A simple model for predicting optimal weight recovery of industrial iron ore processing - case chicly: Iranian iron ore mines

被引:4
|
作者
Shahcheraghi, Seyed Hadi [1 ,2 ]
Najafzadeh, Mohammad [3 ]
Dianatpour, Mehdi [2 ]
Mirzadeh, Iman [2 ]
机构
[1] Univ Kurdistan, Fac Engn, Dept Min Engn, Sanandaj, Iran
[2] Gohar Zamin Iron Ore Co, Lab & Qual Control Unit, Sirjan 78185571, Iran
[3] Grad Univ Adv Technol, Fac Civil & Surveying Engn, Dept Water Engn, Kerman, Iran
关键词
Optimal weight recovery; Davis tube; wet low-intensity magnetic separator; MARS technique; iron ore processing; statistical process control; feed grade; data analysis;
D O I
10.1080/00084433.2022.2075074
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
One of the most important criteria in iron ore mining is predicting the optimal iron weight recovery of the processing plant which we intend to feed to a processing plant or sell. It is usually determined by the Davis tube in the laboratory located at the mine. The Davis tube test requires a long time, manpower and incurs high cost. To solve this problem, in this paper, a simple, fast and accurate model of optimal weight recovery using the Multivariate Adaptive Regression Spline (MARS) technique was proposed and validated by about 9000 data collected from various Iranian iron ore mines. The values of R-square and Root Mean Square Error (RMSE) obtained 0.981 and 2.364 for the training stage, respectively. In the case of the testing stage, Rsquare and RMSE values were equal to 0.978 and 2.538, respectively. Accordingly, the proposed model can be useful for quick decision-making before, during and after mine exploitation operations without the daily Davis tube test.
引用
收藏
页码:295 / 300
页数:6
相关论文
共 50 条
  • [41] Emission Impacts of Direct Reduced Iron-Ore Processing Systems: A Systems Thinking Approach in Case Studies of Canada and Peru
    Aydogdu, Kemalcan
    Duzgun, Sebnem
    STEEL RESEARCH INTERNATIONAL, 2024,
  • [42] Mineral processing plant location using the analytic hierarchy process——a case study:the Sangan iron ore mine(phase 1)
    SAFARI Mohsen
    ATAEI Mohammad
    KHALOKAKAIE Reza
    KARAMOZIAN Mohammad
    International Journal of Mining Science and Technology, 2010, 20 (05) : 691 - 695
  • [43] PLSR as a new XRD method for downstream processing of ores: - case study: Fe2+ determination in iron ore sinter
    Konig, Uwe
    Degen, Thomas
    Norberg, Nicholas
    POWDER DIFFRACTION, 2014, 29 : S78 - S83
  • [44] Remote sensing and GIS for assessment and prediction of environmental hazards due to mine waste - case study from Daitari iron ore mines, Odisha, India
    De, Atasi
    Kumar, Dheeraj
    EARTH RESOURCES AND ENVIRONMENTAL REMOTE SENSING/GIS APPLICATIONS IX, 2018, 10790
  • [45] Computer simulation of vibrating screen in a dry classification circuit case study - Gol-e-Gohar iron ore processing plant
    Parvizy, M. A.
    Dehghani, A.
    Mehrani, A.
    Zamani, F.
    IRON ORE CONFERENCE 2007, PROCEEDINGS, 2007, : 369 - +
  • [46] Using fuzzy TOPSIS method for mineral processing plant site selection Case study: Sangan iron ore mine (phase 2)
    Safari, Mohsen
    Kakaei, Reza
    Ataei, Mohammad
    Karamoozian, Mohammad
    ARABIAN JOURNAL OF GEOSCIENCES, 2012, 5 (05) : 1011 - 1019
  • [47] Association between Whole-Body Vibration exposure and musculoskeletal disorders among dumper operators: A case-control study in Indian iron ore mines
    Upadhyay, Rahul
    Bhattacherjee, Ashis
    Patra, Aditya Kumar
    Chau, Nearkasen
    WORK-A JOURNAL OF PREVENTION ASSESSMENT & REHABILITATION, 2022, 71 (01): : 235 - 247
  • [48] Successive approximate model based multi-objective optimization for an industrial straight grate iron ore induration process using evolutionary algorithm
    Mitra, Kishalay
    Majumder, Sushanta
    CHEMICAL ENGINEERING SCIENCE, 2011, 66 (15) : 3471 - 3481
  • [49] Recovery of nickel and iron from low-grade laterite ore and red mud using co-reduction roasting: Industrial-scale test
    Guo, Xiaoshuang
    Xu, Chengyan
    Wang, Yingshuo
    Li, Xiaohui
    Sun, Tichang
    PHYSICOCHEMICAL PROBLEMS OF MINERAL PROCESSING, 2021, 57 (03): : 61 - 72
  • [50] Effect of particle size distribution on the dewatering circuit design; case study: iron ore tailing of the Gol-E-Gohar mining and industrial company
    Saeid, Zare
    Gholamabbas, Parsapour
    Mojtaba, Ghorbannejad
    Alireza, Hasankhoei
    CANADIAN METALLURGICAL QUARTERLY, 2024,