An efficient GRASP-like algorithm for the multi-product straight pipeline scheduling problem

被引:10
|
作者
Bamoumen, Meryem [1 ,2 ]
Elfirdoussi, Selwa [1 ]
Ren, Libo [2 ,3 ]
Tchernev, Nikolay [1 ,2 ]
机构
[1] Mohammed VI Polytech Univ, Scholl Ind Management, EMINES, Ben Guerir, Morocco
[2] Clermont Auvergne Univ, Lab Informat, UMR CNRS 6158, LIMOS, Aubiere, France
[3] Clermont Auvergne Univ, CLeRMa EA3849, Clermont Ferrand, France
关键词
Oil pipeline; Scheduling; Metaheuristic; Mixed integer linear programming; GRASP; DECOMPOSITION APPROACH; INVENTORY MANAGEMENT; MILP APPROACH; FORMULATION; MODEL;
D O I
10.1016/j.cor.2022.106082
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The present work deals with the multi-product straight pipeline scheduling problem. The considered straight pipeline system is used to transport refined petroleum products from a single source (refinery with storage tanks) to a single destination (distribution center). The main objective is to find a sequence of batches which aims to maximize the total volume to be transported via the pipeline, while meeting the daily customer demands over a fixed time horizon. Each batch contains only one product with a volume between its upper and lower bounds. Constraints related to inventory levels, batch settling periods and forbidden sequences between pairs of products must be respected, and pipeline stoppage periods should also be handled. A Mixed Integer Linear Programming (MILP) model and a Greedy Randomized Adaptive Search Procedure (GRASP)-like algorithm are proposed to tackle the problem under study. The MILP model is based on the discharging time axis with continuous repre-sentation for both time and volume formulation. The GRASP-like algorithm is composed of a construction method and an improvement procedure. The construction method generates a new sequence of batches in a random way with the use of a repair process to obtain an initial solution that satisfies all demands. Then, the improvement procedure is attempted to increase the fill rate of pipeline using volume optimization operators without change the sequence of products. A set of instances was generated from a real case study in order to validate the proposed approach. The performance of our approach is benchmarked against the MILP model (solved using Gurobi Solver), and the numerical experiments proved that the proposed approach obtains very competitive results both in term of solution quality and CPU time.
引用
收藏
页数:19
相关论文
共 50 条
  • [1] A hybrid heuristic for the multi-product straight pipeline scheduling problem
    Bamoumen, M.
    Belil, S.
    Elfirdoussi, S.
    Ren, L.
    Tchernev, N.
    IFAC PAPERSONLINE, 2019, 52 (13): : 535 - 540
  • [2] Scheduling a multi-product pipeline network
    de Souza Filho, Erito Marques
    Bahiense, Laura
    Martins Ferreira Filho, Virgilio Jose
    COMPUTERS & CHEMICAL ENGINEERING, 2013, 53 : 55 - 69
  • [3] The multi-product pipeline scheduling system
    MirHassani, S. A.
    Ghorbanalizadeh, M.
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2008, 56 (04) : 891 - 897
  • [4] GRASP-based heuristic algorithm for the multi-product multi-vehicle inventory routing problem
    Guemri, Oualid
    Bekrar, Abdelghani
    Beldjilali, Bouziane
    Trentesaux, Damien
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2016, 14 (04): : 377 - 404
  • [5] GRASP-based heuristic algorithm for the multi-product multi-vehicle inventory routing problem
    Oualid Guemri
    Abdelghani Bekrar
    Bouziane Beldjilali
    Damien Trentesaux
    4OR, 2016, 14 : 377 - 404
  • [6] An heuristic algorithm for a multi-product, single machine capacitated production scheduling problem
    Bankston, JB
    Harnett, RM
    COMPUTERS & OPERATIONS RESEARCH, 2000, 27 (01) : 77 - 92
  • [7] IMPLEMENTING SOFTWARE SYSTEMS FOR MULTI-PRODUCT PIPELINE SCHEDULING.
    Sparrow, D.
    Pipes and Pipelines International, 1985, 30 (04): : 14 - 18
  • [8] A GENETIC ALGORITHM FOR A MULTI-PRODUCT DISTRIBUTION PROBLEM
    Cretu, Bruno
    Fontes, Dalila B. M. M.
    Homayouni, Seyed Mahdi
    INTERNATIONAL JOURNAL FOR QUALITY RESEARCH, 2019, 13 (04) : 901 - 914
  • [9] An interactive fuzzy programming approach for a new multi-objective multi-product oil pipeline scheduling problem
    Goudarzi, F. Khalili
    Maleki, H. R.
    Niroomand, S.
    IRANIAN JOURNAL OF FUZZY SYSTEMS, 2021, 18 (04): : 95 - 112
  • [10] A genetic algorithm for scheduling of multi-product batch processes
    Jae Hak Jung
    Chang Hyung Lee
    In-Beum Lee
    Computers and Chemical Engineering, 1998, 22 (11): : 1725 - 1730