Public Private Partnership to Brownfield Remediation Projects in China: A Combined Risk Evaluation Approach

被引:2
|
作者
Han, Qingye [1 ]
Qin, Yan [1 ]
Zhang, Heng [1 ]
Ke, Ginger Y. [2 ]
机构
[1] Chongqing Univ, Sch Management Sci & Real Estate, Chongqing 400044, Peoples R China
[2] Mem Univ Newfoundland, Fac Business Adm, St John, NF A1B 3X5, Canada
基金
中国国家自然科学基金;
关键词
brownfield; public private partnership; risk assessment; combined evaluation; FUZZY SYNTHETIC EVALUATION; WATER-SUPPLY PROJECTS; HEALTH-RISKS; REDEVELOPMENT; MANAGEMENT; MODEL;
D O I
10.3390/land13010056
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Brownfields have been receiving significant attention all over the world because of their potential threats to the environment and public health. However, a funding shortage constitutes the main obstacle to the brownfield remediation (BR). In China, to ease financial dilemmas, the governments seek collaborations with private-sector companies, i.e., the Public Private Partnership (PPP) mode. Despite all the benefits, BR and PPP contain high risks, making stakeholders extremely cautious about investing in such projects. To support the decision-making process of the public and private parties, this paper designs a comprehensive approach to evaluate the risks of BR PPP projects in China. In more detail, several commonly used risk methods, such as TOPSIS, GRE, and FSE, are employed to construct a combined risk evaluation process, which applies multiple combined evaluation techniques to iteratively integrate individual results from those methods until a valid common result is achieved. To show the practical implementation procedure of the proposed combined approach, a hypothetical case study is performed to assess the risks of seven BR PPP projects. The analytical process also verifies that the consistency and reliability of the risk evaluation result can be achieved effectively and efficiently by jointly deploying multiple risk methods through combined techniques. The proposed decision framework facilitates a novel research idea in evaluating complicated risk situations, and can be applied to other similar scenarios where uncertainties and inconsistencies are inevitable.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Evaluation Model for Assessing the Suitability of Public-Private Partnership Projects
    Cheung, Esther
    Chan, Albert P. C.
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2011, 27 (02) : 80 - 89
  • [42] Evaluation and ranking of risk factors in public-private partnership water supply projects in developing countries using fuzzy synthetic evaluation approach
    Ameyaw, Effah Ernest
    Chan, Albert P. C.
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (12) : 5102 - 5116
  • [43] Factors Influencing the Private Involvement in Urban Rail Public-Private Partnership Projects in China
    Ke, Yongjian
    Hao, Weiya
    Ding, Huiping
    Wang, Yingying
    CONSTRUCTION ECONOMICS AND BUILDING, 2017, 17 (01): : 90 - 106
  • [44] Risk assessment in straw-based power generation public-private partnership projects in China: A fuzzy synthetic evaluation analysis
    Wu, Yunna
    Li, Lingwenying
    Xu, Ruhang
    Chen, Kaifeng
    Hu, Yong
    Lin, Xiaoshan
    JOURNAL OF CLEANER PRODUCTION, 2017, 161 : 977 - 990
  • [45] THE EVOLUTION OF PUBLIC PRIVATE PARTNERSHIP PROJECTS IN ROMANIA
    Mandruleanu, Anca
    Coretchi, Dora
    BUSINESS EXCELLENCE CHALLENGES DURING THE ECONOMIC CRISIS, VOL 1, 2012, : 290 - 292
  • [46] Evaluating success of public private partnership projects
    Kusljic, Danijel
    Marenjak, Sasa
    GRADEVINAR, 2011, 63 (12): : 1079 - 1085
  • [47] An evolutionary game approach for private sectors' behavioral strategies in China's green energy public-private partnership projects
    Liu Jicheng
    Yu Jing
    Yin Yu
    Wei Qiushuang
    ENERGY REPORTS, 2021, 7 : 696 - 715
  • [48] Public-private partnership projects in Greece: risk ranking and preferred risk allocation
    Roumboutsos, Athena
    Anagnostopoulos, Konstantinos P.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2008, 26 (07) : 751 - 763
  • [49] Approaches to Risk Identification in Public-Private Partnership Projects: Malaysian Private Partners' Overview
    Sarvari, Hadi
    Valipour, Alireza
    Yahya, Nordin
    Noor, Norhazilan M. D.
    Beer, Michael
    Banaitiene, Nerija
    ADMINISTRATIVE SCIENCES, 2019, 9 (01)
  • [50] An ordinal classification of brownfield remediation projects in China for the allocation of government funding
    Han, Qingye
    Zhu, Yuming
    Ke, Ginger Y.
    Hipel, Keith W.
    LAND USE POLICY, 2018, 77 : 220 - 230