This study delves into the intricacies of the multi-tier dispute resolution clause in engineering contracts, particularly within the Jordanian legal system. The multi-tier dispute resolution clause has evolved from a traditional arbitration clause into a more comprehensive approach, reflecting the complexities of modern contractual relationships. The study employs a doctrinal or library-based methodology involving a comprehensive review of relevant legal texts, statutes, regulations, and case law. The multi-tier dispute resolution clause is defined as a contractual clause that stipulates the existence of different stages, each involving separate procedures, to address disputes and seek to resolve them. The study also examines the mandatory nature of the multi-tier dispute resolution clause and the procedural defense based on an arbitration clause. The study concludes that following the sequence outlined, the multi-tier dispute resolution clause should be binding. This necessitates the Jordanian legislator's intervention to establish a legislative framework that empowers decisions made by the Dispute Adjudication Board (DAB) or Dispute Avoidance/Adjudication Board (DAAB) to achieve the goals of multi-tiered dispute resolution clause. It also calls for an amendment to Article (109) of the Civil Procedure Law, allowing procedural defense based on the Multi-Tiered Dispute Resolution Clause, not limiting it to the arbitration clause, even if arbitration is not one of its tiers. This power should also extend to amicable settlements to ensure the proper implementation of the steps under the multi-tiered dispute resolution clause.
引用
收藏
页码:299 / 317
页数:19
相关论文
共 27 条
  • [11] INTERPRETING MULTIPLE DISPUTE-RESOLUTION CLAUSES IN CROSS-BORDER CONTRACTS
    Arzandeh, Ardavan
    CAMBRIDGE LAW JOURNAL, 2024, 83 (02): : 244 - 273
  • [12] Legal Review of Conditions Precedent to Dispute Resolution in Construction Contracts
    Al Qady, Mohammed
    Kandil, Amr
    Stuckey, John M.
    Mahfouz, Tarek
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2013, 5 (01) : 27 - 34
  • [13] DISPUTE RESOLUTION PROCEDURE WITHIN THE FIDIC CONTRACTS. LEGAL CHARACTERISTICS OF THE DECISION OF DISPUTE ADJUDICATION BOARD
    Sirbu, M.
    LAW BETWEEN MODERNIZATION AND TRADITION - IMPLICATIONS FOR THE LEGAL, POLITICAL, ADMINISTRATIVE AND PUBLIC ORDER ORGANIZATION, 2015, : 283 - 289
  • [14] Engineering Characteristics and Influence Factors of Multi-Tiered Reinforced Soil High Retaining Wall
    Jin J.
    Yang G.
    Wang Z.
    Wang H.
    Zhongguo Tiedao Kexue/China Railway Science, 2019, 40 (01): : 8 - 16
  • [15] Adjudication: Temporary binding and tiered dispute resolution in construction and engineering: Hong Kong experience
    Hill, Timothy
    Wall, Colin J.
    JOURNAL OF PROFESSIONAL ISSUES IN ENGINEERING EDUCATION AND PRACTICE, 2008, 134 (03) : 306 - 308
  • [16] Efficient dispute resolution mechanisms in marine insurance contracts: Legal perspectives and emerging trends
    Abuelenin, Ahmed Hany M.
    SCIENTIFIC JOURNALS OF THE MARITIME UNIVERSITY OF SZCZECIN-ZESZYTY NAUKOWE AKADEMII MORSKIEJ W SZCZECINIE, 2025, 81 (153): : 35 - 46
  • [17] ENFORCING DISPUTE RESOLUTION CLAUSES IN CONTRACTS IN NEW ZEALAND AND HONG KONG - PLUS A POSTSCRIPT ON "REASONABLE CHANCES OF SUCCESS"
    Spencer, David
    AUSTRALASIAN DISPUTE RESOLUTION JOURNAL, 2006, 17 (01): : 5 - 11
  • [18] Holistic Functioning from a Developmental Perspective: A New Synthesis with a Focus on a Multi-tiered System Support Structure
    Stodden, David F.
    Pesce, Caterina
    Zarrett, Nicole
    Tomporowski, Phillip
    Ben-Soussan, Tal Dotan
    Brian, Ali
    Abrams, T. Cade
    Weist, Mark D.
    CLINICAL CHILD AND FAMILY PSYCHOLOGY REVIEW, 2023, 26 (02) : 343 - 361
  • [19] Holistic Functioning from a Developmental Perspective: A New Synthesis with a Focus on a Multi-tiered System Support Structure
    David F. Stodden
    Caterina Pesce
    Nicole Zarrett
    Phillip Tomporowski
    Tal Dotan Ben-Soussan
    Ali Brian
    T. Cade Abrams
    Mark D. Weist
    Clinical Child and Family Psychology Review, 2023, 26 : 343 - 361
  • [20] Workshop on Legal Affairs and Dispute Resolution in Engineering and Construction, Costa Mesa, California
    Singh, Amarjit
    VanDemark, Lance
    Wendrowski, Wendy
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2024, 16 (04)