Well wall water leakage control technology of the vertical well drilling method in coal mines based on the grouting of the ground directional drilling

被引:0
|
作者
Wang, Xuesong [1 ]
Cheng, Hua [1 ]
Rong, Chuanxin [1 ]
Yao, Zhishu [1 ]
Yu, Dayou [2 ]
机构
[1] School of Civil Engineering and Architecture, Anhui University of Science and Technology, Huainan,232001, China
[2] First Exploration Team, Anhui Provincial Coalfield Geological, Huainan,232035, China
关键词
Control technologies - Deep alluvium - Drilling methods - Drilling wall - Ground directional drilling - Leakage-control - Single layer - Water leakage - Well wall stubble - Wellbore;
D O I
10.12438/cst.2023-1261
中图分类号
学科分类号
摘要
The coal mine drilling shaft wall is a single-layer structure, and water leakage in the deep alluvium will seriously threaten mine safety. If there are construction defects in the stubble part of the well wall at the construction stage, it will lead to groundwater corrosion and rust through the metal and the weld seam of the stubble part, resulting in water leakage from well wall, which, if not treated promptly, is prone to lead to a sudden water-sand inrush and flooding accidents. In order to explore an effective treatment technology, a research on the control technology of water leakage from the wall of coal mine drilling wells was carried out with the background of water leakage control of wall of sub-well of the Xutong Coal Mine. Firstly, the causes of water leakage from the single-layer well wall of the drilling method were analyzed with the information of hydrogeological characteristics of mine. It was found that the main reason of water leakage at the sub-well wall of Xutong Mine was that the high-pressure groundwater recharged from the aquifers flowed into the well through the gravel packing layer with great pore connectivity, after the corrosive effects of groundwater jointly penetrated the stubs of well walls. Then, the feasibility and safety of using post-wall grouting and ground drilling grouting for water leakage control in the wall of sub-well wall in Xutong Coal Mine were compared and analyzed. Post-wall grouting of reinforced concrete single-layer well walls constructed using the drilling method in fluvial sand layer was found to pose a high safety risk, affecting the normal lifting of wellbore and risking the re-occurrence of water leakage. Ground directional drilling grouting technology had a large grouting volume, and the pores in the gravel filling layer behind the wall can be fully filled by cement slurry, improving the leakage prevention and bearing capacity of the wellbore, and the construction personnel operated on the ground, which was safe and did not affect the normal lifting of the wellbore. Finally, the ground directional drilling grouting technology for water leakage control of coal mine wall in deep alluvium was proposed and demonstrated. A total of 130.9 m3 of cement slurry was injected into the two boreholes, which completely filled the pores space between the gravel of the filling layer behind the wall of the layer from 94.00-131.40 m, and successfully blocked the water outlet point at 94 m down-hole. No further water leakage from this section of the well wall had been observed on site over a long period of time. The research results shown that, the ground directional drilling grouting technology had good control effect and high safety for the water leakage of coal mine drilling well wall in deep alluvium. The research results can provide a certain reference for the water leakage control of coal mine drilling well wall in deep alluvium. © 2024 China Coal Society. All rights reserved.
引用
收藏
页码:168 / 177
相关论文
共 50 条
  • [1] Water Hazard Control Technology Based on Integral Drilling and Controllable Grouting in Coal Mines
    Liu, Qisheng
    Liu, Zaibin
    Liu, Zewei
    Chen, Baohui
    MINE WATER AND THE ENVIRONMENT, 2022, 41 (01) : 119 - 125
  • [2] A novel optimization method for geological drilling vertical well
    Zhou, Yang
    Chen, Xin
    Wu, Min
    Cao, Weihua
    INFORMATION SCIENCES, 2023, 634 : 550 - 563
  • [3] Advanced directional drilling technology for gas drainage and exploration in Australian coal mines
    Wang, Fangtian
    Ren, Ting X.
    Hungerford, Frank
    Tu, Shihao
    Aziz, Naj
    ISMSSE 2011, 2011, 26
  • [4] Design of An Intelligent Control System for Underground Directional Drilling Trajectory in Coal Mines
    Li, Wangnian
    Wu, Min
    Yao, Ke
    Li, Quanxin
    Lu, Chengda
    Du, Sheng
    2022 41ST CHINESE CONTROL CONFERENCE (CCC), 2022, : 2586 - 2590
  • [5] Side track directional drilling technology in Yunan-I well
    Shi You Zuan Cai Gong Yi, 2 (21-25):
  • [6] Design of an Intelligent Control System for Compound Directional Drilling in Underground Coal Mines
    Li, Wangnian
    Wu, Min
    Chen, Shipeng
    Mu, Lingfeng
    Lu, Chengda
    Chen, Luefeng
    JOURNAL OF ADVANCED COMPUTATIONAL INTELLIGENCE AND INTELLIGENT INFORMATICS, 2024, 28 (04) : 1052 - 1062
  • [7] GROUND WATER HYDROLOGY FOR WATER WELL DRILLING CONTRACTORS - RAU,JL
    BEELEY, BW
    PROFESSIONAL GEOGRAPHER, 1969, 21 (02): : 128 - 128
  • [8] A Fire Prevention and Control Method of Coal Mine Goaf Using Directional Drilling Technology
    Song Yubo
    SIXTH INTERNATIONAL CONFERENCE ON ELECTROMECHANICAL CONTROL TECHNOLOGY AND TRANSPORTATION (ICECTT 2021), 2022, 12081
  • [9] Directional drilling technology and equipment for gas drainage in large panel of underground coal mines
    Xu C.
    Jiang L.
    Chen P.
    Zhang D.
    Meitiandizhi Yu Kantan/Coal Geology and Exploration, 2022, 50 (04): : 147 - 152
  • [10] Pneumatic directional drilling technology and equipment for broken-soft coal seams in underground coal mines
    Tian H.
    Zhang J.
    Wang L.
    Fang J.
    Wang J.
    Meitiandizhi Yu Kantan/Coal Geology and Exploration, 2024, 52 (06): : 154 - 165