Six Sigma Project Prioritization and Selection Using AHP-CODAS Integration: A Case Study in Healthcare Industry

被引:14
|
作者
Can, Gulin Feryal [1 ]
Toktas, Pelin [1 ]
Pakdil, Fatma [2 ]
机构
[1] Baskent Univ, Ind Engn Dept, Baglica Kampusu, TR-06790 Ankara, Turkey
[2] Eastern Connecticut State Univ, Dept Management & Mkt, Willimantic, CT 06226 USA
关键词
Six sigma; Industries; Analytic hierarchy process; Uncertainty; Sensitivity analysis; Personnel; Linguistics; Analytical hierarchy process (AHP); combinative distance-based assessment (CODAS); multicriteria decision-making (MCDM); project prioritization; Six Sigma project (SSP); ANALYTIC HIERARCHY PROCESS; CRITICAL SUCCESS FACTORS; FUZZY CODAS; NEUTROSOPHIC CODAS; CONCEPTUAL-FRAMEWORK; PORTFOLIO SELECTION; SITE SELECTION; IMPLEMENTATION; DECISION; METHODOLOGY;
D O I
10.1109/TEM.2021.3100795
中图分类号
F [经济];
学科分类号
02 ;
摘要
Given the complex nature of Six Sigma project (SSP) prioritization and selection processes, multicriteria decision-making (MCDM) methods may help organizations identify the most effective projects. Considering potential limitations of subjective methods and advantages of MCDM methods, this article proposes a model that integrates analytical hierarchy process (AHP) and combinative distance-based assessment (CODAS) in SSP prioritization and selection process. In the proposed approach, AHP is employed to assign criteria weights, and CODAS is performed to determine priorities of SSPs. CODAS was advanced in term of its threshold function. Differences between Euclidean distances of two alternatives were compared, based on the standard deviation of Euclidean distances of all alternatives to overcome the subjectivity. This is the first study that combines AHP and CODAS methods for SSP selection, and CODAS is used with objective threshold value computation, and developed for the healthcare industry. In this article, ten SSPs were evaluated for four key criteria groups as financial, operational, patient centric, and organizational main criteria groups. In total, 18 subcriteria were considered under these four main criteria groups. This article provides a support for executives who make implementation plans for the potential SSPs.
引用
收藏
页码:3587 / 3600
页数:14
相关论文
共 50 条
  • [41] Six Sigma project selection using fuzzy multiple attribute decision-making method
    Wei, Chun-Chin
    Cheng, Yung-Lung
    TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2020, 31 (11-12) : 1266 - 1289
  • [42] A framework for Six Sigma project selection in higher educational institutions, using a weighted scorecard approach
    Holmes, Monica C.
    Jenicke, Lawrence O.
    Hempel, Jessica L.
    QUALITY ASSURANCE IN EDUCATION, 2015, 23 (01) : 30 - 46
  • [43] Using Shainin DOE for Six Sigma: an Indian case study
    Prashar, Anupama
    PRODUCTION PLANNING & CONTROL, 2016, 27 (02) : 83 - 101
  • [44] Developing a Hybrid Approach for Lean Six Sigma Project Management: A Case Application in the Reamer Manufacturing Industry
    Krishnan, Srijit
    Mathiyazhagan, K.
    Sreedharan, V. Raja
    IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT, 2022, 69 (06) : 2897 - 2914
  • [45] Project Management in the Chinese Construction Industry: Six-Case Study
    Chen, Ping
    Qiang, Maoshan
    Wang, Jia Ning
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (10) : 1016 - 1026
  • [46] A Six Sigma Methodology Using Data Mining: A Case Study on Six Sigma Project for Heat Efficiency Improvement of a Hot Stove System in a Korean Steel Manufacturing Company
    Jang, Gil-Sang
    Jeon, Jong-Hag
    CUTTING-EDGE RESEARCH TOPICS ON MULTIPLE CRITERIA DECISION MAKING, PROCEEDINGS, 2009, 35 : 72 - +
  • [47] Stakeholder integration in service innovation - an exploratory case study in the healthcare industry
    Jonas, Julia M.
    Roth, Angela
    INTERNATIONAL JOURNAL OF TECHNOLOGY MANAGEMENT, 2017, 73 (1-3) : 91 - 113
  • [48] Lean Six Sigma and Industry 4.0 implementation framework for operational excellence: a case study
    Tissir, Siham
    Cherrafi, Anass
    Chiarini, Andria
    Elfezazi, Said
    Shokri, Alireza
    Antony, Jiju
    TOTAL QUALITY MANAGEMENT & BUSINESS EXCELLENCE, 2024, 35 (9-10) : 1015 - 1053
  • [49] Lean six-sigma implementation in an automobile axle manufacturing industry: A case study
    Guleria, Prateek
    Pathania, Abhilash
    Sharma, Shubham
    Sa, Jose Carlos
    MATERIALS TODAY-PROCEEDINGS, 2022, 50 : 1739 - 1746
  • [50] Design for green lean six sigma to improve sustainability in the pharmaceutical industry - a case study
    Mcglinchey, Yvonne
    Iqbal, Javed
    Trubetskaya, Anna
    Thenarasu, M.
    Mcdermott, Olivia
    PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2025, 13 (01):