Maturity model approach for building effective process safety management systems

被引:1
|
作者
Kunt, Tekin [1 ]
Breen, Madonna [1 ]
Gokce, Seckin [2 ]
Munsil, Mike [1 ]
机构
[1] PSRG Inc, 800 West Sam Houston Pkwy South,Suite 107, Houston, TX 77042 USA
[2] PSRG Inc, Istanbul, Turkiye
关键词
maturity model; PSM improvement; PSM program review;
D O I
10.1002/prs.12543
中图分类号
TQ [化学工业];
学科分类号
0817 ;
摘要
Usually, a gap analysis is conducted to address challenges encountered when building a process safety management (PSM) system from scratch, or for improving an already existing PSM program. Business maturity models, on the other hand, are useful management frameworks used to gauge the maturity of an organization in various disciplines or functions. The purpose of this paper is to introduce an adaptation of business maturity models to the PSM area.
引用
收藏
页码:233 / 238
页数:6
相关论文
共 50 条
  • [41] Management Approach for Digital Maturity of Smart Education Systems: Robustness
    Glukhova, Lyudmila V.
    Sherstobitova, Anna A.
    Gudkova, Svetlana A.
    Gudkov, Anton A.
    SMART EDUCATION AND E-LEARNING 2024, KES SEEL-2024, 2024, 399 : 199 - 209
  • [42] The Berkeley Project Management Process Maturity Model: Measuring the value of project management
    Kwak, YH
    Ibbs, CW
    EMS - 2000: PROCEEDINGS OF THE 2000 IEEE ENGINEERING MANAGEMENT SOCIETY, 2000, : 1 - 5
  • [43] Mold Building and Project Management Maturity
    Williams, Jason L.
    PLASTICS ENGINEERING, 2013, 69 (05) : 26 - 33
  • [44] A risk management approach to dealing with the year 2000 problem in process control and safety systems
    Ritchie, NW
    Ferron, P
    SEVENTY-SEVENTH ANNUAL CONVENTION OF THE GAS PROCESSORS ASSOCIATION - PROCEEDINGS, 1998, : 69 - 74
  • [45] Process Resilience Analysis Framework (PRAF): A systems approach for improved risk and safety management
    Jain, Prerna
    Pasman, Hans J.
    Waldram, Simon
    Pistikopoulos, E. N.
    Mannan, M. Sam
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2018, 53 : 61 - 73
  • [46] Performance measurement of process safety management systems
    Campbell, DJ
    Connelly, EM
    Arendt, JS
    Perry, BG
    Schreiber, S
    INTERNATIONAL CONFERENCE AND WORKSHOP ON RELIABILITY AND RISK MANAGEMENT, 1998, : 291 - 308
  • [47] IMPLEMENTING PROCESS SAFETY MANAGEMENT-SYSTEMS
    STRICOFF, RS
    PROCESS SAFETY PROGRESS, 1994, 13 (01) : 21 - 22
  • [48] A practical model for research with learning health systems: Building and implementing effective complex case management
    Smith, Maureen A.
    Nordby, Peter A.
    Yu, Menggang
    Jaffery, Jonathan
    APPLIED ERGONOMICS, 2020, 84
  • [49] Measurement of Maturity in Process Management in The Brazilian Public Sector: A Multicriteria Approach
    Bispo, Guilherme D.
    Relim, Tiago Eny
    Reis, Ana Carla B.
    Mariano, Ari Melo
    Ladeira, Marcelo
    Serrano, Andre Luiz M.
    VISION 2025: EDUCATION EXCELLENCE AND MANAGEMENT OF INNOVATIONS THROUGH SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE, 2019, : 5855 - 5869
  • [50] Process Safety Maturity Assessment Tool
    Cranston, Joey
    PROCESS SAFETY PROGRESS, 2024, 43 (04) : 621 - 627