Applicable Conditions of Room-and-Pillar Mining Goaf Treatment Methods under a Traffic Load

被引:4
|
作者
Zu, Fajin [1 ,2 ]
Du, Chao [1 ]
Han, Chunpeng [1 ]
Xu, Lanyu [2 ]
Peng, Qiuying [2 ]
机构
[1] Northeast Forestry Univ, Sch Civil Engn, Harbin 150040, Peoples R China
[2] Heilongjiang Prov Highway Survey & Design Inst, Harbin 150080, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 03期
关键词
traffic load; room-and-pillar mining goaf; goaf treatment; orthogonal test;
D O I
10.3390/app13032024
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The disturbance depth of traffic load has a direct impact on the stability of a room-and-pillar mining goaf. To quantitatively calculate the relationship between the traffic load disturbance depth and influencing factors, 49 groups of horizontal combinations of different influencing parameters are designed in this study, based on the orthogonal experimental design method. Midas GTS is used to simulate and obtain the corresponding traffic load disturbance depth data. A multivariate linear regression analysis of the traffic load disturbance depth is conducted, and a regression formula for calculating the traffic load disturbance depth is established. According to the traffic load disturbance depth, goaf depth, and the stability of the roof, coal pillar, and base plate under traffic load conditions, a judgment flow of the room-and-pillar mining goaf treatment method under traffic load conditions is established, and it is applied to the reconstruction and expansion project of the Jixi section of the Dan-A national highway. The results show that a geogrid can be used for treatment purposes when the traffic load disturbance depth is 1.5 times lower than the depth of the room-and-pillar mining goaf, or when the traffic load disturbance depth is 1.5 times greater than the depth of the room-and-pillar mining goaf but the roof, coal pillar, and base plate are stable. Additionally, grouting is needed for treatment in other cases. The results of this study can provide a scientific basis for the selection of treatment methods for room-and-pillar mining goafs underlying highways in the future. The results are of great significance in the field of engineering for the safety measures concerning highway room-and-pillar mining goafs.
引用
收藏
页数:17
相关论文
共 50 条
  • [31] A method for analyzing and designing frictional rock bolting systems in room-and-pillar mining
    Nikolaev, N
    Parushev, V
    MINE PLANNING AND EQUIPMENT SELECTION 2000, 2000, : 349 - 353
  • [32] Technological and geomechanical parameters of room-and-pillar system of mining a thick flat seam
    Egorov, PV
    Kalinin, SI
    Agudalin, BP
    JOURNAL OF MINING SCIENCE, 2001, 37 (05) : 472 - 474
  • [33] APPLICATION OF WORKSTATION SOFTWARE TO NUMERICAL MODELING OF ROOM-AND-PILLAR COAL-MINING
    FAMA, MED
    FOLLINGTON, IL
    TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING INDUSTRY, 1992, 101 : A89 - A94
  • [34] MODELING OF OVERBURDEN FAILURE UNDER THE CONDITION OF MINING TWO CLOSE-RANGE SEAMS USING ROOM-AND-PILLAR ANDLONGWALL MINING
    张玉卓
    王明立
    Journal of Coal Science & Engineering(China), 2000, (01) : 10 - 13
  • [35] Geomechanical safety aspects in hard rocks mining based on room-and-pillar and longwall mining systems
    Pytel, Witold
    Palac-Walko, Bogumila
    Mertuszka, Piotr
    MINEFILL 2020-2021, 2021, : 288 - 304
  • [36] Mining block stability analysis for room-and-pillar mining with continuous miner in Estonian oil shale mines
    Nikitin, O
    OIL SHALE, 2003, 20 (04) : 515 - 528
  • [37] Arc-shaped bulkhead applied in short-wall room-and-pillar mining
    Zhang, Kaizhi
    Pan, Ruikai
    Jiang, Jinquan
    Ji, Songtao
    Wang, Shuli
    Electronic Journal of Geotechnical Engineering, 2014, 19 (Z6): : 17617 - 17625
  • [38] IMMEDIATE ROOF STABILITY ANALYSIS FOR NEW ROOM-AND-PILLAR MINING TECHNOLOGY IN "ESTONIA" MINE
    Nikitin, Oleg
    Sabanov, Sergei
    ENVIRONMENT, TECHNOLOGY, RESOURCES, PROCEEDINGS, 2005, : 262 - 269
  • [39] CLASSIFICATION OF PROTECTIVE PILLARS TOWARD HIGHER SAFETY AND INNOVATION IN ROOM-AND-PILLAR COAL MINING
    Prokopenko, S. A.
    Sementsov, V. V.
    Dobrovolsky, M. S.
    Nifanov, E., V
    EURASIAN MINING, 2020, (02): : 24 - 27
  • [40] Analysis of the roof span stability in terms of room-and-pillar system of ore deposit mining
    Zhienbayev, Abzal
    Balpanova, Merey
    Asanova, Zhanar
    Zharaspaev, Madiyar
    Nurkasyn, Rustem
    Zhakupov, Bolegen
    MINING OF MINERAL DEPOSITS, 2023, 17 (01): : 129 - 137