A novel optimization method for geological drilling vertical well

被引:3
|
作者
Zhou, Yang [1 ,2 ,3 ]
Chen, Xin [1 ,2 ,3 ]
Wu, Min [1 ,2 ,3 ]
Cao, Weihua [1 ,2 ,3 ]
机构
[1] China Univ Geosci, Sch Automat, Wuhan 430074, Peoples R China
[2] Hubei Key Lab Adv Control & Intelligent Automat Co, Wuhan 430074, Peoples R China
[3] Minist Educ, Engn Res Ctr Intelligent Technol Geoexplorat, Wuhan 430074, Peoples R China
基金
中国国家自然科学基金; 国家重点研发计划;
关键词
Support vector regression; Hybrid bat algorithm; Drilling optimization strategy; Vertical well constraints;
D O I
10.1016/j.ins.2023.03.082
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Geological drilling is an important means for exploration of the earth. Due to the nonlinearity and coupling, geological drilling is accompanied by low efficiency and safety, and difficult to accurately predict the drilling states. Moreover, the vertical well trajectory needs to follow the plumb line. A novel optimization method is proposed to solve these problems. First, working conditions are identified by fuzzy C-means clustering method and corresponding adjustment ranges of operating variables are refined for optimization. Meanwhile, support vector regression and hybrid bat algorithm are employed to construct reliable models for mud pit volume (MPV) and rate of penetration (ROP). Then, how to improve safety and efficiency is converted to a two-objective problem, that is to suppress MPV fluctuations and improve ROP with vertical well constraints. Nondominated sorting genetic algorithm II is invoked to solve this problem, and the appropriate solution is selected by two references points. Moreover, a short-time scale and long-time scale optimization strategy is introduced to cope with different adjustment interval of operating variables. Finally, the simulation results based on actual drilling data, application results in a semi-physical experiment system and comparison results from a vertical well verify the effectiveness and practicability for the developed method.
引用
收藏
页码:550 / 563
页数:14
相关论文
共 50 条
  • [1] A novel modeling and drilling optimization method with suitable constraints in geological well
    Zhou, Yang
    Chen, Xin
    Wu, Min
    Cao, Weihua
    CONTROL ENGINEERING PRACTICE, 2022, 122
  • [2] Hydraulic optimization of foam drilling for maximum drilling rate in vertical well
    Kuru, E
    Okunsebor, OM
    Li, Y
    SPE DRILLING & COMPLETION, 2005, 20 (04) : 258 - 267
  • [3] Efficiency of application of method electrohydropulse drilling for different geological a well section
    Kurmangaliyev, A. Sh.
    Kussayinov, K.
    Akhmadiyev, B. A.
    Nurgaliyeva, Zh. G.
    Karabekova, D. Zh.
    BULLETIN OF THE UNIVERSITY OF KARAGANDA-PHYSICS, 2016, 2 (82): : 56 - 60
  • [4] Well wall water leakage control technology of the vertical well drilling method in coal mines based on the grouting of the ground directional drilling
    Wang, Xuesong
    Cheng, Hua
    Rong, Chuanxin
    Yao, Zhishu
    Yu, Dayou
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (07): : 168 - 177
  • [5] Optimization of well pad design and drilling - well clustering
    Abramov, Aleksandr
    PETROLEUM EXPLORATION AND DEVELOPMENT, 2019, 46 (03) : 614 - 620
  • [6] Optimization of well length for horizontal drilling
    Cho, H
    Shah, SN
    JOURNAL OF CANADIAN PETROLEUM TECHNOLOGY, 2002, 41 (05): : 54 - 62
  • [7] HELICAL FLOW OF DRILLING MUD WITH CUTTINGS IN A VERTICAL WELL
    Ignatenko, Yaroslav
    Gavrilov, Andrey
    Bocharov, Oleg
    PROCEEDINGS OF ASME 2021 40TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING (OMAE2021), VOL 10, 2021,
  • [8] Optimization of well pad design and drilling-well clustering
    ABRAMOV Aleksandr
    PetroleumExplorationandDevelopment, 2019, 46 (03) : 614 - 620
  • [9] Optimization of well pad design and drilling-well clustering
    Abramov A.
    Shiyou Kantan Yu Kaifa/Petroleum Exploration and Development, 2019, 46 (03): : 588 - 593
  • [10] Improving horizontal-well productivity using novel technology and optimization of drilling fluid
    Qudaihy, DS
    Nughaimish, FNA
    Sunbul, AH
    Ansari, AA
    Hembling, DE
    Al-Faraj, OA
    Voll, BA
    SPE DRILLING & COMPLETION, 2005, 20 (03) : 205 - 208