Multi-objective maintenance planning under preventive maintenance

被引:11
|
作者
Al-Refaie, Abbas [1 ]
Almowas, Hiba [2 ]
机构
[1] Univ Jordan, Ind Engn, Amman, Jordan
[2] Univ Jordan, Amman, Jordan
关键词
Optimization; Preventive maintenance; Corrective; Series system; INTEGRATED PRODUCTION; SINGLE-MACHINE; RELIABILITY; OPTIMIZATION; AVAILABILITY; COST; PM;
D O I
10.1108/JQME-05-2021-0035
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose This research developed and examined a mathematical model for concurrent corrective and preventive maintenance policy of a system of series configuration. Design/methodology/approach A mathematical model was developed to maximize availability, and maximal net revenues, and minimal cost. Different probability distributions for time to failure and time to repair were considered. The model was then implemented on a real case study, which was studied under corrective maintenance policy and concurrent corrective and preventive policy. Findings A comparison between results at current policy (90 days) and optimal period of corrective and preventive policy was conducted. It was found that availability, profit was increased from 94.4% and $20.091 - 96.5% and $24.803, respectively. Further, the cost was reduced from $1104.8 to $797.22. Research limitations/implications The proposed optimization model can be adopted in planning maintenance activities for a single machine as well as for a system of series configuration machines under various probability distributions. Practical implications The proposed model can significantly enhance performance of the production as well as maintenance systems. In addition, the developed model may support maintenance engineering in effective management of maintenance resources and the performance of its activities. Originality/value This research considers a mathematical model with multi-objective functions and distinct probability distributions for time-to-failure for a system of series machines. Moreover, appropriate approximation solution was deployed to find integral of some functions. Finally, it provides maintenance planning for a single machine or a series of machines.
引用
收藏
页码:50 / 70
页数:21
相关论文
共 50 条
  • [31] AN INTEGRATED MODEL OF PRODUCTION SCHEDULING AND MAINTENANCE PLANNING UNDER IMPERFECT PREVENTIVE MAINTENANCE
    Chen, Xiaohui
    Xiao, Lei
    Zhang, Xinghui
    Xiao, Weixiao
    Li, Junxing
    EKSPLOATACJA I NIEZAWODNOSC-MAINTENANCE AND RELIABILITY, 2015, 17 (01): : 70 - 79
  • [32] Multi-stage production planning using fuzzy multi-objective programming with consideration of maintenance
    Feylizadeh, Mohammad Reza
    Karimi, Negar
    Li, Deng-Feng
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2018, 34 (04) : 2753 - 2769
  • [33] A Multi-Objective Optimization for Locating Maintenance Stations and Operator Dispatching of Corrective Maintenance
    Yang, Chao-Lung
    Teshome, Melkamu Mengistnew
    Yeh, Yu-Zhen
    Meles, Tamrat Yifter
    CMC-COMPUTERS MATERIALS & CONTINUA, 2024, 79 (03): : 3519 - 3547
  • [34] Optimizing the multi-objective preventive maintenance model for complex systems using a proposed IPSO algorithm
    Tsai, Sheng-Wang
    Wang, Chung-Ho
    Chung Cheng Ling Hsueh Pao/Journal of Chung Cheng Institute of Technology, 2014, 43 (01): : 195 - 210
  • [35] Multi-objective preventive maintenance strategy and optimization considering unavailability and cost: A case study on VOBC
    Peng, Cong
    Wei, Shangguan
    Peng, Jiali
    Wang, Zongyao
    Chai, Linguo
    Cai, Baigen
    Xing, Yulong
    ALEXANDRIA ENGINEERING JOURNAL, 2024, 105 : 567 - 577
  • [36] Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization
    Du-Juan Wang
    Feng Liu
    Jian-Jun Wang
    Yan-Zhang Wang
    Soft Computing, 2016, 20 : 1635 - 1652
  • [37] Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization
    Wang, Du-Juan
    Liu, Feng
    Wang, Jian-Jun
    Wang, Yan-Zhang
    SOFT COMPUTING, 2016, 20 (04) : 1635 - 1652
  • [38] Bi-objective Optimization Integration of Multi-Resource Preventive Production and Maintenance Planning
    Fajar, Yoga
    Komarudin
    2022 7TH INTERNATIONAL CONFERENCE ON BUSINESS AND INDUSTRIAL RESEARCH (ICBIR2022), 2022, : 577 - 581
  • [39] Robust selective maintenance strategy under imperfect observations: A multi-objective perspective
    Jiang, Tao
    Liu, Yu
    IISE TRANSACTIONS, 2020, 52 (07) : 751 - 768
  • [40] Robust multi-objective maintenance planning of deteriorating bridges against uncertainty in performance model
    Ok, Seung-Yong
    Lee, Sun-Young
    Park, Wonsuk
    ADVANCES IN ENGINEERING SOFTWARE, 2013, 65 : 32 - 42