Development of a Performance Assessment Model for Contractors in Saudi Arabian Construction Projects

被引:1
|
作者
Alfalah, Ghasan [1 ]
Aldajani, Saad [2 ]
Elshaboury, Nehal [3 ]
Al-Sakkaf, Abobakr [4 ]
Alshamrani, Othman [2 ]
机构
[1] King Saud Univ, Coll Architecture & Planning, Dept Architecture & Bldg Sci, Riyadh 145111, Saudi Arabia
[2] Imam Abdulrahman Bin Faisal Univ, Coll Architecture & Planning Bldg Engn, Dammam 31451, Saudi Arabia
[3] Construct & Project Management Res Inst, Housing & Bldg Natl Res Ctr, Giza 12311, Egypt
[4] Concordia Univ, Dept Bldg Civil & Environm Engn, Montreal, PQ H3G 1M8, Canada
关键词
INDICATORS;
D O I
10.1155/2024/8780539
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Saudi Arabia leads the Gulf Cooperation Council countries in the construction industry, with 63% of the region's future projects and $1.4 trillion in building and transportation projects. Previous studies have shown that 60% of construction projects are behind the schedule. One of the reasons behind this delay is the inappropriate selection of contractors for construction projects; therefore, the development of a contractor performance assessment model is needed for construction projects in Saudi Arabia. The proposed model includes the major key performance indicators (KPIs) used to measure contractors' performance in construction projects. Afterward, a questionnaire is conducted with construction professionals to recommend the important KPIs to consider while developing the model. The analytic hierarchy process decision-making technique is applied for assessing relative priorities among the identified KPIs based on expert or decision-maker consensus. The results show that the time category is the most important in selecting the best contractor, emphasizing the significance of timely project completion.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] Exploring performance areas and developing performance assessment model for a construction projects in India
    Ingle, Prachi Vinod
    Mahesh, Gangadhar
    JOURNAL OF FACILITIES MANAGEMENT, 2024, 22 (04) : 521 - 547
  • [22] The impact of contractors' management capability on cost and time performance of construction projects in Nigeria
    Aje, O.
    Odusami, K.
    Ogunsemi, D.
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2009, 14 (02) : 171 - +
  • [23] Unbalanced bidding in construction projects: a contractors' perspective
    Hyari, Khaled Hesham
    Alamayreh, Thamer
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2023, 23 (12) : 2058 - 2066
  • [25] Introducing a New Risk Management Model to the Saudi Arabian Construction Industry
    Algahtany, Mohammed
    Alhammadi, Yasir
    Kashiwagi, Dean
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 940 - 947
  • [26] Using PIPS to minimize causes of delay in Saudi Arabian construction projects: university case study
    Alzara, Majed
    Kashiwagi, Jacob
    Kashiwagi, Dean
    Al-Tassan, Abdulrahman
    ICSDEC 2016 - INTEGRATING DATA SCIENCE, CONSTRUCTION AND SUSTAINABILITY, 2016, 145 : 932 - 939
  • [27] Performance Evaluation of Control Variables for the Development of a Blockchain Model for Construction Projects
    Sarkar, Debasis
    Raval, Purvesh
    Lecture Notes in Civil Engineering, 2024, 364 : 527 - 550
  • [28] SUCCESS FACTORS FOR TAIWANESE CONTRACTORS COLLABORATING WITH LOCAL CHINESE CONTRACTORS IN CONSTRUCTION PROJECTS
    Kao, Chih-Han
    Huang, Cheng-Han
    Hsu, Mark Shu-Chien
    Tsai, I-Hung
    JOURNAL OF BUSINESS ECONOMICS AND MANAGEMENT, 2016, 17 (06) : 1007 - 1021
  • [29] MATCHING THE PERFORMANCE OF SAUDI ARABIAN OIL FIELDS WITH AN ELECTRICAL MODEL
    WAHL, WL
    MULLINS, LD
    BARHAM, RH
    BARTLETT, WR
    TRANSACTIONS OF THE SOCIETY OF PETROLEUM ENGINEERS OF AIME, 1962, 225 (11): : 1275 - 1282
  • [30] Development of knowledge model for construction projects
    Tibaut, Andrej (andrej.tibaut@um.si), 2015, Springer Verlag (224):