Metaheuristic approach proposal for the solution of the bi-objective course scheduling problem

被引:3
|
作者
Can, E. [1 ]
Ustun, O. [1 ]
Saglam, S. [2 ]
机构
[1] Kutahya Dumlupinar Univ, Dept Ind Engn, Kutahya, Turkiye
[2] Kutahya Dumlupinar Univ, Dept Informat, Kutahya, Turkiye
关键词
Multi-objective optimization; Conic scalarization; Tabu search algorithm; Experimental design; Timetabling; PROGRAMMING APPROACH; SEARCH ALGORITHM;
D O I
10.24200/sci.2021.55005.4044
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Timetabling problems are among the commonly encountered problems in real life, from education institutions to airline companies. It is generally difficult to obtain optimal solutions to timetabling problems that vary in terms of structures of constraints and objective functions, and these problems belong to the NP-hard category, which means that they cannot be solved in polynomial time in real life. In this study, a bi-objective mathematical model is proposed for a course scheduling problem at Kutahya Dumlupinar University, Department of Industrial Engineering. The first objective function aims to maximize the sum of the preferences of instructors determined using the Analytic Hierarchy Process method, and the second objective function is to minimize the cases of course overlap for students. Conic scalarization method is used to combine the objective functions. Due to NP-hard nature of the problem, the Tabu Search Algorithm as a metaheuristic approach is used to solve it. Using the obtained data and by considering the proposed bi-objective mathematical model, the Tabu Search Algorithm is designed for the problem and dealt with in the Excel Visual Basic program. The experimental results are evaluated through Analysis of Variance using Minitab Program. Based on the comaprison of the results, satisfactory solutions are obtained. (c) 2023 Sharif University of Technology. All rights reserved.
引用
收藏
页码:1435 / 1449
页数:15
相关论文
共 50 条
  • [31] Modeling and solving for bi-objective cutting parallel machine scheduling problem
    Ronghua Meng
    Yunqing Rao
    Qiang Luo
    Annals of Operations Research, 2020, 285 : 223 - 245
  • [32] A simheuristic for bi-objective stochastic permutation flow shop scheduling problem
    Maria Gonzalez-Neira, Eliana
    Rafael Montoya-Torres, Jairo
    JOURNAL OF PROJECT MANAGEMENT, 2019, 4 (02) : 57 - 80
  • [33] A Lexicographic Bi-objective Scheduling Problem From Steel Production Systems
    Zhao, Ziyan
    Zhou, MengChu
    Liu, Shixin
    Guo, Xiwang
    Liu, Haoyue
    IFAC PAPERSONLINE, 2020, 53 (05): : 158 - 163
  • [34] A Bi-Objective Model for a Stage Shop Scheduling Problem with HumanRobot Collaboration
    Ghasemkhani, Ahmad
    Tavakkoli-Moghaddam, Reza
    Hamid, Mahdi
    Nasiri, Mohammad Mahdi
    IFAC PAPERSONLINE, 2022, 55 (10): : 1290 - 1295
  • [35] A Pareto-metaheuristic for a bi-objective winner determination problem in a combinatorial reverse auction
    Buer, Tobias
    Kopfer, Herbert
    COMPUTERS & OPERATIONS RESEARCH, 2014, 41 : 208 - 220
  • [36] An Effective Metaheuristic for Bi-objective Feature Selection in Two-Class Classification Problem
    Lyubchenko, A. A.
    Pacheco, J. A.
    Casado, S.
    Nunez, L.
    XII INTERNATIONAL SCIENTIFIC AND TECHNICAL CONFERENCE APPLIED MECHANICS AND SYSTEMS DYNAMICS, 2019, 1210
  • [37] RNN Modelling for Bi-objective MPM Job Shop Scheduling Problem
    Tselios, Dimitrios
    Savvas, Ilias
    Kechadi, M-Tahar
    2013 FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE, COMMUNICATION SYSTEMS AND NETWORKS (CICSYN), 2013, : 13 - 18
  • [38] A parallel bi-objective hybrid metaheuristic for energy-aware scheduling for cloud computing systems
    Mezmaz, M.
    Melab, N.
    Kessaci, Y.
    Lee, Y. C.
    Talbi, E. -G.
    Zomaya, A. Y.
    Tuyttens, D.
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2011, 71 (11) : 1497 - 1508
  • [39] The Bi-objective EPQ Problem: Fuzzy Goal Attainment Approach
    Karmakar S.
    De S.K.
    Goswami A.
    International Journal of Applied and Computational Mathematics, 2017, 3 (Suppl 1) : 569 - 598
  • [40] A green approach for a bi-objective programming inventory routing problem
    He, Dongdong
    Zhong, Qiuyan
    Qu, Yi
    Du, Peng
    Lin, Zhengkui
    ICIC Express Letters, 2016, 10 (06): : 1375 - 1381