The severity of design-construction interface risks in Jordanian construction industry

被引:10
|
作者
Abu-Reishah, Lama [1 ]
Hiyassat, Mohammed A. [1 ]
机构
[1] Univ Jordan, Dept Civil Engn, Amman, Jordan
关键词
Interface risk; risk matrix; construction project; MANAGEMENT; FRAMEWORK;
D O I
10.1080/15623599.2021.1983930
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The fragmented nature of the construction industry makes the management of a project a challenge mission. The interfaces between activities require attention to ensure a smooth performance. Interface risks affecting project constraints arise due to many internal and external causes. The main objective of this study is to identity, prioritize, eliminate, and alleviate interface risks. The data was collected from 155 respondents to a questionnaire; which was checked for reliability and validity using Cronbach alpha coefficient and EFA, respectively. ANOVA test was used to show if significant differences exist between the groups of respondents. According to the results of the risks-assessment matrix, the most two severe causes of interface risks are: awarding the contract to the lowest bidder regardless of the quality, and change in the owner's requirements. The study recommends that construction parties should develop a comprehensive strategy in establishing a sustainable interface-risks management. This study serves as another tool that can help construction professionals and researchers in dealing with similar interface risks. Also-beside findings from other studies-construction agencies such as FIDIC can modify their conditions accordingly when dealing with such risks.
引用
收藏
页码:1540 / 1548
页数:9
相关论文
共 50 条
  • [21] Lessons from Using BIM to Increase Design-Construction Integration
    Luth, Gregory P.
    Schorer, Alyssa
    Turkan, Yelda
    PRACTICE PERIODICAL ON STRUCTURAL DESIGN AND CONSTRUCTION, 2014, 19 (01) : 103 - 110
  • [22] Design-construction of Sorell Causeway Channel Bridge, Hobart, Tasmania
    Gibbens, B
    Smith, PS
    PCI JOURNAL, 2004, 49 (03): : 56 - +
  • [23] Design-construction of Vranov lake pedestrian bridge, Czech Republic
    Strasky, J
    PCI JOURNAL, 1997, 42 (06): : 60 - +
  • [24] Design-Construction Phase Safety Risk Analysis of Assembled Buildings
    Lv, Ran
    Chen, Jiaying
    Sun, Qiao
    Ye, Ziyang
    BUILDINGS, 2023, 13 (04)
  • [25] INCREASED ENERGY SAVINGS IN BUILDINGS THROUGH AN INTEGRATED APPROACH TO DESIGN-CONSTRUCTION
    MILLER, DR
    INTERNATIONAL JOURNAL FOR HOUSING SCIENCE AND ITS APPLICATIONS, 1980, 4 (05): : 411 - 417
  • [26] ACHIEVING A BALANCE BETWEEN DEMANDS OF REGULATORY PROCESS AND DESIGN-CONSTRUCTION PROCESS
    BRUSH, HF
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1974, 19 (OCT27): : 299 - 300
  • [27] Design-construction of a Breakwater/Pier Structure at US Naval Station Everett
    Rusten, A
    Zahn, J
    PCI JOURNAL, 2000, 45 (02): : 28 - +
  • [28] Project performance measurement for small-and-medium sized construction contractors in the Jordanian construction industry
    Alkilani, Suhair
    Loosemore, Martin
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2022, 40 (10) : 743 - 769
  • [29] Minimizing delays in the Jordanian construction industry by adopting BIM technology
    Btoush, M.
    Harun, A. T.
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [30] Factors leading to design changes in Jordanian construction projects
    Gharaibeh, Lina Ghazi
    Matarneh, Sandra T.
    Arafeh, Mazen
    Sweis, Ghaleb
    INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, 2021, 70 (04) : 893 - 915