Modelling and Simulation of Existing Geothermal Power Plant: A Case Study of Darajat Geothermal Power Plant

被引:1
|
作者
Sukra, K. F. A. [1 ]
Permana, D. I. [2 ,3 ]
Adriansyah, W. [4 ]
机构
[1] Natl Res & Innovat Agcy, Res Ctr Transportat Technol, South Tangerang 15314, Indonesia
[2] Hungarian Univ Agr & Life Sci, Doctoral Sch Mech Engn, H-2100 Godollo, Hungary
[3] Inst Teknol Nas Bandung, Dept Mech Engn, Bandung 40124, Indonesia
[4] Inst Teknol Bandung, Thermodynam Labs, 3rd floor PAU Bldg, Bandung 40116, Indonesia
关键词
Geothermal energy; design; simulation; power loss; environmental relative humidity; PERFORMANCE; GENERATION; PROSPECTS; ENERGY;
D O I
10.5541/ijot.1118778
中图分类号
O414.1 [热力学];
学科分类号
摘要
The electrical energy needs grow every year, increasing awareness and use of renewable energy even higher. Geothermal power plants (GPP) are even ogled as a renewable energy source that has a lot of potential worldwide. Technology for GPP continues to evolve. However, tools for analyzing a system of GPP are still inadequate. In this study, a simple analysis tool was designed. The usefulness of this analysis tool is to be able to know the state of the GPP works. This tool will help simulate the conditions that may occur in the plant system. The simulation results will also be known operating conditions that may occur, so the operator can determine what should be done if things happen. Modeling started using Microsoft Excel, which has been equipped with thermodynamic properties. Modeling includes turbine, condenser, cooling tower, and extraction systems non-condensable gas. After validated, the model run simulation in variations that may occur such as decline in the condition of the condenser and cooling tower and environmental conditions, represented by relative humidity. The simulation with variation of condition will decrease the power generated from turbine 3 - 5%.
引用
收藏
页码:13 / 20
页数:8
相关论文
共 50 条
  • [31] A fatal case of hydrogen sulfide poisoning in a geothermal power plant
    Kage, S
    Ito, S
    Kishida, T
    Kudo, K
    Ikeda, N
    JOURNAL OF FORENSIC SCIENCES, 1998, 43 (04) : 908 - 910
  • [32] Performance and economic analysis of various geothermal power plant systems: Case study for the Chingshui geothermal field in Taiwan
    Chen, Peng-Jen
    Yeh, Tzu-Chuan
    Hsieh, Jui-Ching
    Lee, Bo-Heng
    ENERGY REPORTS, 2024, 12 : 4539 - 4554
  • [33] Hybridization of Concentrated Solar Thermal, Geothermal, and Biomass: Case Study on Kizildere-2 Geothermal Power Plant
    Celebi, Bertug
    Rohani, Shahab
    Derin-Gure, Pinar
    Chandler, Nicholas
    Hazar, Tugrul
    Halacoglu, Ural
    Baker, Derek
    ENERGIES, 2024, 17 (21)
  • [34] DEVELOPMENT OF PLANT PERFORMANCE ANALYSIS SYSTEM FOR GEOTHERMAL POWER PLANT
    Nakao, Yoshinobu
    Takahashi, Toru
    Watanabe, Yutaka
    PROCEEDINGS OF THE ASME POWER CONFERENCE - 2011, VOL 2, 2012, : 551 - 555
  • [35] Simulation of Working Age Effect on the Geothermal Power Plant Generators Efficiency
    Aziz, R. A.
    Sucita, T.
    INTERNATIONAL SYMPOSIUM ON MATERIALS AND ELECTRICAL ENGINEERING (ISMEE) 2017, 2018, 384
  • [36] THE BOUILLANTE GEOTHERMAL POWER-PLANT, GUADELOUPE
    JAUD, P
    LAMETHE, D
    GEOTHERMICS, 1985, 14 (2-3) : 197 - 205
  • [37] First geothermal pilot power plant in Hungary
    Bobok, Elemer
    Toth, Aniko
    ACTA MONTANISTICA SLOVACA, 2007, 12 : 176 - 180
  • [38] Steam power plant associated with geothermal well
    Buchta, Janusz
    PRZEGLAD ELEKTROTECHNICZNY, 2008, 84 (02): : 68 - 71
  • [39] SPECIFIC OUTPUT POWER OF A DRY GEOTHERMAL PLANT
    WU, C
    ENERGY, 1991, 16 (04) : 757 - 761
  • [40] Performance analysis of Germencik Geothermal Power Plant
    Unverdi, Murat
    Cerci, Yunus
    ENERGY, 2013, 52 : 192 - 200