Assessment of critical success factors, barriers and initiatives of total productive maintenance (TPM) in selected Ethiopian manufacturing industries

被引:0
|
作者
Gelaw, Mulatu Tilahun [1 ]
Azene, Daniel Kitaw [1 ]
Berhan, Eshetie [1 ]
机构
[1] Addis Ababa Univ, Sch Mech & Ind Engn, Addis Ababa, Ethiopia
关键词
Maintenance; Total productive maintenance; TPM; Overall equipment effectiveness; OEE; PLS-SEM; Structural equation modeling; Manufacturing industries; IMPLEMENTATION;
D O I
10.1108/JQME-11-2022-0073
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose - This research aims to investigate critical success factors, barriers and initiatives of total productive maintenance (TPM) implementation in selected manufacturing industries in Addis Ababa, Ethiopia. Design/methodology/approach - This study built and looked into a conceptual research framework. The potential barriers and success factors to TPM implementation have been highlighted. The primary study techniques used to collect relevant data were a closed-ended questionnaire and semi-structured interview questions. With the use of SPSS version 23 and SmartPLS 3.0 software, the data were examined using descriptive statistics and the inferential Partial Least Square Structural Equation Modeling (PLS-SEM) techniques. Findings - According to the results of descriptive statistics and multivariate analysis using PLS-SEM, the case manufacturing industries' TPM implementation initiative is in its infancy; break down maintenance is the most widely used maintenance policy; top managers are not dedicated to the implementation of TPM; and there are TPM pillars that have been weakly and strongly addressed by the case manufacturing companies. Research limitations/implications - The small sample size is a limitation to this study. It is therefore challenging to extrapolate the research findings to other industries. The only manufacturing KPI utilized in this study is overall equipment effectiveness (OEE). It is possible to add more parameters to the manufacturing performance measurement KPI. The relationships between TPM and other lean production methods may differ from those observed in this cross-sectional study. Longitudinal experimental studies and in-depth analyses of TPM implementations may shed further light on this. Practical implications - Defining crucial success factors and barriers to TPM adoption, as well as identifying the weak and strong TPM pillars, will help companies in allocating their scarce resources exclusively to the most important areas. TPM is not a quick solution. It necessitates a change in both the company's and employees' attitude and their values, which takes time to bring about. Hence, it entails a long-term planning. The commitment of top managers is very important in the initiatives of TPM implementation. Originality/value - This study is unique in that, it uses a new conceptual research model and the PLS-SEM technique to analyze relationships between TPM pillars and OEE in depth.
引用
收藏
页码:51 / 80
页数:30
相关论文
共 49 条
  • [21] Critical success factors for Kaizen implementation in manufacturing industries in Mexico
    García, J.L. (jorge.garcia@uacj.mx), 1600, Springer London (68): : 1 - 4
  • [22] Critical success factors for Kaizen implementation in manufacturing industries in Mexico
    Jorge L. García
    Denisse G. Rivera
    Alejandro Alvarado Iniesta
    The International Journal of Advanced Manufacturing Technology, 2013, 68 : 537 - 545
  • [23] Barriers in Total Productive Maintenance Implementation in a Semiconductor Manufacturing Firm: A Case Study
    Ng, K. C.
    Goh, G. G. G.
    Eze, U. C.
    2012 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2012, : 377 - 381
  • [25] Hands-On Graduate Courses in Lean Manufacturing (LM) Emphasizing Green and Total Productive Maintenance (TPM)
    Peter, Geoffrey J.
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION (IMECE 2010), VOL 6, 2012, : 357 - 365
  • [26] The implementation and evaluation of Total Productive Maintenance (TPM)—an action case study in a Hong Kong manufacturing company
    Hongyi Sun
    Richard Yam
    Ng Wai-Keung
    The International Journal of Advanced Manufacturing Technology, 2003, 22 : 224 - 228
  • [27] The implementation and evaluation of Total Productive Maintenance (TPM) - an action case study in a Hong Kong manufacturing company
    Sun, HY
    Yam, R
    Wai-Keung, N
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2003, 22 (3-4): : 224 - 228
  • [28] Unlocking the Potential of Predictive Maintenance for Intelligent Manufacturing: a Case Study On Potentials, Barriers, and Critical Success Factors
    Marcel André Hoffmann
    Rainer Lasch
    Schmalenbach Journal of Business Research, 2025, 77 (1): : 27 - 55
  • [29] Barriers and Critical Success Factors for Implementing Lean Manufacturing in SMEs
    Elkhairi, Ayoub
    Fedouaki, Faycal
    El Alami, Semma
    IFAC PAPERSONLINE, 2019, 52 (13): : 565 - 570
  • [30] Critical success factors for operational excellence initiatives in manufacturing: a meta-analysis
    Antony, Jiju
    Swarnakar, Vikas
    Gupta, Neha
    Kaur, Jaspreet
    Jayaraman, Raja
    Tortorella, Guilherme Luz
    Cudney, Elizabeth
    TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2023, 34 (9-10) : 1152 - 1172