Numerical Simulation of Piled-Raft Foundation in Cohesionless Soil using ABAQUS

被引:1
|
作者
Khan, Zehra [1 ]
Sharma, Abhishek [1 ]
机构
[1] Chandigarh Univ, Civil Engn Dept, Mohali, Punjab, India
来源
JOURNAL OF MINING AND ENVIRONMENT | 2023年 / 14卷 / 04期
关键词
Piled-raft foundation; Settlement; Numerical analysis; Load carrying capacity; BEARING CAPACITY; BEHAVIOR; DESIGN;
D O I
10.22044/jme.2023.13324.2448
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Due to rapid growth in infrastructure sector, the construction of high-rise buildings is becoming very popular among all the countries. Engineers face significant issues with high rise buildings, particularly in terms of structural and foundation aspects. Many old design approaches can't be used with certainty since they involve extrapolation far beyond the domains of existing experience, hence structural and geotechnical engineers are being compelled to use more advanced analysis and design methodologies. The current study is an attempt to predict the bearing capacity and settlement behavior of piled-raft footing when embedded into cohesionless deposit. The numerical analysis has been carried out to examine the effect of numerous key parameters of pile and raft such as pile length (10, 15, 20 m), pile diameter (0.3, 0.4, 0.5 m), pile number (16, 20, 24), pile spacing (2D, 3D, 4D) (where "D" is diameter of the pile), raft thickness (0.4, 0.5, 0.6 m), and angle of internal friction of soil (25 degrees, 30 degrees, 35 degrees) on load-settlement behavior of the piled- raft foundation using ABAQUS software. A constant spacing between the piles, i.e. 3D was used throughout the analysis. The results of numerical investigation revealed an improvement in bearing capacity and a reduction in settlement value on increasing length, diameter and number of piles and also with increasing angle of internal friction. The current study not only increases the bearing capacity of the foundation but provides a cost-effective foundation technique to engineers.
引用
收藏
页码:1183 / 1203
页数:21
相关论文
共 50 条
  • [31] Coupled Computational Analysis of Piled-raft System on Saturated Rheologic Geomaterial Foundation
    Cui Chun-yi
    Chen Shou-long
    SPORTS MATERIALS, MODELLING AND SIMULATION, 2011, 187 : 631 - 636
  • [32] Effect of interactions between piled raft components and soil on behavior of piled raft foundation
    Sungjune Lee
    Joon-Shik Moon
    KSCE Journal of Civil Engineering, 2017, 21 : 243 - 252
  • [33] Effect of interactions between piled raft components and soil on behavior of piled raft foundation
    Lee, Sungjune
    Moon, Joon-Shik
    KSCE JOURNAL OF CIVIL ENGINEERING, 2017, 21 (01) : 243 - 252
  • [34] Effect of Pile Configuration on the Behavior of Piled-Raft Foundations in Sandy Soil
    Fattah, Mohammed Y.
    Waheed, Mohanned Q.
    Hadi, Dheaa H.
    JOURNAL OF TESTING AND EVALUATION, 2023, 52 (01) : 165 - 182
  • [35] 3D Numerical Modeling of Large Piled-Raft Foundation on Clayey Soils for Different Loadings and Pile-Raft Configurations
    Mali, Shivanand
    Singh, Baleshwar
    STUDIA GEOTECHNICA ET MECHANICA, 2020, 42 (01) : 1 - 17
  • [36] MECHANICAL BEHAVIORS OF PILED-RAFT FOUNDATION AND DIAPHRAGM WALL IN DEEP EXCAVATION OF TAIPEI METROPOLITAN
    Lin, Der-Guey
    Liu, Wen-Tsung
    Chou, Jui-Ching
    JOURNAL OF MARINE SCIENCE AND TECHNOLOGY-TAIWAN, 2016, 24 (05): : 980 - 991
  • [37] Comparative Analysis of Axial Load Capacity for Piled-Raft Foundation with Changes in Groundwater Level
    Roh, Yanghoon
    Kim, Incheol
    Kim, Garam
    Lee, Junhwan
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (10) : 4250 - 4258
  • [38] Comparative Analysis of Axial Load Capacity for Piled-Raft Foundation with Changes in Groundwater Level
    Yanghoon Roh
    Incheol Kim
    Garam Kim
    Junhwan Lee
    KSCE Journal of Civil Engineering, 2019, 23 : 4250 - 4258
  • [39] Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure
    Gu, Linlin
    Ye, Guanlin
    Wang, Zhen
    Ling, Xianzhang
    Zhang, Feng
    EARTHQUAKE ENGINEERING AND ENGINEERING VIBRATION, 2017, 16 (03) : 499 - 511
  • [40] Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure
    Gu Linlin
    Ye Guanlin
    Wang Zhen
    Ling Xianzhang
    Zhang Feng
    Earthquake Engineering and Engineering Vibration, 2017, 16 (03) : 499 - 511