共 50 条
- [31] SEQUENCE-DEPENDENT ROBOTIC DISASSEMBLY LINE BALANCING PROBLEM CONSIDERING DISASSEMBLY PATH PROCEEDINGS OF THE ASME 2020 15TH INTERNATIONAL MANUFACTURING SCIENCE AND ENGINEERING CONFERENCE (MSEC2020), VOL 2B, 2020,
- [32] A PROMETHEE Method Based Heuristic for Disassembly Line Balancing Problem INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2013, 12 (03): : 254 - 263
- [33] ENUMERATIVE SEARCH ALGORITHM FOR ROBOTIC DISASSEMBLY LINE BALANCING PROBLEM INTERNATIONAL JOURNAL OF ROBOTICS & AUTOMATION, 2021, 36 (01): : 35 - 43
- [34] 2-opt heuristic for the disassembly line balancing problem ENVIRONMENTALLY CONSCIOUS MANUFACTURING III, 2004, 5262 : 71 - 84
- [36] Multi-objective Optimizer with Collaborative Resource Allocation Strategy for U-shaped Stochastic Disassembly Line Balancing Problem 2021 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC), 2021, : 2316 - 2321
- [39] Human-Robot Collaboration on a Disassembly-Line Balancing Problem with an Advanced Multiobjective Discrete Bees Algorithm SYMMETRY-BASEL, 2024, 16 (07):