place Pile Journal of Railway Engineering Society, 2022, 39 (04): : 38 - 42
- [35] Shear Failure Mode and Concrete Edge Breakout Resistance of Cast-In-Place Anchors in Steel Fiber-Reinforced Normal Strength Concrete APPLIED SCIENCES-BASEL, 2020, 10 (19): : 1 - 19
- [37] Experimental study on seismic behavior of different type of frame connections with composite beams and cast-in-place columns Jianzhu Jiegou Xuebao, 2008, 6 (9-17): : 9 - 17
- [38] Experimental study on the shear capacity of rabbet cast-in-place prefabricated beam Xiao, Jianhua (xjhua55@163.com), 1600, Trans Tech Publications Ltd (980): : 266 - 274
- [39] Effects of repeated stress on soil behavior at cast-in-place pile toe DEEP FOUNDATIONS ON BORED AND AUGER PILES - BAP III, 1998, : 391 - 397