共 50 条
- [21] Stochastic Earthmoving Fleet Arrangement Optimization Considering Project Duration and Cost MODELLING, 2020, 1 (02): : 156 - 174
- [22] A Fixed Start Scheduling Approach for Repetitive Construction Projects KSCE Journal of Civil Engineering, 2020, 24 : 1671 - 1682
- [24] Segmentation and Repetitive Scheduling of Linear Continuous Construction Projects OPERATIONS RESEARCH PROCEEDINGS 2021, 2022, : 134 - 140
- [26] Construction Project Cost and Duration Optimization Using Artificial Neural Network AEI 2015: BIRTH AND LIFE OF THE INTEGRATED BUILDING, 2015, : 433 - 444
- [28] Cost optimization in projects with repetitive nonserial activities JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2001, 127 (03): : 183 - 191