Analysis of the Influence of Pile-Raft Foundation Reinforcement on an Adjacent Existing Line Foundation

被引:0
|
作者
Zuo, Shen [1 ]
Zuo, Xianglong [1 ]
Li, Jin [1 ]
Liu, Peng [2 ,3 ]
Cui, Xinzhuang [4 ]
机构
[1] Shandong Jiaotong Univ, Sch Civil Engn, 5 Jiaoxiao Rd, Jinan 250357, Peoples R China
[2] Cent South Univ, Sch Civil Engn, 22 Shaoshan Rd, Changsha 410075, Peoples R China
[3] Cent South Univ, Natl Engn Lab High Speed Railway Construction, Changsha 410075, Peoples R China
[4] Shandong Univ, Sch Civil Engn, 27 Shanda Rd, Jinan 250061, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2023年 / 13卷 / 05期
基金
美国国家科学基金会; 中国国家自然科学基金;
关键词
intercity railway; pile-raft foundation reinforcement; adjacent existing lines; field test; subgrade protection; track-inspection car;
D O I
10.3390/app13052820
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Pile-raft foundation reinforcement will have a certain impact on the adjacent existing line foundation, which will affect the normal service of the subgrade, and even lead to the instability of the subgrade. Until now, there have been few studies on adjacent construction problems, and there are few field experimental data available for us to consult. Therefore, this study relies on the construction project of Shanghai-Nanjing intercity high-speed railway close to the existing line, using in situ monitoring methods, such as stress shovels, horizontal strain gauges, and inclinometers combined with finite-element calculation and rail-inspection vehicle-data analysis. The stress, displacement, and geometric linearity of the adjacent existing line foundation during the reinforcement construction of a pile-raft foundation were studied. Our aim was to measure the impact and optimize the existing roadbed-protection measures employed during the construction period. We found that the cumulative horizontal displacement of the existing line foundation slope toe during the construction period was 24.25 mm, and the lateral displacement rate was less than 0.59 mm/d. The distance between the two lines was 9 m. The horizontal stress of the foundation soil in the depth range varied according to extrusion and retraction with the different construction stages, and the extrusion stress was less than 10 kPa. The horizontal stress changes in different construction stages were not obvious; the track quality index (TQI) in the existing track inspection during the construction period increased by 129.58%, and the existing track geometric linearity fluctuated greatly. According to the test results, the excavation stage of the subgrade foundation pit was the most dangerous stage of the existing subgrade during the construction of the new line pile-raft foundation. Although the change of the horizontal stress in different construction stages was not obvious, the horizontal displacement of the slope toe was sensitive to the construction process. Therefore, it could be used as a key indicator to monitor the deformation and stability of the existing subgrade. The correction coefficient was obtained by combining the detection data of the track-inspection vehicle with the finite element calculation data, based on which the accurate estimation of the horizontal displacement of the slope toe after the excavation of the foundation pit was realized. The monitoring and evaluation method of the stability of the existing line foundation under the influence of the pile-raft foundation reinforcement construction was preliminarily established through field monitoring and the analysis of the track-inspection data. Based on this method, relevant early warning values were proposed. The test results and engineering measures ensured the safe operation of the existing line foundation. This has important theoretical significance for guiding the construction of a new subgrade of adjacent existing lines.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] Interaction between tall superstructure, pile-raft foundation and soil in loess area
    Yao, Y.P.
    Zhang, B.Y.
    Zhang, G.Q.
    Zhnag, W.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2001, 23 (03):
  • [32] Soil-structure interaction in a combined pile-raft foundation - a case study
    Kumar, Ashutosh
    Patil, Milind
    Choudhury, Deepankar
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-GEOTECHNICAL ENGINEERING, 2017, 170 (02) : 117 - 128
  • [33] Thermomechanical behaviour of an energy pile-raft foundation under intermittent cooling operation
    Li, Renrong
    Kong, Gangqiang
    Chen, Yonghui
    Yang, Qing
    GEOMECHANICS FOR ENERGY AND THE ENVIRONMENT, 2021, 28
  • [34] Comparative Analysis of Kazakhstani and European Design Specifications: Raft Foundation, Pile Foundation, and Piled Raft Foundation
    Zhanabayeva, Assel
    Sagidullina, Nazerke
    Kim, Jong
    Satyanaga, Alfrendo
    Lee, Deuckhang
    Moon, Sung-Woo
    APPLIED SCIENCES-BASEL, 2021, 11 (07):
  • [35] Field tests on thermal-mechanical coupling characteristics of energy pile in pile-raft foundation
    Lu Chen-kai
    Kong Gang-qiang
    Sun Guang-chao
    Chen Bin
    Yin Gao-xiang
    ROCK AND SOIL MECHANICS, 2019, 40 (09) : 3569 - 3575
  • [36] Study on the Optimal Construction Time of Adjacent Pile Foundation Considering the Thermal Stability of the Existing Pile Foundation
    Shi, Xiangyang
    Wang, Yunxing
    Zhou, Ziqiang
    Huang, Long
    BUILDINGS, 2025, 15 (05)
  • [37] Dimensional Influence of Tunneling on Adjacent Pile Foundation
    Ma, Shaokun
    Zho, Xiaobing
    Hu, Ping
    Han, Guoliang
    Yao, Xiao
    Ou, Xiaoduo
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 639 - +
  • [38] Non-linear numerical analysis of interaction among pile-raft foundation, tube structure and soil
    Zhou, Ding-Song
    Lu, Xi-Lin
    Wang, Ying-Ge
    Tongji Daxue Xuebao/Journal of Tongji University, 2003, 31 (09): : 1019 - 1023
  • [39] Closed-form solution for natural frequency of flexible combined pile-raft foundation
    Bhaduri, Aniruddha
    Choudhury, Deepankar
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 2024, 53 (01): : 515 - 524
  • [40] Settlement behavior of piled raft foundation supporting residential building adjacent to tall pile foundation building
    Hamada, Junji
    Yamashita, Kiyoshi
    Nakane, Kazutomi
    GEOTECHNICS FOR SUSTAINABLE INFRASTRUCTURE DEVELOPMENT, 2020, 62 : 27 - 32