An efficient GRASP-like algorithm for the multi-product straight pipeline scheduling problem

被引:10
|
作者
Bamoumen, Meryem [1 ,2 ]
Elfirdoussi, Selwa [1 ]
Ren, Libo [2 ,3 ]
Tchernev, Nikolay [1 ,2 ]
机构
[1] Mohammed VI Polytech Univ, Scholl Ind Management, EMINES, Ben Guerir, Morocco
[2] Clermont Auvergne Univ, Lab Informat, UMR CNRS 6158, LIMOS, Aubiere, France
[3] Clermont Auvergne Univ, CLeRMa EA3849, Clermont Ferrand, France
关键词
Oil pipeline; Scheduling; Metaheuristic; Mixed integer linear programming; GRASP; DECOMPOSITION APPROACH; INVENTORY MANAGEMENT; MILP APPROACH; FORMULATION; MODEL;
D O I
10.1016/j.cor.2022.106082
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The present work deals with the multi-product straight pipeline scheduling problem. The considered straight pipeline system is used to transport refined petroleum products from a single source (refinery with storage tanks) to a single destination (distribution center). The main objective is to find a sequence of batches which aims to maximize the total volume to be transported via the pipeline, while meeting the daily customer demands over a fixed time horizon. Each batch contains only one product with a volume between its upper and lower bounds. Constraints related to inventory levels, batch settling periods and forbidden sequences between pairs of products must be respected, and pipeline stoppage periods should also be handled. A Mixed Integer Linear Programming (MILP) model and a Greedy Randomized Adaptive Search Procedure (GRASP)-like algorithm are proposed to tackle the problem under study. The MILP model is based on the discharging time axis with continuous repre-sentation for both time and volume formulation. The GRASP-like algorithm is composed of a construction method and an improvement procedure. The construction method generates a new sequence of batches in a random way with the use of a repair process to obtain an initial solution that satisfies all demands. Then, the improvement procedure is attempted to increase the fill rate of pipeline using volume optimization operators without change the sequence of products. A set of instances was generated from a real case study in order to validate the proposed approach. The performance of our approach is benchmarked against the MILP model (solved using Gurobi Solver), and the numerical experiments proved that the proposed approach obtains very competitive results both in term of solution quality and CPU time.
引用
收藏
页数:19
相关论文
共 50 条
  • [31] Hydraulic model optimization of a multi-product pipeline
    Liang Yongtu 1
    Petroleum Science, 2012, (04) : 521 - 526
  • [32] Hydraulic model optimization of a multi-product pipeline
    Liang Yongtu Li Ming and Li Jiangfei School of Petroleum EngineeringChina University of PetroleumBeijingBeijing China Sinopec Engineering CorporationBeijing China
    Petroleum Science, 2012, 9 (04) : 521 - 526
  • [33] Hydraulic model optimization of a multi-product pipeline
    Liang Yongtu
    Li Ming
    Li Jiangfei
    PETROLEUM SCIENCE, 2012, 9 (04) : 521 - 526
  • [34] MODELING MULTI-PRODUCT PIPELINE HYDRAULICS WITH A SPREADSHEET
    Horner, Jim W.
    IPC2008: PROCEEDINGS OF THE ASME INTERNATIONAL PIPELINE CONFERENCE - 2008, VOL 1, 2009, : 61 - 67
  • [35] On a multi-product lot scheduling problem subject to an imperfect process with standby modules
    Lin, Gary C.
    Wu, Andy
    Gong, Dah-Chuang
    Huang, Boray
    Ma, Wen-Na
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2014, 52 (08) : 2243 - 2257
  • [36] Multi-product valid inequalities for the discrete lot-sizing and scheduling problem
    Gicquel, C.
    Minoux, M.
    COMPUTERS & OPERATIONS RESEARCH, 2015, 54 : 12 - 20
  • [37] DETERMINISTIC DEMAND MULTI-PRODUCT SINGLE-MACHINE LOT SCHEDULING PROBLEM
    GRAVES, SC
    MANAGEMENT SCIENCE, 1979, 25 (03) : 276 - 280
  • [38] A Fuzzy Approach to Multi-product Mixed Production Job Shop Scheduling Algorithm
    Wang, Wanlei
    Yuan, Changfeng
    Liu, Xiaobing
    FIFTH INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS AND KNOWLEDGE DISCOVERY, VOL 1, PROCEEDINGS, 2008, : 95 - +
  • [39] ITERATIVE PROCEDURE FOR SINGLE-MACHINE MULTI-PRODUCT LOT SCHEDULING PROBLEM
    DOLL, CL
    WHYBARK, DC
    MANAGEMENT SCIENCE SERIES A-THEORY, 1973, 20 (01): : 50 - 55
  • [40] SCHEDULING A MULTI-PRODUCT SINGLE MACHINE SYSTEM
    GOYAL, SK
    OPERATIONAL RESEARCH QUARTERLY, 1973, 24 (02) : 261 - 269