共 50 条
- [41] A bi-objective programming model for reliable supply chain network design under facility disruption INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2019, 11 (06): : 80 - 92
- [43] Developing a Bi-objective Mathematical Model to Design the Fish Closed-loop Supply Chain INTERNATIONAL JOURNAL OF ENGINEERING, 2021, 34 (05): : 1257 - 1268
- [44] Bi-objective resource constrained project scheduling problem with makespan and net present value criteria: two meta-heuristic algorithms INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 69 (1-4): : 617 - 626
- [45] Bi-objective resource constrained project scheduling problem with makespan and net present value criteria: two meta-heuristic algorithms The International Journal of Advanced Manufacturing Technology, 2013, 69 : 617 - 626